Loading...
HomeMy WebLinkAboutRES 24-304RESOLUTION NO. 24-304 BE IT RESOLVED BY THE CITY COUNCIL A=01M�1-411116i196a2C D7NIX8130=6 WHEREAS, on November 7, 2024 the City solicited bids for the Grand Avenue and Magnolia Avenue Pipe Bursting Contract - Phase I; and, WHEREAS, one (1) bid was received for furnishing all labor, materials, and equipment for the project; and, WHEREAS, King Solution Services, LLC, of Houston, Texas, submitted a bid for an amount of $2,954,370.00 as shown in Exhibit "A," attached hereto; and, WHEREAS, a total of three hundred and sixty-five (365) calendar days are allocated for the completion of the project; and, WHEREAS, City Council is of the opinion that the bid submitted by King Solution Services, LLC, of Houston, Texas is the lowest bidder providing the best value to the City and should be accepted; NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF BEAUMONT: THAT the statements and findings set out in the preamble to this resolution are hereby, in all things, approved and adopted; and, THAT the bid submitted by King Solution Services, LLC, of Houston, Texas, submitted a bid for an amount of $2,954,370.00 as shown in Exhibit "A," be accepted by the City of Beaumont; and, THAT a total of three hundred and sixty-five (365) calendar days are allocated for the completion of the project; and, BE IT FURTHER RESOLVED THAT the City Manager be and he is hereby authorized to execute a contract with King Solution Services, LLC, of Houston, Texas for the purposes described herein. The meeting at which this resolution was approved was in all things conducted in strict compliance with the Texas Open Meetings Act, Texas Government Code, Chapter 551. PASSED BY THE CITY COUNCIL of the City of Beaumont this the 19th day of November, 2024. li 4 %ea_ �C - tMayor Roy West - BID TABULATION Grand Ave & Magnolia Ave Pipe Bursting Contract - Phase 1 - Bid No. WU1025-07 BID OPENING DATE: November 7, 2024 The Bid Proposals s fitted have been reviewed and to the best of my knovnedge this Is an aceure tabulation of the bids received. �\\v1 By. Amafia Ullarreal, P.E.. C.F.M., Assistant Public Works Director Date: 11/8/2024 OF TfX4, 1�1 / AMAIIAVILLARREAL, P.E. j ITEM NO. QUANTITY UNIT DESCRIPTION Bid Schedule (Engineer's Estimate) King Solution Services; LLC Mario Jaimes Houston, TX 77039 BASE BID ITEMS UNIT PRICE TOTAL UNIT PRICE TOTAL 1 1 LS Mobilization Including Payment Bond, Performance Bond, Insurance, and Moving Equipment to Project Site (Not to Exceed 31 of Total Base Unit Prices) S75 000.00 S 75 000.00 S 85 000.00 S 85 000.00 2 50 SY Full Depth Repair of Side Walk 5" $ 79.00 S • 3 950.00 S' 50.00 S 2.500.00 3 50 SY Full Depth Repal of Driveway 6" $ 107.00 $ 5,350.00 S 120.00 S 6.000.00 4 200 SY Full Depth Repair of Concrete Pavement 10" S 161.001 S 32 200.00 S 160.00 S 32 000.00 5 615 SY Flexible Pavement Structure Repair 4" $ 88.00 S 54120.00 $ 58.00 S 35 670.00 6 2 500 LF Trench Excavation Protection S 3.00 S 7,500.00 S 2.00 $ 5,000.00 7 1 LS Barricades Signs, and Traffic HandlingS 25 000:00 $ 25 000.00 S 35 000.00 S 35 000.00 8 250 LF Chain Link and Wooden Fences and Gates With Pro ect Managers Approval $ 35.00 S 8,750.00 S 2.00 S 500.00 9 24.400 LF Preconstruction Cleaning and Televising of Existing Sanitary Sewer Line All Depths S 4.001 S 97 600.00 $ 2.00 S 48 800.00 io 24.400 LF Post Construction Cleaning and Televising of Completed Sanitary Sewer All Depths S 250 S 61 000.00 S 2.00 S 48 800.00 11 60 EA Obstruction Removal Excavation All Sizes All Depths, With Pro'ect Managers Approval S 776.00 $ 46 500.00 S 500.00 S 30 000.00 12 227 EA Reconnect New Short Side Seance Connection to Sewer Main, 0' to 20', Including Installation of Cleanout at Right -Of -Way Line, Complete, All Sizes and De th $ 810.00 $'. 183 870.00 S 700.00 S 158 900.00 13 63 EA Reconnect New Long Short Side Service Connection to Sewer Main, 20' to 40', Including Installation of Cleanout at Rlght-Of-Way Line, Complete, All Sizes and Depth S 1 155.00 S 72 765.00 S i.i5o.001 S 72 450.00 14 150 LF Extra Footage for Service Connection Over 40' All Sizes and Depth S 28.00 S 4,200.00 $ 10.00 S. 1.500.00 15 19 EA Furnish and Install End -of -Line Cleanout by Excavation $ 1 450.OD S 27 550.00 S 1.050.001 S 19 950.00 16 4 EA Plua and Abandon 4" to 12" Sanitary Sewer Line at the Manhole as Requested by the Pro ect Manager, A0 Depths S 450.00 $ 1,800.00 S 850.00 S 3,400.00 17 30 EA Remove and Replace or Install New Std. Fiberglass Manhole Less than 5' De th With all Joints and Connections S 6.500.00 S 195 000.00 S 6 500.00 S 195 000.00 18 5 EA Remove and Replace or Install New Std. Fiber lass Manhole 5' to 8' Depth(With all Joints and Connections S 7 200.OD s 36 000.00 S 6.800.00 S 34 000.00 19 50 VF Extra Depth for New or Replacement Sid. Fiber lass Manhole Over 8' Depth $ 330.00 $ 16 500.00 S Sub S 2,500,00 20 1 17 1 EA I Remove and Replace or Install New Std. Pre -Cast Concrete Manhole Less than 5' Depth(With all Joints and Connections S 6.500.00 $ 110 500.00 S 7.000.00 S 119 000.00 Page 1 of BID TABULATION Grand Ave & Magnolia Ave Pipe Bursting Contract - Phase I - Bid No. WU1025.07 BID OPENING DATE: November 7, 2024 The Bid Proposals submitted have been reviewed and to a best of my knowledge this is an acc to tabulation of the bids received. A-- &-n By. Arrialia Villarreal. P.E., C.F.M., Assistant Public Works Director Date: 11/82024 l PZ E O ..... 4 AMALIA VILLARREAL, P.E.j .q 90340 �� 1� 0 �•. ! ENS � r �,� IGng Solution Services, LLC ITEM UNIT DESCRIPTION Bid Schedule (Engineer's. Estimate) NO. QUANTITY Mario Jaiines Houston, TX 77039 BASE BID ITEMS UNIT PRICE TOTAL UNIT PRICE TOTAL 21r33OO EA Remove and Replace or Install New Sid. Pre -Cast Concrete Manhole 5' to 8' Depth With an Joints and Connections S 7,500.00 S 337 500.00 S 7,200.00 S 324 000.00 22VF Extra De th for New or Re lacement Std. Pre=Cast Manhole Over 8' De th $ 385.00 S 38 500.00 S 75.00 $ 7,500.00 23E4 Abandon Manhole $ 1.500.00 S 7.500.00 S 1.100.00 S 5.500.00 5' Sanitary Sewer Rehabilitation by Pipe Bursting Method (All Depths), Replacing 4' Sewer with 6" (IPS) High Density Polyethylene Pipe 24LF SDR-17. S 39.50 S 9,875.00 S 48.00 $ 12 000.00 8" Sanitary Sewer Rehabilitation by Pipe Bursting Method (AI] Depths), Replacing 6" and 8" Sewer with 8" (IPS) High Density Polyethylene 25 LF Pie SDR-17. S 42.50 S 629,000.00 S 48.00 S 7.10 400.00 12" Sanitary Sewer Rehabilitation by Pipe Bursting Method (All Depths), Replacing 12" Sewer with 12" (IPS) High Density Polyethylene Pipe 26LF SDR-17. S 70.25 $ 231 825.00 S 52.00 S 171 600.00 18" Sanitary.Sewer Rehabilitation by Pipe Bursting Method (All Depths), Replacing 15" Sewer with 18" (IPS) High Density Polyethylene Pipe 27 2.200 LF SDR-17. S 142.00 S 312400.00 S 92.00 S202.400.00 22' Sanitary Sewer Rehabilitation by Pipe Bursting Method (All Depths), Replacing 18" Sewer.with 22" (IPS) High Density Polyethylene Pipe 28 3,850 LF SDR-17. S 175.00 S 673 750.00 S 120.00 S 462 000.00 Remove and replace existing Sanitary Sewer via Open cut within 5' of roadway, Additional to Pipe Bursting Cost, Under 10' Depth, Including 29 1.250 LF Stabilized Sand Backfill Complete in Place As Approved bV Engineer S 50.00 $ 62 500.00 S 30.00 S 37 500.00 Remove and replace existing Sanitary Sewer via Open cut within V of roadway, Additional to Pipe Bursting Cost, Over I T Depth, Including 30 1,250 LF Stabilzed Sand Backlili Complete in Place As Approved by Engineer. $ 75.00 S 93 750.00 S 30.00 S 37 500.00 Remove and replace existing Sanitary Sewer via Open cut 5' or greater outside of roadway, Additional to Pipe Bursting Cost, Under 10' 31 750 LF De th Com lete In Place, S 30.00 S 22 500.00 S 32.00 S 24 000.00 Remove and replace existing Sanitary Sewer via Open cut 5' or greater outside of roadway, Additional to Pipe Bursting Cost, Over 10, 32 750 LF Depth, Complete in Place $ 42.00 S 31 500.00 S 32.00 S 24 000.00 BASE BID QUANTITIES TOTAL S 3,515,755.00 S 2,954,370.00 Paget of 2