HomeMy WebLinkAboutRES 24-219RESOLUTION NO.24-219 BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF BEAUMONT: WHEREAS, on April 12, 2022, by Resolution 22-108, City Council awarded a contract to ALLCO, LLC, of Beaumont, Texas, in the amount of $25,088,259,00, for the Collier's Ferry Pump Station Project; and, WHEREAS, Change Order Nos.1-9, in the amount of $1,527,061.71, increased the contract amount to $26,615,320.71; and, WHEREAS, proposed Change Order No. 10, in the amount of $43,360.75, is required for the relocation of approximately 260 feet of an 8-inch raw water line that delivers irrigation water from Lawson's Pump Station to the Beaumont Country Club. If approved, the new contract amount will be $26,658,681,46; and, WHEREAS, an additional fourteen (14) calendar days are needed to complete the work; NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF BEAUMONT: THAT the statements and findings set out in the preamble to this resolution are hereby, in all things, approved and adopted; and, THAT the City Manager be and he is hereby authorized to execute Change Order No.10, in the amount of $43,360.75, for additional work described above, thereby increasing the total contract amount to $26,658,681.46, for the Collier's Ferry Pump Station Project; and, THAT an additional fourteen (14) calendar days are added to complete the work. The meeting at which this resolution was approved was in all things conducted in strict compliance with the Texas Open Meetings Act, Texas Government Code, Chapter 551. PASSED BY THE CITY COUNCIL of the City of Beaumont this the 3rd day of September, 2024. 11200 Broadway St., Suite 2320 + Pearland, Texas 77584 + 832-45s-4700 + FAX 817-735-7491 www,freese.com August 23, 2024 Amalla "Molly" Villarreal, PZ, CFM City Engineer City of Beaumont 1350 Langham Road Beaumont, TX 77707 Re: Project WU0222-14 Collier's Ferry Pump Station: Change Order No. 010 Dear Mrs, Villarreal, Included with this letter ]s Change Order No. 010 for the Collier's Ferry Pump Station project. This letter is to serve as a narrative for the item(s) included In this Change Order with supporting documentation attached. Item No. 1: Relocation of 8" Irrigation Line An 8" Water Line was discovered during the excavation and Installation of the 48" Raw Water Line. This 8" line Is an irrigation line that runs from the Lawson Raw Water Pump Station and fills a holding pond for the Beaumont Country Club, The 8" irrigation line needs to be relocated and moved out of the way so the Country Club still has its water supply and the 48" Raw Water Line for the Collier's Ferry Pump Station can be installed. -rotal Cost: $43,360.75 Additional Days: 14 I hope the above narrative, along with the included supporting documentation, provides adequate Information to be able to process this Change Order in a timely fashion. Please don't hesitate to reach out to me if you need any further explanation or backup documentation. Sincerely, Ram] Abusheikh, P.C. Construction Manager cc: Brent Schmitt, John PippMs, Sheldon Buck, Lindsey Reid, Matt Cartwright, Michael Kennedy BMT22198 T:\4.0 CONSTRUCTI011\4.40 Contract Mod�4,43 Chg Orders\CO-010— Relocation of 8" Irrigation Line s , � T EXAS Project Coliler's Ferry Pum Station Project Number Owner City of Beaumont WU0222-14 Contractor Allco, LLC TX 881 Construction Manager Rami Abusheikh P.E. (Freese & Nichols, Inc,) BMT221.98 Design Professional Sheldon Buck P.E. (Freese & Nichols, Inc.) BMT22198 Change order No. 01.0 Date 8/23/2024 Item Description Additional Days Change Amount 1 Relocate 8" Irrigatlon Line 14 z $ 43,360,75 $ 3 � - 4 - 5 $ - Net Change in Contract Price this Change Order $ 43,360.75 Net Change in Contract Time this Change Order 14 Days The compensation In this Change Order is the full, complete, and final compensation for all costs Contractor may Incur .because of or relating to this change whether said costs are known, unknown, foreseen, or unforeseen at this time, including without limitation, any cost for delay, extended overhead, ripple or impact cost, or any other effect on changed or unchanged Work because of this Change Order. The changes in Contract Times are the complete and final adjustments for impacts to the ability of Contractor to complete the Work within the Contract Times and are the only adjustments to which Contractor is entitled. All terms and provisions of the Contract documents remain in effect except as specifically modified by this Change Order, Original Contract Amount: $ 25,088,259.00 Net from Previous Change orders: $ 1,527,061.71 Total Amount of This Change Order: $ 43,360.75 Percent Change in Contract Amount of this Change Order: 0.17% Total Percent Change in Contract Amount to Date: 6.26% New Contract Amount: $ 26,658,681.46 Original Contract Duration: 900 Calendar Days Additional Contract Days per Previous Change orders: 115 Calendar Days Additional Contract Days per This Change Order: 1.4 Calendar Days Revised Contract Duration: 1,029 Calendar Days Date of Notice to Proceed 6/27/2022 Original Substantial Completion Date 10/14/2024 Original Final Completion Date; 12/13/2024 Revised Substantial Completion Date: 2/20/2025 Revised Final Completion Date: 4/21/Z025 wiuri};t: viuul 1,4U. V.LJ Recommended by Construction Manager; 08/23/2024 Ra ri Abuslre#J4h, P.E. Date Construction Manager Freese and Nichols, Inc. Accepted by ntractor: VO/zG f Brandon Narrlaon pate Vice -President Ailco, zi.0 Reviewed by Design Professional, Sheldon duck, RE. Project Manager Freese and Nichols, Inc. Reviewed by; Bre Schrsyltt, P.F', Water Utilities Design Manager city of Beaumont Reviewed by. /Re av, d by; Araolla Villarreal, J.,, FM Date B rt Bart ow ak City Engineer Director of Public Works City of Beaumont City of Beaumont Approved By: Attested By. Kenneth R. Williams City Manager City of Beaumont Ddte Tina Broussard, TRMC City Clerk City of Beaumont 8/24/2024 pate 8/26/24 pate Date Email: allco@allco'com August 23, 2024 Freese & Nichols 10497 Town & Country Way, Suite 500 Houston, TX 77024 Attn: Rami Abushelkh Re: City of Beaumont Colller's Ferry Pump Station Change proposal--8" Raw Water Relocation Dear Mr. Abushellch: Allco proposes the following change order to relocate the 8" Raw Waterline per the attached drawing: DESCRIPTION/COST SUMMARY Pricing Includes cost to relocate the 8" RW Line with 260 LF of C900 PVC Time Extension--14 Calendar Days ITEM LABOR MATERIALS EQUIPMENT SUB MARKUP/O-H TOTAL Relocate 8" RW $17,328.00 $12,583.00 $7,794.00 $0.00 $5,655.75 $43,360.75 Line Please contact the undersigned If you have questions or issues regarding this hatter. Respectfully, i co, LL Brandon Harrison 2 :' V} 4R 64 M En fA Vj Ali Vl Vi V} Vl V! Vl to Vi N 'A N o o S `"i 0 q ..: -. 2 _,.. ' $ a . yr yr fA w w w w vi w w w w `n y y w w� w 3 3 A i7 s. c w L c.l 3 Y p a. W C.1 o b b C3 aUy-� [R N Q � b � SVC O O q L e � o w in w 0 Q +q � u a � F µ ✓a o\'\' G e � 0 � d L U4 W LO 1.4 ' N L U � 'd N p Il ? 't•Yrlr 311do21d t3Nrd t+Tal lf'.I derN stntr'fN 1,tl, r; rt Ndld 3dld AE)UVH7Sln tenon Rld •>�sf m I nvnr NORMS dLN nd AUH34 S.M31'110D tifn�u tlrxuv 5 ^+n n•t ___.........,...,_ uHtlt'f ul uwx(nSw,7tn,d[.v.L— Vrl,lk� t mot liAl] yf.> H s991 N011b15 dW(ld ham3 Sra3111w �«envo�va_ 1.lA4'![IY3A lO,f113 !tletu.o H � d "s DOM raw ddria >•1-F�hP 4�NN N1+'1�qq �9 AMU nnnann Hann IMH aawaw fir S� �4k f �� alr��61� NEW NWR 4 •, t 1 L 5 jf II iri 5 44 31 t, gNgNgNgN \\ 1 't a HUB- 00 a yE Y. 8 S!rr�'lJ t>`et 11V 95.OS t!.l'/IIIS'Irrr11�e1 Iri Ndr'1 Oil Niw..lyti5•,gy N :>At>i:l M TEXAS Project Collier's Ferry Pump Station Project Number Owner City of Beaumont WU0222-14 Contractor Allco, LtC TX 881. construction Manager Ram! Abushelkh P.E, (Freese & Nichols, Inca BMT22198 Design Professional Sheldon Buck P.E. (Freese & Nichols, Inc.) BMT22198 Change Order No. 009 Date 8/1.6/2024 Item Description Additional Days Change Amount 1 Transformer Pad Fntergy Directed Piles 0 $ 9,999.00 2 $ ` 3 - 4 5 $ ` Net Change in Contract Price this Change Order $ 9,999.00 Net Change in Contract Time this Change Order 0 days The compensation in this Change Order is the full, complete, and final compensation for all costs Contractor may Incur because of or relating to this change whether sald costs are known, unknown, foreseen, or unforeseen at this time, Including without limitation, any cost far delay, extended overhead, ripple or Impact cost, or any other effect on changed or unchanged Work because of this, Change Order. The changes in Contract Times are the complete and final adjustments for impacts to the ability of contractor to complete the Work within the Contract Times and are the only adjustments to which Contractor is entitled. All terms and provisions of the Contract Documents remain in effect except as specifically modified by this Change order. Original Contract Amount: $ 25,088,259.00 Net from Previous Change Orders: $ 1,51.7,062.71 Total Amount of This Change Order; $ 9,999.00 Percent change in Contract Amount of this Change Order: -_ 0.04% Total Percent Change in Contract Amount to Date: 6.09% New Contract Amount: $ 26,615,320.71 Original Contract Duration: 900 Calendar Days Additional Contract Days per Previous Change Orders: 1.1.5 Calendar Days Additional Contract Days per This Change Order: 0 Calendar Days Revised Contract Duration. 1,01.5 Calendar Days Date of Notice to Proceed 6/27/2022 Original Substantial Completion Date 10/14/2024 original Final Completion Date: 12/1312024 Revised Substantial Completion Date: 2/6/2025 Revised Final Completion Date: 4/7/2025 "W111;U VI LIM 111U. :2 Recommended by Construction Manager. 8/19/2024 anllAhttslieik11, P.E, gate Construction Manager Freese and Nichols, Inc, Acce ted ntractor. Prandon Harrison Vice-president Allco, LLC Reviewed by: Amuila Villarreal, P.F., CFM City Engineer City of Beaumont Approved By; Kenneth a. Williams City Manager City of Beaumont Reviewed by Design Professional, Sheldon Buck, P.E. Project Manager Freese and Nichols, Inc. Reviewed hv, Date Brent Schmitt, P.I=. u Water Utilities Deslgn Manager City of Beaumont Reviq 4Y.. �� ao D-� !late Hart Bartknwlak Director of Public; Works City of Beaumont AAted By. Dore Tina Broussard, TRMC city Clerk City of Beaumont 811912024 Vote 8120124 (late )- pate <K° pate e FREESE CHANGE ,r: a� �I rise il$ it e Project Collier's Ferry_Pump Station Project Number Owner City of Beaumont WU0222-1.4 Contractor Aiico, LLC TX 881 Construction Manager Raml Abusheikh PE (Freese & Nichols, Inc.) BMT22198 Design Professional Sheldon Buclt P,G, (Freese & Nichols, Inc.) BMT22198 Change Order No. 008 Date 8/8/2024 Item Description Additional Days Change Amount 1 Work Platforms for 24" Manual Gate Valves 0 $ 7,702.00, 4 5 $ �� Net Change in Contract Price this Change order $ 7,702.00 — Net Change in Contract Time this Change Order 0 Days The compensation in this Change Order is the full, complete, and final compensation for all costs Contractor may Incur because of or relating to this change whether said costs are known, unknown, foreseen, or unforeseen at this time, including without limitation, any cost for delay, extended overhead, ripple or impact cost, or any other effect on changed or unchanged Work because of this Change Order. The changes in Contract Times are the complete and final adjustments for impacts to the ability of Contractor to complete the Work within the Contract Times and are the only adjustments to which Contractor is entitled. All terms and provisions of the Contract Documents remain in effect except as specifically modified by this Change Order. Original Contract Amount: $ 25,088,259.00 Net from Previous Change Orders: $ 1,509,360.71 Total Amount of This Change Order: $ 7,702.00 Percent Change in Contract Amount of this Change Order: 0.03% Total Percent Change in Contract Amount to Date: 6,05% New Contract Amount: $ 26,605,321.71 Original Contract Duration: 900 Calendar Days Additional Contract Days per Previous Change orders: 11.5 Calendar Days Additional Contract Days per This Change order: 0 Calendar Days Revised Contract Duration: 1.,015 Calendar Days Date of Notice to Proceed 6/27/2022 Original substantial Completion Date 10/14/2024 Original Final Completion Date: 12/1.3/2024 Revised Substantial Completion Date: 2/6/2025 Devised Final Completion Date: 4/7/2025 Recommended by Construction Manager, c-rlarlge uruer lvu• o Reviewed by Design Professional: 8/8/2024 Date 5holdon Muck, P.E. Construction Manager Project Manager Freese and Nichols, Inc. Freese and Nichols, Inc. Accepted by tractor': Reviewed by; Brandon Darr an Vice -President Dare Brent Schrrtltt, Ah. Water Utilities Design Manager Alico, LLC City of Beautnornt Reviewed by, ARedby: Atnalla Villarreal, P.E., CFM pate mart Bartitowlak City Engineer Director of Public Works City of Beaumont City of Beaumont Appr ved By V Wr�� h A steel By. Tino Broussard, TRMC Kenneth R. Williams � Date City Manager City Clerk City of Beaumont City of Beaumont 8/8/2024 irate 8/J/24 Date rFREESE CHANGE ORDER BEAUMONT NNICHOLS 'rFXAS Project Collier's Ferry Pump Station Project Number Owner City of Beaumont WU0222-14 Contractor Allco, LLC TX 881 Construction Manager Ram] Abusheikh P,E, (Freese & Nichols, Inc.) BMT22198 Design Professional Sheldon Buck P.E. Freese & Nichols, Inc, BMT22198 Change Order No. 007 Date 5/8/2024 Item Description Additional Days Change Amount 1 Tree Removal @ 48" Raw Water Line 0 $ 2,625,00 2 $ 8 4 5 $ Net Change In Contract Price this Change Order $ 2,625.00 Net Change in Contract Time this Change Order 0 Days The compensation In this Change Order is the full, complete, and final compensatlon for all costs Contractor may incur because of or relating to this change whether said costs are known, unknown, foreseen, or unforeseen at this time, including without limitation, any cost for delay, extended overhead, ripple or Impact cost, or any other effect on changed or unchanged Work because of this Change Order. The changes In Contract Times are the complete and final adjustments for Impacts to the ability of Contractor to complete the Work within the Contract Times and are the only adjustments to which Contractor Is entitled. All terms and provisions of the Contract Documents remain In effect except as specifically modified by this Change Order. Original Contract Amount; $ 25,088,259.00 Net from Previous Change Orders: $ 1.,506,785,71 Total Amount of This Change Order: $ 2,62.5.00 Percent Change in Contract Amount of this Change Order: 0.01 % Total Percent Change In Contract Amount to Date: 6.02% New Contract Amount: $ 26,597,61.9.71 Origln1 Contract Duration: 900 Calendar Days Additional Contract Days per Previous Change Orders: 1.15 Calendar Days Additional Contract Days per This Change Order: 0 Calendar Days Revised Contract Duration: 1,015 Calendar Days Date of Notice to Proceed 6/27/2022 Original Substantial Completion Date 10/14/2024 Original Final Completion hate; 1.2/13/2024 Revised Substantial Completion Date; 2/6/2025 Revised Final Completion Date: 4/7/2025 Change order No. 7 Recommended by Constr"uctlon Manager; If S/08/2024 aatlell-ttshelkh, P�F. Date Construction Manager Freese and Nichols, Inc. Accep d by Ca r ctor; Brandon Nat n Vice -President Allco, ILC Reviewed by; Reviewed by Design Professional: Zoo/ Sheldon buck, P.E. Prof et Manager Freese and Nichols, Inn. Reviewed by; Date Arent ArWitt, El Water Utilities Aeslgn Manager City of Beamont Amalla Villarreal, P,F.; CFM Date city Engineer City of Beaumont ReVV by; rt Biartk4 ak Director of Public Wot'l{5 City of Beaumont 6/8/2024 Date S-�lk Ante —2-0— DOW Approved By: Att steel gy: Xr1� Kenneth R. Williams pate Arta Broussard, 7'RMC npte City Manager city clerk City of Beaumont city of Beaumont CFREESE CHANGE ORDER BEAUMONT 11111111MMICHOLS T U X A S Project Coil] er's Femy_Pump Station Project Number Owner City of Beaumont WU0222-14 Contractor Allco, LLC TX 881 Construction Manager Raml Abushell<h P.P. (Freese & Nichols, Inc.) BMT22198 Design Professional Sheldon Buck P.B. (Freese & Nichols, Inc.) BMT22198 Change Order No. 006 Date 5/1/2024 Item Description Additional Days Change Amount 1 CO-004 (48" RWl_ Addition) Time impact 115 $ 2 $ 3 4 $ - Net Change in Contract Price this Change Order Net Change In Contract Time this Change Order 115 Days The compensation in this Change Order is the full, complete, and final compensation for all costs Contractor may Incur because of or relating to this change whether said costs are known, unknown, foreseen, or unforeseen at this time, including without limitation, any cost for delay, extended overhead, ripple or impact cost, or any other effect on changed or unchanged Work because of this Change Order. The changes In Contract Times are the complete and final adjustments for impacts to the ability of Contractor to complete the Work within the Contract Times and are the only adjustments to which Contractor Is entitled. All terms and provisions of the Contract Documents remain In effect except as specifically modified by this Change Order, Original Contract Amount: $ 25,088,259.00 Net from Previous Change Orders; $ 1,506,735.71 Total Amount of This Change Orders $ Percent Change In Contract Amount of this Change Order: 0.00% Total Percent Change In Contract Amount to Date; 6.01 New Contract Amount,, $ 26,594,994.71 Origini Contract Duration: 900 Calendar Days Additional Contract Days per Previous Change Orders., 0 Calendar Days Additional Contract Days per This Change Order: 115 Calendar Days Revised Contract Duration: 1,015 Calendar Days Notice to Proceed 6/27/2022 Original Substantial Completion Date 10/14/2024 Original Final Completion Date: 12/13/2024 New Substantial Completion Date: 2/6/2025 New Final Completion Date: 4/7/2025 unallgt: vl unl Ivu. v Recommended by canstructlon Manager.' ' 05/88/2024 ar�iAbushelkh, A E. Date Construction Manager Freese and Nichols, Inc. Vice -President Allco, LLC Revlawed by Doslgn Profesdonah 5/8/202 Sheldon 19uck, P.E. Date Project Manager Freese and Nichols, Inc. Revfnwnd by; Dote Brent Sc inl#t,lr Date Water utilities Design Manager City of Beaumont Reviewed by, Amaila Villarreal, I.C., Cl~M Ware city Engineer City of Beaumont A roved i0yr Kenneth R. WNltums Date city Manager city of Beaumont Rsv1e a by, aartko�Ialr Date Director of Public Works City of Beaumont A ted Bye' t& 5.'RLR-� Thirt Owossarc, llMc Date City cleric City of Beaumont Change Order No, 5 Project Collier's Ferry Pump Station Project Number Owner City of Beaumont WU0222-14 Contractor Alico, LLC TX 881 Construction Manager Raml Abusheikh P,E, (Freese & Nichols, Inc,) BMT22198 Design Professional Sheldon Buck P.F. Freese & Nichols, Inc. 13MT22198 - - Change Order No. 005 Date 1/5/2024 Item Description Additional Days Change Amount 1 Additional Pipe Support Q Meter Run Pad D $ 2,788.00 4 � $ Net Change in Contract Price this Change order $ Z,738.00 Net Change in Contract Time this Change Order 0 pays The compensation in this Change Order is the full, complete, and final compensation for all costs Contractor may incur because of or relating to this change whether sold costs are known, unknown, foreseen, or unforeseen at this time, including without !Imitation, any cast for delay, extended overhead, ripple or impact cost, or any other effect on changed or unchanged Work because of this Change Order. The changes in Contract Times are the complete and final adjustments for Impacts to the ability of contractor to complete the Work within the Contract Times and are the only adjustments to which Contractor is entitled. All terms rind provisions of the Contract Documents remain in effect except as specifically modified by this Change Order, Original Contract Amount: $ 25,088,259.00 Net from Previous Change Orders: _$ 1,50_3,997._71 Total Amount of This Change order: $ 2,738.00 Percent Change in Contract Amount of this Change order: 0.01% Total Percent Change in Contract Amount to Date: Ml% New Contract Amount: $ 26,594,994.71 Origin! Contract Duration: 900 Calendar Days Additional Contract Rays per Previous Change Orders,, 0 Calendar Days Additional Contract Times per Previous change Orders: 0 Calendar Days Revised Contract Time: 900 Calendar Days Original Final Completion Date, 12/1.3/2024 Previous Final Completion Bate: 1.2/13/2024 Revlsed Final Completion Rate: 1.2/13/2024 Change Order No. 5 Page 1 of 2 Prepared by ConstructlDn Manager[ Onto Construction Manager Freese and Nichols, Inc. Accepted by co actor. Otmdon lfarr! n Vice-president Allco, LLC Reviewed byt AmalleVIlkereal, P.E. City Engineer City of Beaumont Change Ceder No, 5 Reviewed by Design Professional[ lj:e4 11812024 $hcldon Puck, AE. Uate Project Manager Freese and Nichols, Inc. Rd by, I I sl—� evle ; � - 110-11 bats 7my AlpPttts II, FIT We W ter Utilities Design Manager City of geoumont Re ewe by: 172V Dote Dart ,Bartko w9k ante Apgilyi, �r ket�tleth �. �Illcsrtts Wnta City Manager City of Beaumont e Diree tor of Public Works City of Beaumont tdO !-1 4 A.&M, Tim I ursarr,, tnmc note City Clerk City of Beaumont Mange Order No, 5 Page 2 of 2 Change Order No. 4 Project Collier's Ferry Pump Station Project Number Owner City of Beaumont ___ WU0222-14 Contractor Allco, LLC TX 881 Construction Manager Freese & Nichols, Inc. BMT22198 _ Design Professional reese & Nichols, Inc. aMT2219V -- - Change Order No, 004 Date 11/10/2023 Item Description Additional Days Change Amount 1 Addition of Pine Street 48" Raw Water Line 0 $ 1,319,944.00 2 $ 3 $ 4 $ - 5 $ - Net Change in Contract Price this Change Order $ 1,319,944,00 Net Change in Contract Time this Change Order 0 pays The compensation In this Change order 1s the full, complete, and final compensation for all costs Contractor may Incur ;because of or relating to this change whether said costs are known, unknown, foreseen, or unforeseen at this time, including without limitation, any cost for delay, extended overhead, ripple or impact cost, or any other effect on changed or unchanged Work because of this Change Order. The changes in Contract Times are the complete and final adjustments for Impacts to the ability of Contractor to complete the Work within the Contract Times and are the only adjustments to which Contractor is entitled. All terms and provislons of the Contract Documents remain In effect except as specifically modified by this Change Order, Original Contract Arnount: $ 25,OBB,259.00 Net from Previous Change Orders: $ 184,053.71 Total Amount of This Change Order: $ 1,319,944,00 Percent Change in Contract Amount of this Change Order: 5.26% Total Percent Change in Contract Amount to bate: 5.99% New Contract Amount: $ 26,592,256.71 Origins Contract Duration: 900 Calendar pays Additional Contract Days per Previous Change Orders, 0 Calendar Days Additional Contract Times per Previous Change orders: 0 Calendar Days Revised Contract Time: 900 Calendar Days Original Final Completion Date: 12/13/ZOZ4 Previous Final Completion Date: T 12/13/2024 Revised Final Completion Date: 1.2/13/2024 Change Order No. 4 Page 1 of 7 Prepared by Constructioti Manager: Revlewed by Design Professional, U ldIJAM uraur ivo, H ` 11/1Gf2023 r1 /J %13/2023 liaeB ttshelklr, P,E. Dare Sheldon Buck, A1, Date Constractlon Manager Project Manager Freese and Nichols, Mr, Freese and Nichols, Inc. Accepted by Co tra on Reby: 13 Z3 �y,r rl ATA-3 Ilmdan Harrison V DOI J0111 Pippins III, Or Dote Vice -President iN ter Vtllitles Design Manager Allco, LLC Cltyof Beaumont Reviewed by: Rev1 a y: 1 Amalia Villarreal, P.F, � pate `} B dfi gerrtkowlak Dare City MUM eel, Director of Public Works City of ,Beaumont City of Beaumont AppYo By. - Kenneth P. W111iprns Date ihfu Broussard, f1MC Date City Manager City Clerk City of 6earunont City of Beaumont Change Order No. 4 Paige 2 of 2 Change Order No. 3 Projoct Collier's Ferry Pump Station project Number Owner City of Beaumont TX WU0222-14 Contractor Allco, LLC TX 881 Construction Manager Rami Abushelkh, P,E, BMT22198 Design Professional Sheldon Buck, P.E. BMT2.2198 Change order No. 003 Date 10/23/2023 Make the following modifications to the Contract Documents: Item Description Change Amount 1 Tree Removal @ Flow Meter Run Slab 2--------------------------------------------------------------- ----------------------------------------- 3----_------------------•---------------------•------------------------------------------------_-------_-_- --- ------------- —--------- ------------------ ..------------_----..---------------------------.._---------------------------------------- ------------------- 5 ,----.„--------------..m__..---- _ -.--_--_-_.. ----- ---------„--_----.-----_---------- --------------_...___---------- Net Change in Contract Price this Change Order Net Change In Contract Times this Change Order 0 Days The compensation in this Change Order is the full, complete, and final compensation for all costs Contractor may incur because of or relating to this change whethersald costs are known, unknown, foreseen, or unforeseen at this tlme, Including without lJmltation, any cost for deloy, extended overhead, ripple or impact cost, or any other effect on changed or unchanged Work because of this Change Order, The changes In Contract Tines are the complete and final adjustments for Impacts to the ability of Contractor to complete the Work within the Contract Times and are the only adjustments to which Contractor is entitled, All terms and provisions of the Contract Documents remain in effect except as specifically modified by this Change Order. a. Original Contract Price $25,08$,259,00 b. Previously Approved Change order/contract Amendment Amounts171,835,00 c, Adjusted Contract Price ( a + b ) $25,26Q,09rt,00 d, Contract Amendment Amount $12,2 8,71 e, Revised Contract Price ( c + d j $25,272,312.71. f, Percent Change in Contract Price to Date 0.73 Original Previous Current Substantial Completion bate 10/14/2024 10/14/2024 10/14/2024 Final Completion Date 12/13/2024 12/13/2024 12/13/2024 Change Order No. 3 Page 1 of 2 Prepared by Construction Manager; 10/23/2023 Date Construction Manager Freese and Nichols, Inc, Accepted by Contrxrtor; Brandatt Harrison Date Vice -President Allco, LLC viewed b Arnaila Villarreal, P.. City Engineer City of Beaumont Air ra ed By; Kenneth R. Williams city Manager City of Beaumont �,nangu Ur�iur ivu, a Reviewed by Design Pmfesslonal: ,�/lt �i 10/23/2023 Sheldon Buck, P.E. note Project Mpnager Freese and Nichols, Ins. Reviewed by, lei/Z3 � great srhmltt, PP. Date Welter Utilities EnglneeP City of Beaumont Review y; l _ "e z3� Ite 0 rt ffortkawlak, pate Director of Public Works City of Beaumont At ted By' pate Tura Bra'ussard, rRMC Date City Cleric City of Peaumant � MC71ifj:AU�ll ad Mtrri � `7+ p� �\ 9aoM Change Carder No. 3 Page 2 of 2 Change Order No, 2 Project Collier's Ferny Pump Station project Number Owner City of BeaurnontTX WO02?244 Contractor Allco, LLC TX 881 M Construction Manager Rami Ahusheikh, P.EI— Design Professional Sheldon Buck, PS, BMT22198 Change Order No. 062 Hate 5/16/2028 Make the following modifications to the Contract Documents,. Item Description Change Amount 1 Hectricat Work at Existing Pine St. Lift Station per' CP-002 $ J.B,g00.00 _ 2 -- -- ---- ----_-_.--------....-------------, ---------- ---- —------------- --..,1------------ g-....__.._..__......-------_..-----------------------------------..----------------------------_.._.._...----------- 4 —------------------------------------------ ...-..-_.._-_------n_--___---------- ------------..--_-._n.._-_ 5-----------------------------------------------_---------_-..----. -------------------------___.,. ______- 6--------- ----------------- ------------------ --- -- ---� -I ---- -------- _ N4------------- _--------- -----_- 7-------------------------------------------------------- ..--___---------- ...._ _ _.._ ..----- ---------------- ii---,.__., -------------------- _ ____----------------------------------------------- ___ ,.,._ __ -----------.-------_-- 9 ____________„--__..____.._____-.._-___.._-_---..__„-------------------------------------------------------.__ Net Change in Contract Price this Change Order $18,900,00 Net Change In Contract Times this Change Order 0 Bays The compensation in this Change Order Is the full, complete, and final compensation for all costs Contractor may incur because of or relating to this change whether sald costs are known, unknown, foreseen, or unforeseeti at this time, including without limitation, any costfor delay, extended overhead, ripple or impact- cosf; or any other effect on changed or unchanged Work because of this Change Girder, The changes In Contract• T1mes are the complete and final adjustments for impacts to the ability of Contractor to complete the Work withll) the CodraiI Times and are the only adjustments to which Contractor is entitled. All terms and provisions of the contract- Documents remain in effect except as specifically modified by this Change Order, a, Original Contract Price $ 25,O88,259,00 b. Previously Approved Change Order/Contract Amendment Amounts $ 1520935,00 c. Adjusted Contract Price ( a + b) $2.5,241,194.00 d. ContractAmendmentAmount e. Revised Contract Price (c4, d) �^� 25,260,094.00 f. Percent Change in Contract Price to Date 0.63 Original Previous Current Sui)stantial Cpmpletlrny Date .10/1.4/2.024-10/14/2024 10/14/2024 Hnal Completion date 12/13/2024 12/13/2024 _ J.2/:13/2024 Change Order No. 2 Page 1. of 2 Prepared by Construction Manager, Reviewed by Design Professional: "latimu VIUt:1I 1,4U. A 6/6/2023 6/6/2023 amiAbushelkh, P.F. Date Sheldon Buck, AF, Date Construction Manager Project Manager Freese and Nichok, Inc. Freese and Nichols, Inc. Accepted by 1fritractor, ��' 4--j- � 1(/1-: Brandon Har ison pate Vice -President Allco, LLC Reviewed by: -\ \X Amalfa Villarreal. P.E. City Engineer City of Beaumont Ap r ved By. etrnet#a li. t�Vilflains City Manager City of Beaumont Reviewed by: Fv do ll�ne ourkart, Or pate Roadway Designer City of Beaumont 4 ` ;Revi ody: Dart Ba 6artkowlak Date Director of Public Works City of Beaumont Atte t d Byti Date Tina Broussard, TRMC City Clerit City of Beaumont Date Change Girder No, 2 Page 2 of 2 CITY OF BEAUMONT Wile: September 14, 2022 project. WU0272-14 Coffier's T'ert•y Ptnnp $Inflon Owner: CRY Or11 ouil1oltt Cmltractriv. Allco, LLC Change Oulu Nu.: I Tlii OLIAIV N9 CIIANGJIS I>!l'I'IIC PLANS ANWOR $PiLIRI0A`I'ION3 A1tr HEREDV NIADEs Re-roltia an oxtsihrg eleOrlcal duct hank thnt conillels whit ilia tunneling s11a0, 1t0111 No, . ......tleseri tlan Unit Ort lilac Ilantlt NC1Y llantlt Rlultl'r1Cer11anE11 LA ADD A.2,1 12LTROU1 l311ICi1t1CAiDUCT BANK-LAVSONRtVPS iS 1.00 S1522935.00 $152,935.00 SUaTp'1'AY S152935.00 TOTAL AMOUNT Or THIS CHANCE, 010M9: $152,935.Of. - 0ALMt.)AIt DAV9 vviLI, BE. ADwD TO THE CONTRACT TIME UY THIS CIIANGi ORDER OlUCINAL CONTRACT ATi'MOUN'I'1 NET 17ROM PREVIOUS CHANGE ORDERS: TOTAL AMOUNT OV TIIIS CIIANGX ORDER. PERCENT OV.TIIIS CHANGE ORDER- COTAL PERCENT CITANGE ORDER TO DAUP: NEW CONTRACT AMOUNTi 25,098,259.00 S _ S 152,935.00 0.,51% 0.61 % $_ 25,241,194,00 ORIGINAL CONTRACT TIM1L+1 900 Calendar Days ADDITIONAL CONTRACT TIMT, PER PRUrVIOIJS CHANGE ORDERS! 0 Calendar Days. ADDITIONAL CONTRACT'TIA1L+ PER TI(19 CHANGE ORDERI 0 CnlancW Days RRY118 .I) CONTRACT TIME,. 900 Colandar Days PMUDIT'ION OR CIIANGEi "Contma for acknowledtics rind agrca3 that lha udluSllnants Iti. Coiltracl pr1Co al{d ottl[Slct tune stipulated fit this Change Order refiresenls Pall conlpeasatlon for at increases alld decrcasus in thu cost of, rind ilia liala required to perform fic entire work under lire coalrnat ortsillg direelly, or Indirectly from Ihis Clump Order laud rift previous Change Orders, Acceptance of this lvulvcr consllliltcs aft agreement hetweell Owner and Conlmclor thul Ilia Chauge Order represenis au all inclusive, mutually agreed upan adjustui ant to Iltc Couirnai, and that Contractor will valve all rights 10 file it Claim ou tlds Cllallge, Order rifler It Is properly executed." ACCEI'TE1]rl3 ALLCO,LLC IDATE CONTRACTOR RL�VILrVD AYI AAIALiA YILLAIZIi�AL, I',L+, bATI CITY rNOINVER PREPARED BYt �- EVANGMINEIIURICART, EIT DATE ROADWAY DrSIGNER REV) Yl. J1Yt hAX&9 � r IIAIRTKOIVIA t HATE DIRWr TOR OV PUIILIC WORKS AND TCCRNOLOGY SERVICES