HomeMy WebLinkAboutRES 25-007RESOLUTION NO.25-007 BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF BEAUMONT: THAT the City Manager be and lie is hereby authorized to award a contract to Brystar Contracting Inc., of Beaumont, Texas, for• the Fannin Street and IIth Street Storm Sewer Point Repair and Cavity Repair• Emergency Project, in an amount not to exceed $112,334.00. The meeting at which this resolution was approved was in all things conducted in strict compliance with the Texas Open Meetings Act, Texas Government Code, Chapter 551. BEAUMONT I T E X A S December 20, 2024 City of Beaumont Purchasing Department 801 Main Street, Suite 320 Beaumont, Texas 77701 Re: Fannin Street and lltt Street Emergency Storm Sewer Point Repair and Cavity Repair This letter is to Inform you that the City of Beaumont Engineering Department was notified by the Streets and Drainage department about a cavity In City right of way at the intersection of Fannin Street and 11th Street on December 18, 2024. On site investigation and inspection of the utilities in this area led to the discovery that the storm sewer along 11th Street had a failure near the connection point to the box culvert trunk line that runs along Fannin Street. This failure lead to the large cavity showing on the surface and exposing several other utilities, including an AT&T fiber optic duct bank, sanitary sewer line, gas line, several utility poles In proximity and also an AT&T electrical box that has been undermined to the point It is falling Into the cavity. Due to the size of the cavity, the exposure and undermining of other Infrastructure, and the preliminary findings of the survey and inspection showing defects with the storm line, Public Works/Engineering has determined that the repair of these cavities and repair of the storm sewer line, must be performed on an emergency basis, Engineering has received a not to exceed cost proposal from Brystar Contracting to stabilize the utilities within the cavity by backfilling, and then performing the storm sewer repair to prevent any further damage, This not to exceed budget provided is $112,334.00. If you have any further questions, please feel free to contact me at (409) 880-3725. Sincer i , e41 ael Blrtt artkowiak Director of Public Works PUBLIC WORKS 1111110 T 409.880.3725 F 409.880,3732 PO Box 38271 Beaumont, TX 77704 801 Main St. 12"d Floor 1 Beaumont, TX 77701 beaumonttexas,gov � f N l { 1 rr z 1 8385 Chomicul Rwad - Beaumont, Tcxats 77705 •(409) 842-6768 December 19, 2024 Molly Villarreal, P.E. - City Engineer David Tingle, E.I.T. --Public Works Design Manager City Hall, 801 Main Street Beaumont, Texas 77701 Re: Fannin & I V" Street Emergency Sinkhole Based on the site visit and correspondence with the City of Beaumont dated December 18, 2024, Brystar offers the following information for your review. Not To Exceed Bud et $112 334.00 Scope of Work: - Backfill Hole w/ Cement Stabilized Sand Before Christmas & New Year Break After the Break, Setup Traffic Control Remove Sidewalk, Curb, and Pavement Grout and Abandon Existing 30" Pipe - Modify Existing Inlet (Add Grate) - Install 30" RCP (Tie Into Existing Inlet and Box Culvert) Install Concrete Pavement & Limestone Base Subgrade Install Sidewalk and Curb Sodding Exclusions- - SWPPP - Permits, Bonds, Fees Brystw Contracting appreciates the opportunity to submit this proposal. Should you have any questions or concerns, please do not hesitate to call, Sincerely, Trevor Holmes Project Manager treyor9r,brystar,com 409-659-7334