Loading...
HomeMy WebLinkAboutRES 24-308BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF BEAUMONT: THAT the City Manager be and he is hereby authorized to award a contract to Emergency Power Service of Kountze, Texas, for the Pennsylvania Avenue Underpass Emergency Generator Repair Project, in an amount not to exceed $59,400.00. The meeting at which this resolution was approved was in all things conducted in strict ` compliance with the Texas Open Meetings Act, Texas Government Code, Chapter 551. PASSED BY THE CITY COUNCIL of the City of Beaumont this the 19th day of November, 2024. �C Mayor Roy West - BEAUMONT TEXAS November 12, 2024 City of Beaumont Purchasing Department 801 Main Street, Suite 320 Beaumont, Texas 77701 Re: Pennsylvania Underpass Stormwater Pump Station Generator This letter is to inform you that the City of Beaumont Engineering Department was notified by the Facilities Maintenance department on November 5th about a radiator leak on the permanent 1- megawatt generator at the Pennsylvania Avenue Underpass pump station. The generator provides emergency power to the pump station in the event of a power failure, ensuring continued operation of the pumps. The station pumps out rainwater along MILK Parkway where it crosses Pennsylvania Ave and Park Street. Due to the critical importance of maintaining reliable electric service to the pump station, Public Works/Engineering has determined that rebuilding the radiator must be performed on an emergency basis. Due to the age of the generator, parts are not available, therefore the radiator must be rebuilt. On November 11, 2024, the City obtained a proposal not to exceed the amount of $59,400.00 from Emergency Power Service to perform the necessary repair work. Emergency Power Service will remove the radiator and refurbish it with new cores, gaskets, bolts, and replace all hoses on the engine. They will also replace the two excessively worn fan pillar block bearings. Once rebuilt, it will be reinstalled, topped off with new coolant, tested, and checked for leaks. If you have any further questions, please feel free to contact me at (409) 880-3725. Sincer , 7 Bart Bartkowiak Director of Public Works PUBLIC WORKS T 409.880,3725 F 409.880.3732 PO Box 38271 Beaumont, TX 77704 801 Main St.12nd Floor 1 Beaumont, TX 77701 beaumonttexas.gov Quote #_247P113 November 11, 2024 BUSINESS P.O. Box 8 Silsbee, Texas 77656 Fax: 409.385.5475 City of Beaumont Building Services 1838 Pine St. Beaumont Tx. 77701 Attn: Jimmy Bevilaqua 409-880-3792 5er .1 --4�9= 199 908 EGSA Efectrrmf cenearrny sy:lem, AssodoOon 3598 Highway 327 Kountze, Texas 77625 www.emergencypowerservice.net Pennsylvania Avenue Cummins 1Megawatt Radiator Repairs (Budgetary Pricing, radiator cost is not known until we get it taken apen art and identify the type of cores it has) Jimmy, per your request we are pleased to provide the following quotation. We propose to remove the leaking radiator from the unit and have it refurbished, with new cores, gaskets, bolts, and replace all the hoses on the engine. We will also replace the two fan pillar block bearings while we have it dismantled. They are excessively worn. Once the radiator is rebuilt, we will put it back in and top off with new 50/50 premix coolant We will also inspect the thermostats while the unit is down. When all is complete, we will test run the unit to check for leaks. 15k Telehandler Rental 2 days $2900.00 Telehandler Delivery and Pickup x 2 $1200.00 Labor 24 hours, 2 techs,1 helper $10,500.00 Rebuilt Radiator (estimated cost) $41,000.00 Supplies $500.00 Hoses $500.00 2 Fan Pillar Block Bearings $675.00 Mileage $337.50 Coolant 55 Gallons $1787.50 Total estimated cost for this repair $59,400.00 *Quote valid for 30 days. Accepted by Date Thank you for the opportunity to bid on your project Please call if you have any questions. John Baker 409-658-0765 ibl7Pwt.net 1IPage