Loading...
HomeMy WebLinkAboutRES 25-034 RESOLUTION NO. 25-034 BE IT RFSOLVED BY THE CITY COUNCIL OF THE CITY OF BEAUMONT: THAT the City Manager be and he is izereby autlzorized to award a contract to Brystar Contracting Inc_, of Beaiiiriont, Texas, for tlze amergency repair of a 24" wastewater main on Washington Boulevard, in an a.rrloi.irrt not to exceed $163,826_00. Tl-ie meeting at wliicli tYi3s rasolution was approved was in all tl-iings conducted in strict compliance witlz tlze Texas Open Meetings Act, Texas Government Code, Cl�apter 551_ PASSED BY THE CITY COZ_JIVCIL of the City o£ Beaiiinont this tl-ie 18t1� day of February, 2025. s�����`OM_`�e'�S • �� � � � - M or Roy We - IS.�, � Iis � ���. � �,,` ��``vav��� BEAUMONT TEXAS February 4, 2025 City of Beaumont Purchasing Department 801 Main Street,Suite 320 Beaumont,Texas 77701 Re: Wastewater Line Repair at 5250 Washington Blvd. This letter is to inform you that the City of Beaumont is aware of a cavity forming under Washington Blvd. due to the failure of a 24"wastewater main. Rainwater is entering the broken main,which is causing the cavity to grow.We are concerned that if the cavity continues to expand, it could lead to a street collapse, posing a risk to public health and safety. Due to the potential threat to public health,Water Utilities has determined#hat this repair must be performed on an emergency basis to prevent worsening of the cavity and a collapse of Washington Blvd. We are currently working with Water Engineering to secure a contractor to perform the necessary repair. If you have any further questions, please fieel free to contact me at(409) 785-3003. Sincerely, __���_���..—� Michael Harr'is Director of Water and Sewer Qperations CI7'Y UTILITIES Q T 409.866.0026 C 409.861.4836 1350 Langham Road�Beaumonf TX 777U7 beaumonttexas.gov �YST,q $ �' CONTRACT/NG, /NC. $385 C;hemical Road•Bcaumont,Texas 77705.•(409) 842-6768 February 7,2025 Molly Villarreal, P.E. -City Engineer John Pippins—Water Utilities Design Manager City of Beaumont Re: 5250 Washington BLVD Sanitary Sewer Emergency Point Repair Based on plan sheet No. 2 dated 02/OS/2025 and correspondence with John Pippins with the City of Beaumont, Brystar offers the following information for your review. Not To Exceed Bud�et $163,826.00 Scope of Work: - Traffic Control - Bypass Pumping - Remove Asphalt, Concrete, and Subgrade - Point Repair on 24" Sanitary Sewer • Backfill with Cement Stabilized Sand up to Subgrade - Install Base, Concrete, and Asphalt - Material Testing Included Exclusions: - SWPPP - Permits, Bonds, Fees Note: This proposal is good for up to 18 LF of sewer line repair. Any additional footage will be at an additional cost. Brystar Contracting appreciates the opportunity to submit this proposal. Should you have any questions or concerns,please do not hesitate to call. Sincerely, Trevor Holmes Estimator/Proj ect Manager trevor(�a,brvstar.com 409-659-7334