HomeMy WebLinkAboutRES 24-290RESOLUTION NO, 24-290
BE IT RESOLVED BY THE CITY CQUNCIL
OF THE CITY OF BEAUMONT:
WHEREAS, on May 21, 2024, by Resolution 24-130, City Council awarded a contract to
SETEX Construction Corp., of Beaumont, Texas, in the amount of $683,166.00, for the Forsythe
Drainage Improvements Project; and,
WHEREAS, previous Change Order No. 1, resulted in no changed to the contract
amount; and,
WHEREAS, the project has been inspected by the Engineering Division and found to be
complete in accordance with the provisions and terms set forth in the contract;
NOW, THEREFORE, BE IT RESOLVED BY THE
CITY COUNCIL OF THE CITY OF BEAUMONT:
THAT the statements and findings set out in the preamble to this resolution are hereby, in
all things, approved and adopted; and,
THAT the City Manager be and he is hereby authorized to accept maintenance and make
final payment to SETEX Construction Corp., of Beaumont, Texas, in the amount of $34,846.32
for the Forsythe Drainage Improvements Project; and,
BE IT FURTHER RESOLVED THAT the Forsythe Drainage Improvements Project be
and the same is hereby accepted; and,
The meeting at which this resolution was approved was in all things conducted in strict
compliance with the Texas Open Meetings Act, Texas Government Code, Chapter 551.
PASSED BY THE CITY COUNCIL of the City of Beaumont this the 5th clay of
November, 2024.
Projectmates
CITYOFSEAUMONT.PROJECT MAT ES.00M
Change Order #002.001
PW0224-04 - Forsythe Street infrastructure Repair Project, 801 main street, Beaumont, Texas 77701 USA
Monday, Oct 28, 2024
Change Order Details
Description
Division
Scope of Work
Awarded to
Created By
Create Date
Reason Code
Days Changed
Attachments
Additional Info
Line Item Type
Group
Dates
Grand Total:
CO#002.001: Change Order 1
01 - General Requirements
This proposed Change Order 1 will increase the contract amount by 7 calendar
days due to inclement weather days encountered throughout the project. The
contract completion date will be extended to August 9th.
Bonnie Rose Revia (SETEX Construction Corp), 8944
David Tingle (City of Beaumont)
Aug 02, 2024 08:27 AM CST
Time Extension
7
Rain Out Worksheet (1).docx
Unit price
3.0 Construction
Created On Aug 02, 2024
Org. Sub. Completion Aug 02, 2024
Capital Planning
Capital Planning Design - Forsythe Street Infrastructure Repair Project
Capital Project Fiscal Year 2024
Accounting
Item id 583
Summary
Original Contract Sum
683,166.00
Net Cost by Previous Approved Change Order
0.00
Contract Sum Before This Change Order
683,166,00
Contract Sun Changed By This Change Order
0.00
New Contract Sum
683,166.00
Substantial Completion Date
Aug 02, 2024
Net Time Change By Previous Change Order
0 day(s)
Substantial Completion Before This Change Order
Aug 02, 2024
Time Changed By This Change Order
7 day(s)
New Substantial Completion Date
Aug 09, 2024
All Change Orders of the Original Contract
0%
Approval (Approved)
User I Role
Status
Bonnie Rose Revia (External -GC)
Approved
Aug 02, 2024 11:48 AM CST
David Tingle (Project Manager)
Approved
Aug 02, 202412:08 PM CST
Amaiia "Molly" Villarreal (City Engineer)
Approved
Aug 05, 202410:49 AM CST
Bart Bartkowiak (Director)
Approved
Aug 07, 2024 03:27 PM CST
Crystal Valencia (Admin)
Approved
Aug 09, 2024 10:10 AM CST
June Ellis (Assistant City Manager)
Approved
Aug 10, 2024 01:39 PM CST
Tina Broussard (City Clerk)
Approved
Aug 12, 2024 08:45 AM CST
Comments
(
Projectmates CITYOFBEAUM0NT.PROJFCTMATFS.COM
Invoice #002.004 - Final for Invoices/Pay Apps
PW0224-04 - Forsythe Street Infrastructure Repair Project, 801 mail street, Beaumont, Texas 77701 USA
Monday, Oct 28, 2024
Invoice Details Amount Otte: 34,846.32
Contract
Contract - 002 Forsythe Drainage Project Construction
Invoice #
002.004 - Final
Description
SETEX Construction Corp - Forsythe Drainage Project Construction
Invoice Date
Oct 25, 2024
Pay Period
Aug 10, 2024 to Oct 25, 2024
Final Invoice
Yes
Grand Total
$$724.23
Payment To
Bonnie Rose Revia 81944 (SETEX Construction Corp)
Created By
David Tingle (City of Beaumont)
Create Date
Oct 25, 2024 02:13 PM CST
Invoice ID
1308
Retainage
Work Completed % 5.00
Materials Stored % 5,00
Line Items
Item Account
WBS/ Description
Contract Previous Quantity UoM
Unit Work Materials Total
�# code
Section
Total Payments
Price Completed Stored Amount
(WC) (MS)
Contract Items
104- 1
001 RFMOViNG
1,922.w 24,986.00 0.00 SY
13.00 0.00 0.00 24,986,00
6001
CONC
@ 13.00 =
(PAVEMENT)
24.986.00
Grand Total 683,166.00
Item
Account
WBS/
Description
Contract
Previous
Quantity
UOM Unit
Work
Materials
Total
#
Code
Section
Total
Payments
Price
Completed
Stored
Amount
(WC)
(MS)
104-
2
001
REMOVING
31.00 @
2,635.00
0.00
85.00
0.00
0.00
2,635.00
6017
CONC
95.00 =
(DRIVEWAYS)
2,635.00
104-
3
001
REMOVING
592.00 @
7,104.00
0,00
12.00
0,00
0.00
7,104.00
6422
GONG (CURB
12.00 =
AND GUTTER)
7,104,00
110-
4
001
EXCAVATION
240.00 @
4,320.00
0.00
18.00
0.00
0.00
4.320.00
6001
(ROADWAY)
18.00 =
4,320.00
162-
5
001
BLOCK
60.00 @
660.00
0.00
11.00
0.00
0.00
660.00
6002
SODDING
11.00 =
660.00
247-
6
001
FL BS (CMP IN
1,933,00
85,052.00
0.00
44,00
0.00
0.00
85,052.00
6233
PLACE)(TY A
@ 44.00 =
GRI-2)(12")
85,052.00
260-
7
001
LIME TRT
1,933.00
61,856.00
0A0
32.00
0.00
0.00
61,856,00
6027
(EXIST MATL)
@ 32.00
(81
61,856,00
3076-
29
001
D-GRHMATY-
1,933.00
56.057.00
(LOD
29.00
0.00
0.00
56,057.00
6037
D SAC-8 (2-1
@ 29.00 =
56,057.00
310-
8
001
PRIMECOAT
387.00@
4,257.00
0.00
11.00
0.00
0.00
4,257.00
6001
11.00 =
4,257.00
354-
9
001
PLANE ASPH
1,922.00
9,610,00
0.00
5.00
0.00
0.00
9,610.00
6021
CONIC PAV (W)
@ 5.00
9,b10.00
400-
10
001
STRUCT
705.00 @
15,510.00
0.00
22.00
0.00
0.00
15,510.00
6003
EXCAV (PIPE)
22,00 =
i
15,510.00
400-
11
001
CEMENT STAB
485.00 @
55,775.00
0.00
115.00
0.00
0.00
55,775.00
6005
BACKFILL
115.00 =
(PIPE)
55.775.00
400-
12
001
CEMENTSTAB
40,0003
6,160.00
0.00
154.03
0.00
0.00
6,160.00
6009
BACKFILL
154.00 =
(INLET OR MH)
6,160.00
402-
13
001
TRENCH
452,00 @
6,328.00
0.00
14,00
0.00
0.00
6,328.00
6001
EXCAVATION
14.00 =
PROTECTION
6,328.00
Grand Total
683,166.00
Item
Account
WBSI
Description
Contract
Previous
Quantity
UoM Unit
Work
Materials
Total
#
Code
Section
Total
Payments
Price
Completed
Stored
Amount
(WC)
(MS)
403-
14
001
TEMPORARY
700.00 @
9,100.00
0.00
13.00
0.00
0.00
9,100.00
6031
SPL SHORING
13.00 =
9,100.00
4122-
30
001
ADSHP
255.00@
24.225.00
0.00
95,00
0.00
0.00
24,225.00
6001
STORM PIPE
95,00 =
(18°)
24,225.00
4122-
31
001
ADS HP
21.000
3,465.00
0.00
165.00
0,00
0.00
3,465.00
6002
STORM PIPE
165.00 =
(24")
3,465.00
4122-
32
001
ADS HP
388.00 @
68,288.00
0.00
176,00
0.00
0.00
68,288.00
6003
STORM PIPE
176.00 =
061
68,288.00
465-
15
001
MANIA
1.00 @
13,769.00
0.00
13,769.00
0.00
0.00
13,769.00
6002
(COMPL)
13,769.00
(PRM)(481N)
-
13,769.00
465-
16
001
MANS{
1.00 @
28,887.00
0,00
28,887.00
0.00
0.00
28,887.00
6004
(COMPL)
28,887.00
(PRM)(721N)
_
28,887.00
465-
17
001
INLET
3.00 @
19,215.00
0.00
6,405.00
0.00
0.00
19,215.00
6013
(COMPL)(PCO)
6,405.00 =
(3FT)
19,215.00
465-
18
001
INLET
3.00 @
27,807,00
0.00
9,269.00
0.00
0.00
27,807.00
6029
(COMPL)(PCU)
9,269.00 =
(3FT)
27.807.00
496-
19
001
REMOV STR
6.00 @
5,172.00
0.00
862,00
0.00
0.00
5,174.00
6002
(INLET)
86200=
5,172.00
496-
20
001
REMOVE STR
am @
16,281.00
0.00
5,427.00
0.00
0,00
16,281.00
6003
(MANHOLE)
5,427.00 =
16,281.00
496-
21
001
REMOVE STR
277,00 @
7,756.00
0.00
28.00
0.00
0.00
7,756.00
6037
(PIPE)
28.00 =
7,756.00
500-
22
001
MOBILIZATION
1.00 0a
23,416,77
0.00
24,141.00
724.23
0.00
24,141.00
6001
24,141.00
i
24,141.00
Grand Total
683,166.00
Item
Account
WBS/
Description
Contract
Previous
Quantity UoM
Unit
Work
Materials
Total
#
Code
Section
Total
Payments
Price
Completed
Stored
Amount
(WC)
(MS)
502-
23
001
BARRICADES,
2.00 @
11,004.00
0.00
5,500.00
0.00
0.00
11,000.00
6001
SIGNS AND
5,500.00 =
TRAFFIC
11,000.00
HANDLING
506-
24
001
BIODEG
72.00 @
1.584.00
0.00
22.00
0.00
0.00
1,584.00
6041
FROSN CONT
22,00 =
LOGS (INS7L)
1,584.00
(12.)
529-
25
001
CONCRETE
592,00 @
18,352.00
0,00
31,00
0,00
Un
18,352.0D
6008
CURB &
31.00 =
GUTTER (TYPE
I E}
18,352,00
530-
26
001
DRIVEWAYS
29.0001
7,714.00
0.00
266.00
0.00
0.00
7,714.00
6004
(CONC)
266.00 =
7,714.00
666-
28
001
RFFL PAV MRK
86.00 @
1,892.OD
0.00
22.00
0.00
0.00
1,892.00
6048
TY I (W)24"
22.00 =
(SLD)(100MIL)
1.892.00
666•
27
001
REFt. PAV MRK
419.00 @
4,609.00
0.00
11.00
0.00
0.00
4,609.00
6124
TY I (Y)4'(BRK)
11.00 =
(100MIL)
4,609.00
9000-
33
001
TV EXISTING
1.00 @
6.820.00
0.00
6,820.00
0.00
0.00
6,820.00
6001
12" STORM
6,820.00 =
SEWER
6,820.00
9000•
34
001
INSTALL
10.00 @
4,950,00
0.00
495.00
0.00
0.00
4,950,00
6002
FLOWABLE
495.00=
FILL IN
4,950.00
ABANDONED
12" STORM
SEWER
9000-
35
001
CONNECT
1.00Cap
2,750.00
0.00
2,750.00
0.00
0.00
2,750,00
6003
EXISTING 12,
2,750,00 =
STORM SEWER
2,750.00
TO JB-2
9001-
36
001
CONNECT
1,00 r�7i
6,875,00
0,00
6,875.00
0.00
0.00
6,875.00
61101
PROPOSED 18"
6,875.00 =
PIPE (46) TO
6,875.00
EXISTING
i
MANHOLE
goal-
37
001
INSTALL NEW
1,00 @
13,75D.00
0.00
13,750.00
0.00
0.00
13,750.00
60D2
MANHOLE
13,750.00
Grand Total
683,166.00
Item Account WBS/ Description Contract Previous Quantity UoM Unit Work Materials Total
4 Code Section Total Payments Price Completed Stored Amount
(WC) (MS)
9002- 38
6001
WITH NEW
ANDEXISTING
13,750,00
PIPE
CONNECTIONS
001 T PVC DRAIN
4.00 @ 924.00 0.00
PIPE IN CURB
231.00 =
924.00
9003- 39 001 DUMPSTER 1,00 C1 13,530.00 0.00
6001 AREA 13,530.00
ADDITIONAL
CONCRETE 13,530,00
SUPPORT
Total 724.23 692,441.77
Summary
1. Contract Sun: + Amendments
2, New Change by Change Request
3. Contract Sum To Date (Line 1 + Line 2)
4. Total Completed & Stored To Date
5. Retainage
5a. 5.00% of Completed Work (Column I on Continuation Sheet) 0.00
5b. 5.00% of Stored Material (Column J on Continuation Sheet) 0.00
Total Retainage (5a + 5b)
6. Total Earned Less Total Retainage
7. Less Previous Certificates for Payment
8. CurrentAmount Due
9. Balance to Finish, Including Retainage (Line 3 less Line 6)
Additional Info
Line Item Type Unit price
Group 3.0 Construction
231.00 0.00 0.00
924.00
13.530.00 0.00 0.00
13,530.00
724.23 0.00
683,166,00
Grand Total
693,166.00
683,166.00
0.00
683,166. G0
683,166.00
0.00
683,166.00
648,319.68
34,846.32
a,00
Accounting and Status
Capital Funding Source
Capital Project Fiscal Year
Approval (Pending)
User / Role
Bonnle Rose Revia (External -GC)
David Tingle (Project Manager)
Design - Forsythe Street Infrastructure Repair Project
2024
Anialia "Molly" Villarreal (City Engineer)
Director
Adman
Status
Approved
Oct 28, 2024 01:21 PM CST
Approved
Oct 28, 2024 01:21 PM CST
Approved
Oct 28, 2024 02:31 PM CST
Pending
pmnotifications(uZsyslemates.com
214.217.4100
b-Up.s;/1.;;.€ pxLpTDjectmatas.com
2024 Projectmates l Systemates, Inc.
2435 N Central Expy
Richardson, TX 75080