HomeMy WebLinkAboutRES-24-321RESOLUTION NO. 24-321 BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF BEAUMONT: WHEREAS, on November 7, 2024, the City solicited bids for the Pine Street SWTP South Basin Sludge Drain Rehabilitation Project; and, WHEREAS, two (2) bids were received for furnishing all labor, materials, and equipment for the project; and, WHEREAS, SETEX Construction Corp., of Beaumont, Texas, submitted a bid for an amount of $333,562.38, as shown in Exhibit "A," attached hereto; and, WHEREAS, City Council is of the opinion that the bid submitted by SETEX Construction Corp., of Beaumont, Texas is the lowest bidder providing the best value to the City and should be accepted; NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF BEAUMONT: THAT the statements and findings set out in the preamble to this resolution are hereby, in all things, approved and adopted; and, THAT the bid submitted by SETEX Construction Corp., of Beaumont, Texas in the amount of $333,562.38, as shown in Exhibit "A," be accepted by the City of Beaumont; and, BE IT FURTHER RESOLVED THAT the City Manager be and he is hereby authorized to execute a contract with SETEX Construction Corp., of Beaumont, Texas, for the purposes described herein. The meeting at which this resolution was approved was in all things conducted in strict compliance with the Texas Open Meetings Act, Texas Government Code, Chapter 551. PASSED BY THE CITY COUNCIL of the City of Beaynont this the 3rd day of December, 2024. - Mayor Roy West - TEXAS BID TABULATION Pine St. SWTP South Basin Sludge Drain Rehabilitation WU1025.01 BID OPENING DATE: 11/07/2024 at 2:00 p.m. The Bid Proposals submitted have been reviewed and to the best of my knowledge this is an accurate tabulation of the bids received. Brent Schmitt, P.E., Water Utilities Engineer IF of • ' BRENT R. SC!-! iTT .. 137915 :ram ICE V %oYlONAL-��\®�• __Z__0_-_.2_0241 ITEM CITY UNIT DESCRIPTION Bid Schedule (Engineer's Estimate) SETEX Construction Corp 6555 College St., Suite 103 Beaumont, TX 77707 (Nathan Rivers) MK Constructors (BDS Constructors LLC dba MK Constructors) 16736 I(Mi a Sur e) 77662 (Mike Su Ire) UNIT PRICE TOTAL UNIT PRICE TOTAL UNIT PRICE TOTAL 1 1 Mobilization Not to exceed 3% of Total Bid $10 000.00 $10,000.00 $10 006.89 $10,006.89 $21 829.00 $21,829.00 2 1 Removal of Concrete Sidewalk $3 300,00 $3,300.00 $5 647.OD $5,647.00 $29 000.00 $29 000.00 3 6 Furnish and Install 12" Eccentric PlugValve in strict accordance with plans ands specifications $8 000.00 $48,000.00 $17 458.51 $104,751.06 $15 333.00 $91,998.00 4 53Furnish and install 12" PVC Drain Line in strict accordance with plans andspecifications $142.00 $7 526.00 $266.18 $14,107.54 $558.00 $29.574.00 5 172Furnish and install 15" PVC Drain Line in strict accordance with plans ands specifications $263.00 $45,236.00 $151.93 $26,131,96 $1 329.00 $228,588.00 6 7 JEFA Furnish and install 4' Diameter Manhote in strict accordance with plans ands specifications $10 700.00 $74 900.00 $9 620.85 $67 345.95 $19 117.00 $133,819.00 7 8 Furnish and install 5' Diameter Manhole in strict accordance with lans ands ecifications $1320D.00 $79200.00 $11 003.83 $66022.98 $33 188.00 $199,128.00 8 6 Removal of Dis osal of Existin 12" Valve in strict accordance with lans ands ecifications $350.00 $2 100.00 $650.00 $3,900.00 $570.00 $3,420.00 9 1 Tie-in to Existing 12" Sanitary Sewer from the sludge basin, in strict accordance with plans and$6,138.00 s ecifcations10 $6,138.00 $1,950.00 $1,S50.D0 $8,800.00 $8,800.00 1 Plug / Fill Abandoned Pipes in strict accordance with plans andspecifications $4 000.00 $4,000.00 $5,250.00 $5,250.00 $18 191.00 $18.191.00 11 1 Day De -watering, temporary plugging of pipes, and bypassing of existing flows during tie-in to existing $13,000.00 $13,000.00 $23,529.00 $23,529.00 $1,068.00 $1,068.00 12 1 LS Install Concrete Pads and Concrete Curb in strict accordance with plans andspecifications. $3 300.00 $3,300.00 $3,000.00 $3,000.00 $21 742.00 $21 742.00 13 1 LS Site Restoration in strict accordance with plans and technical specifications $3,300.00 $3 300.00 $1 920.00 $1,920.00 $3 000.00 $3,000.00 TOTAL BID $300,000.00 $333,562.38 $790,157.00 Page 1 of 1