HomeMy WebLinkAboutRES 25-026RESOLUTION NO.25-026 BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF BEAUMONT: WHEREAS, on December 17, 2024, by Resolution 24-334, City Council awarded a contract to Brystar Contracting, Inc., of Beaumont, Texas, in the amount of $128,771.00 for the Cattail Marsh Levee Emergency Repair Project; and, WHEREAS, on January 9, 2025, Brystar Contracting, Inc., submitted an updated time and materials proposal estimated in the amount of $25,000,00, to install and compact limestone base at various locations where haul trucks have damaged the existing levee road during construction; and, WHEREAS, although the original not to exceed estimate accounted for restoring sections of the levee road along the haul route, the damage exceeded what was estimated before the project began due to unknowns about the stability of the existing levee road. If approved, the new contract amount would be $153,771.00; NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF BEAUMONT: THAT the statements and findings set out in the preamble to this resolution are hereby, in all things, approved and adopted; and, THAT the submitted updated proposal by Brystar Contracting, Inc., of Beaumont, Texas in the amount of $25,000.00, as shown in Exhibit "A," be accepted by the City of Beaumont. The meeting at which this resolution was approved was in all things conducted in strict compliance with the Texas Open Meetings Act, Texas Government Code, Chapter 551. 2025. PASSED BY T14E CITY COUNCIL of the City of Beaumont this the 4th day of February, 0 -Ilk vol z - Mayor Roy West - r 3$ , Chemical Rog4,- BQa,u Yloj%:te3 (qS 77705. • (409} 90-6760 January 9, 2025 Molly Villarreal, P.E. - City Engineer David Tingle, E.Z.T. — Public Works Design Manager City Hall, 801 Main Street Beaumont, Texas 77701 Re: Cattail Marsh Wetlands Repair — Haul Route Road Not To Exceed Bud et $25 000.00 Working Days: 2 Working Days Scope of Work: Install and compact limestone base at various locations where Haul trucks have caused damage to the existing levee road, Notes: This work is only for disturbed areas caused by haul tucks in the haul route during the construction of the Cattail Marsh Wetlands Repair project, PO number 451851. Brystar Contracting appreciates the opportunity to submit this proposal. Should you have any questions or concerns, please do not hesitate to call. Sincerely, Trevor Holmes Project Manager trevor@brystar,com 409-659-7334