Rich andRaustofFaustE 'neeringandSurvey\ng,|nc,1sreques1ingaw/aivertothes|devva|k
requirement for a new commercial development to be located at 6510 Calder Avenue. If the
waiver lsapproved, nosidewalk will be installed along Calder Avenue.
Section26.03.0048lof theCity'sordinoncesstates, 'The planning and zoning commission mGy
grant owaiver to the sidewalk requirement if the applicant can prove there is an engineering
reason for notinstalling osb/evwo8k."ThefoUovvngeng)neeringreasonsvvereprovdedina
letter submitted by the applicant:
1. The placement of a sidewalk will require the ditch to be partially backfilled, reducing the
capacity of the ditch.
2. Construction will endanger the underground utility and communications lines within the
construction area.
3. Placing an underground storm sewer would not be practical due to the lack of depth
available inthe ditch and the downstream elevations.
The City"s Traffic Engineer has reviewed the request for said sidewalk waiver and concurs with
Planning staff recommends approval of the request.
Exhibits are attached.
BEAVMC3Ni
Planning & Community Development
Case Type:Pianning and Zoning
Case Sub Type: Sidewalk Waiver
Case #: PZ2024-281
Location: 6510 CALDER AVE, BEAUMONT, 77706
Individuals listed on the record:
Applicant
Aaron Ward
5550 Easton Suite 0
Beauniont, TX 77708
Reason for Submittal
Notes:
see attached letter
Case Status: REVIEW
Tag Name: Sidewalk Waiver
Initiated On: 9/17/2024 12:25,21 PM
Home Phone:
Work Phone: 4098133410
Cell Phone:
E-Mail: aaron@fausteng.coni
Case Type- Hawing and Zoning Page 1 of I
Case #. PZ2024-281 Printed On- 9130/2024
FAUST Engineering and Surveying,� Inc.�
Professional Engineers and Professional Surveyors
E-MAIL Auonea/wno@pAusTEms.coM
sssoc=te,Freeway, Suite o
ma"rriont,Texas rno
Surveying Firm Registration No. mooz4-on
Engineering Firm Registration No. 0000
City ofBeaumont
Planning and Zoning Commission
Post Office Box 3827
Beaumont, Texas 777O4
Commissioners:
Re Kirbv'sA,cade
6510 Calder Avenue, Beaumont, Texas
Telephone (409) 813-3410
Faust Engineering and Surveying, |nc,isnequesingavvaiverfortherequirernen1ofLhe
construction of sidewalk along the Calder Avenue right-of-wayon a new commercial
development aLG51OCalder Avenue. Avicinity map, topographic survey, and proposed
construction site plan are attached to this request.
Calder Avenue isapublic with aZ4foot asphalt riding surface within a5O
foot right-of-way. Adjacent tothe west side ofthe roadway (adjacent tothis tract) isan
earthen ditch. The east side ofthe roadway has open ditches, and aportion ofthe ditch
is enclosed. This site has one (1) driveway entrance approximately in the middle of the
site. The existing entrance will be removed and new entrances will be placed.
Areview of the topographic survey indicates that the ditch adjacent tothe site overlaps
the property line asmuch asthree i3lfeet. The area within the ditch and adjacent tothe
ditch have numerous cable lines, agas line, and asanitary sewer line. The ditch isshallow
uv(th a depth of 1.6 feet} however, the vvldth of the ditch is 9.1 feet (approximatevalues,
the widths and depths vary).
The construction of a sidewalk in this area would not be feasible due to the following
circumstances.
l. The placement of a sidewalk will require the ditch to be partially bacNlUed,
reducing the capacity ofthe ditch.
2. Construction will endanger the underground utility and communications lines
within the construction area.
3. Placing an underground storm sewer would not be practical due to the lack of
depth available inthe ditch and the downstream elevations.
23444 Sidewalk Waiver Request
Kirby's Arcade — Sidewalk Waiver Request
Thank you for your consideration of this request.
If|mmaybeoffurther assistance inthis matter, Irnaybereached at4O9'813-S4lO.
For The Firm,
Richard F.Faust, p.E. MD F. FAM
Faust Engineering ondSurveying, Inc.
Not
go 1 to 0 'k I
a
:N * 6 il
1
N :II
II 1 k
i 4 0 0 1, P 4 ONP. 6, %1,
rn k: ON
kI I I I ■ t
Ik I
I
4 k Ip
�t N.,
iTy
t I k I
M,
P)
p Zrl
CA CO
c -u
Jk'N k ■0
—u 0
C) 0 r 7D 0
0 0 C) m 07�
>0
m
m x
0 rq >
r
% > f
m (n
Cb
Ib "-fxj I
63I
A
I
4
M
tj
m (r
V.
m
el
C3
>
m
vid
coo -10 -0
Zz Q)
01
1-lz
Fri
6 y F! b b 1 1 1 1 � I J V �' � "-"J L—,o
Zj
>
0
r�,' G) M, c) .0
Jh.2
iq
YUa :70
M,
Lr) M :70 rn 0 0
v)
>
rlrn,
N
m
r-
m
0
M
Z
fj >
r-
m
0
�\1Ca