Loading...
HomeMy WebLinkAboutRES 24-218RESOLUTION NO.24-218 BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF BEAUMONT: WHEREAS, on July 18, 2023, by Resolution 23-193, City Council awarded a contract to ALLCO, LLC, of Beaumont, Texas, in the amount of $29,191,513,63, for the 48-inch Pine Street Raw Water Line Project; and, WHEREAS, Change Order Nos.1-4, in the amount of ($8,894,091,65), decreased the contract amount to $20,297,421,98; and, WHEREAS, proposed Change Order No. 5, in the amount of $185,934.00 is required for additional construction effort in response to unforeseen conditions related to existing infrastructure. If approved, the new contract amount will be $20,483,355,98; and, WHEREAS, an additional one hundred and thirty-four (134) calendar days are needed to complete the work; NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF BEAUMONT: THAT the statements and findings set out in the preamble to this resolution are hereby, in all things, approved and adopted; and, THAT the City Manager be and he is hereby authorized to execute Change Order No,5, in the amount of $185,934.00, for additional work described above, thereby increasing the total contract amount to $20,483,355.98, for the 48-inch Pine Street Raw Water Line Project; and, THAT an additional one hundred and thirty-four (134) calendar days are added to complete the work. The meeting at which this resolution was approved was in all things conducted in strict compliance with the Texas Open Meetings Act, Texas Government Code, Chapter 551. PASSED BY THE CITY COUNCIL of the City September, 2024. Beaumont this the 3rd day of Roy West - CITY OF 6l:AUMONT Dare: July 40, 2024 Pra)oai: Pine Skeet 0-kich flew Water Lino County: Jofforsoo u€sidct: noRurnont Contract Number: BID NO, W1.11023.01 0wnon City of Beaumont Contractor: ALLCO, LLC C,O. 140.1 d THEFO LO O CHANGESI THE PLAS A14DIORRPECIFICATF NS Attu Wow wm Those changes Ara required to oddrhas field condiddns encountered Al each lototlon noted in Item 6.1 (Plan Sheet PL-022), Ilam 5,2 (Plan Sheet PLQ4), Item No, 6,3 (Plan Shoal PL. 021), €lent 6.4 (Plan Sheet PL-028), end Icons 5.6 (Plan Shoals No. PL-031) of this Chango Order. The unforeseen conditions ancouMared refalas loateYatlons of oxislIng Willies. The Contractor must toner the proposed 46" water line to provide adequate clearance between the proposed 4D" walor tine and the hxlsling utilities verified In the geld Lawadng of the proposed Wwalerlino adds addlllooal expense by the Contractor for manpower, equipment, and bank send bedding malarial of the proposed 48' waWrllno. Thu Engtnaerof Racard rocommended to adjust and tourer lho proposed vroler line to provide adequate minimum cienrances to oxisling utilihla s and the City Engineer Concurs v lth this recommendatton, (Sea Contractor's breakdown of malahais, labor and equipment to lower the proposed 46" water line). Add TWonlyhvn (26) additldnat days for Change Ord4r Items 6.1 thru 5.6. Add nt noly (90) addillonal days for the manufacturing process of iho proposed tit .Hobas fiberglass water line pipe, Add nineteen (JR) addlional days loran knlergy conduit ton8lct ontounlored w1011he proposed 40'svaler llna. Agrand 401al of 009 hundred ihidyfour (134) calendar days Will be Added for IW Change Order, Itenl No. Item Code DESCRIPTION Unit Original Quan Ily Changa in Quantity Unit Price Total Plan Shoal PL-022, fe&o proposed 48" walar lino CO.5,1 crossing under10'x5box culvert AtManning Street; LS 0 1 S 62,133.00 $ 82,133.90 Add 9 calendar da s. Plan Sheet PL•024, wise proposed 48' Water Eno CO.5,2 crossing undaredstingdoubloharral42"storm LS 0 1 $ 72.417.00 5 72.41W,00 sewer6 at Lethia Sifeel; add a 21,33 degree bend to the proposed W water line, Add 0 calendar days, Plan Stteal Pl" 027, ravish proposed 40" waler€€rle CO.5.3 cra6singurlderoAsungi6"610misawaraiL1ye0ak LS 0 1 S 9,72840D S 0,720.00 Streal;Add2catandarda s. Plan Sheet PL-020, revlset proposed 40' walerNia CO-5.4 crossing diagonally near Spruce Street; Add 3 LS G 1 5 118,439.00 $ 16,43900 calendar days, CO.5.5 Plart Shoal PL•031, add a13,3degreabandtotheproposed 48" LS 0 1 S 23,219.00 s 23,210,00 water line; Add 2calendar da s. TOTAL AMOUNT OF THIS CHANOEO DII3 S 106,934.00 1340ttINDARDAYS5OL eEAUDEO70THIS CHANGEOROER ORIGINAL CONTRACT AMOUNT: S 29r10161b.ea NET FROM PREV€OUSCHANGE ORDERS: S I0.890,441.01 TOTAL AMOUNT OF THIS CHANGE ORDER: $ 185,934.00 PERCENT OF THIS CHANGE! ORDER; 0.64% TOTAL PERCENT CHANGE ORDER TO DATE: •29.85°% NEWCONTRACTAMOUNT: $ 20,478,005.98 CONTRACT TIMk ORIGINALCONTRACTTIME: 452 oatendardays ADDITIONAL CONTRACT TIME PER PREVIOUS CHANGE ORDERS: 7 calendar days ADDITIONAL. CONTRACT TIME PER THIS CHANGE ORDER; 134 calendar days REVISED CONTRACT TIME: 693 calendardays OHAWE4 'Contractor acknWedgas and ogre e s thalihs adltntmenls In contract price and contract tuna sUpdaledin this Changa Prdef represents f01Is0mpe61a8an (Or 991110e21e s end deat a Ias Inthe Cos of, and tha t'morequired top Wean the enliro vvtk under Ilse coninsel arising&tdtyor Ind oWj From 1169 Chang a Order and or previouschange ordom. Act0plan00 of this walvart4W1ulos on egr0omanl holneen Onnorend COnVatlor Thal IM Changtrbrdar repfastnls en dlilndusIva,rnulualy named up an adjushnanl to tha Contract, and Ihal ConlraclorvdlI walve all rights to (ilea delm on This Changd Order after I is psopedy executed." ACCEPTED BYi RIEVIEWE€9 aY: 08/22/2024 Leo, - ap PATG enf6aE ANp NICH0L3,lNn-nap OAIE REVIEWED RYI VIEt 7AK DAIS OTY ENGINEFA OIRECTOR OF PU01.W wOHK0 APPROVED BYI ATTESTED BY: $iENNETHR.YbLL103 DATE TINAOROUSSARO DA19' CITYMANAnER c1TY Mhtr( CITY OF BFAUMONT Dale: April24, 2024 Piojecl: Tilde streel44•Inch RawWAIo( Line County; jofforsort District: BQanmont Contract Number: BID NO. WU1023.01 Ovmar; City of Beaumont Contractor: ALLCO, LLC P.O. No,i 4 Tt E rOLLOWINO CRANGES IN THE PLANS ANWoR 4PKCIFic,A-iriONS ARE HEREBYDE; These thanges Pro required 19 address an unforeseen condttlon encountered at Pine Sim el S1a, n0a 2Y (Plan $heal No, P4-009), There Is an exlsiing dolodoialed 34ont x2-fool concrato box storm sower encountered hodzonlal to and above tho pathway of the proposed 411,inch diemelorwalor lido. Tha oxisgng dotedorelad boxslonn sower is nolahotvn on the Plan Shoot end Iwt doled on any City Record Dfawing erMap. Dalh ends of Ihd storm a agierara called out as exIsgng 24-ineh storm sower pipe on th© Plan $heal and a lst as 24dnch storm sower at each or the hvo ends O tho pipe but the uniormsean candlgan was found lobo dotoriorralod box storm eaworundor Frog Slraal at Sia, 30+22, it is nocassary for gra Contractor to remove Oto extsling doledoratod concrete box alarm sewer that crosses Pine Strael at Sla, 30+,22 and ioplacowlth now 24-Inch diameter ADS HP Storm Sower becunso the coneIllon of thu discovaied concrela box storm sowerth&I crosses under Pine Street Is In very poor condition. The Contractor submllted RPI No.10 (copy attached) fordlfectton. The Englnoor of Record ro W nVnendod to remove end (eploco the datedmaled oldsting ConUele hex alarm sewer v41h new 24•fr1El1 inarrteter ADS HP Anfm sewer arld tho City Engineer concurs With Us recommendation, Two (2) addigonat days cviii be added for this Change Order, Nam No, Item Coda DESCRIPTION Unit Original Qua n1ll Ohadpaln Ouanlil UnilPlloo Total CO-31 Ramovoand replace edstrigbox &termsowerveithADS HP Storm Baiter at Dino Slreel Ste, 28+00 LS I 0 I 1 s 6.060.00 S 6,350.00 TOTAL AMOUNT OFT IS CHANGE ORDER s 6,350.01) 20ALENDARPAY91VlLL6bA60r?OTO7HltCi4 II05OR rt ORIOINALCoNTRACTAMOUNT; $ 29,191,613.63 NETFROMPREVIOUS CHANGE ORDERS: $ [8,099,441A TOTALAMOUNTOF THIS CHANGE ORDER: $ 6,350.00 PERCCNT OF THIS CHANGE ORDER: 0.02% TOTAL PERCENT CHANGE ORDER TO DATE -30.47% NEW CONTRACT AMOUNT: S, ......20 ,207,421.93 CONTRACT TIME ORIGINAL CONTRACT TIME: 462 caloadardaya ADDITIONAL CONTRACT TIME PER PREVIOUS CHANGE ORDERS: 6 calend'ardays ADDITIONAL CONTRACT TIME PER THIS CHANGE ORDER 2 .caieadardays REVISEO CONTRACT TIME: 469 caisndardays CONDITION OF CHANGE: "Contractor DCMOVdadpes and agrees Ihaltho adjusim4als In conuact price and contract limo sdpufated In Ihls Change Order represents full compensation for all Increases odd ddcroasoe In the cost of, and the time ioqu$ed to perform th a en6ro work under Die conbaci addng dire till ar indirecgy from gds Changa Order and oJI previous Change Orde is. Aeteptaaco of this waiverconsEtulas on atmomonl liftoon OArier and Contractor that the Change Ordarroproaanls on as Inclusive, mulualyagraedupan adjustrnanl to the Contract, and that Contractor will walvo s:l dghls to Ma a claim on INt Change Order en4r 11 fa property oxsculed.' ACCEPTED BY: LLnn, LLC. Ep D E REVIEVY90 BY: ARALIA VILLARALCAL, PA., CFAIDATE CITY ENGINEER ,A.PPROVEDBYi Ij a R - -� KENNETN R. VALDAMS DATE CITYAIANAeI:R RliVlf;V'JPD Carlos Quintero 04/M/2024 FREESE AND NICHOLS, N1a - Re P DATE REVIEWED TDA KD4NAK DATE OlKeaTOTt of P I)8 Llc 4v4AK4 ATTE B BY: G�.6 ` $ ' 74 TINA ©R017ss.. - DATti CITY CLERK CITY OF BEAUMONT Data: April 8, 2024 Project! Pin i Sleoat 48-Inoh Raw water Lino County: Jefferson OlstrkU Evaumonl carill tNumhar: HIONO.WU1023.01 Owner: City of boaumonl Contractor; ALLCO, LLC 0.0, No.: 7 _... __.. _ _ _ _._ _ 11E FOLLOWIUO CHANGES IN THP PLANS ANDJOR SPEC F GAT 0 S ARE HERELIY MADE: Thaso changas Ara rerlulmd to address nn unfare seen condidon encountered. Dudnia a Raid walk thrnugh using a malaldatoclor, held paasonal located a manhala Ild covered 1n debts and did adjacanl to the fitteraecdon of Coleman and One Street. TNs corresponds roughly to Sle.4Sr30 (Plan Sheol PL-Olt) of Ilia 48-Inch Pine Most RWL Conslrucllon Ora7dngs, Fudhae rnvosligallon Tndicated that [his Is sanitery sewer manhole outside the wdsting asphail pavamen] near Via east R.O.W. of Plne Street yfilchis not shaven on lha plans, Aflar fntemat Inspecdans wale conduttad, H was dalarmined tflat ihIs manhole Is lied la the 6Mang sanitary savior tnaaholo shown on Plan Shaer PL-0141n Via Intersection of Calamon Slraal and Dino Simot (soa'rAd mark-up' ollAchod in RFl-ii ), Aftor vad fig oidstlng sanllary sewn( alovallons at each of Nra iwo sanitary manhclas naiad II appears lho proposed 40-inch water Tina Is In vortical cangtct wig€ the existing sanllary aon'aral Sla, 45+80, Tha lnslallevon of two newsanllary manholos and lowering of Iho exlsilog 10-inch sanllary, a invor erosaing Piro Wrest Is nocassary (o avoid a conlifdYAO€ the Proposed 48-Inch water line. Three 13) additional days W11 be added for this Changa Order. item No. Item coda DESCRIPTION Unit Ortglnal Quantliv Chang, In Quantity Unit Prlco Total CO.3,1 Remayo and replace exsting nw (2) sanitary manholo and War oxlOngsanitary sawerinconillolwllhlhaproposed 48-1nc11 wo?tline at Pine Street Sta.46480 LS 0 1 $ 57,744.00 $ 67,744.00 TOTAL AMOUNT OF 7111S CHAN09 ORbER $ 57,744.00 3 OALaf OAR DAYS 119Ls. DE ADDEDTO THIS M DE oROER ORtr31NALCONTRACT AMiOUNT: $ 29119115f3.63 NEr FROM PREVIOUS CHANGE ORDERS: $ 8,857 156,65 TOTAL AMOUNT OF THIS CHANGE ORDER: $ 67,744.00 PERCENT OF THIS CHANCE ORDER: 0.20% TOTAL PERCENT CHANGE ORDER TO DATE: -xo%. NEW CONTRACTAMIOUNT: $ 20,292,071J30 CONTRACT TIME ORIOINALCONTRACTTWA , 462 cerendardays A01]rTIONAL CoNTRAcTTIME PER PREVIOUS CHANGE ORDERS; 2 catoridar days AODrrIONALCONTRACTTIhiEPERTHtSCHANOEOROER: 3 wtondardays ARMSED CONTRACT TIME: 457 cafandardays CONDITION OF CHANGE: 'Contractor AcknWedges andagreas lhai the adjuslmoals h contract price and contract Rma si;twlatad In rids Change Ordarroprosenls fug campensauoa forall lrwansas and decreases In Die cost of, and the 11M raqutred to portarm Ilia anti$ work uad ar lha contract arising dkocNy or &-Oractiy from Ws. Ch en8o Order and as prevlous Changa Orders. Atcaptance of M waiver c4ruEiNlas an agreemanf bowmen Ovmer and Contractor that the Change Order I4preSenla an as inr4asFre, mtuaNy agre4d upan adjustment to the Conkacl, and Ulcl Contradde vdil walla all tights Wile a claim on this Change Cr4ei enar II ;e property axecuted' APPROVED�13 HSH31nTH R. WiLL1AMa DATE 41 FY MANAtaER C4 REVIEWED BY: (a arias Quintero 04/08/2024 FREESE AND NICHOLS, 111C • REP DATE REVIE 0 R ART hTKOwIAfC GATE DInECTOR OF Punt10 WORHS ATTJEODAT CRY CLERK W111 NIT,ik. CITY DE BEAUMONT Dole; tdwc€I 22, 2024 pfo)actl Plno street 48•Inch Raw Welar Linn County: Jefferson D$altlol: Dsaumonl OQnlreot Numben DID NO, WU4023,Dl OwRerl city of 004umoni Contraa1or: ALLCO, LiC 0.0. No,l 2 THs O7 LO I a CHANGES T EPA t D OR GPEC F OAT 0 8 til3 H[RED OM 34s$ clivAps woJ4q—uTrFd-1a-aVffiess an un arasoan wn on oAcoonlarod ol vina 11"Oltiol, t an tinhOl No,vk.uuuI, iftato ig an Dx sl ng a o ors a 3• oD x 2• o0 concrole box olarm sower oncounteredllo:aconlal to and obovo Ole pslllway of lho propoaod 40-lach dlenwtot water 11na, Tha axhting dataAara€ad box sloun sowor Is not shown on the Mort shoal find not noted on uny City Record Drawing or Map. Sloth node Of the alarm sowor Oro callod out ns axlsOng 24•Inch aterm sowor plpo on lha Plan Spool and oxlet os 24dnch 41orm Gower At each of the hvq ands of the pips but tho irolofatsoon condlllen Vtas found to be dotedoiatod box atotm sewer under Pine Stra of at S1o. 20; 00. II is necessary for ilia Conlractor t0 ramoyo the oxlsling doloflorelad MAcrolo box $term ealyor lint crossoa t tno Street at 810, 28100 and leplata whh Rew 24-inch dlamOtor ADS HP .Storm Sewar llecus56 Iho condlOorl of lho dlacovorad conwotobox storm sovw (bal Classes tinder PInD Street I In Vary poor condlilon, The Contrnctor oubmtttod RFI No. 0 (c)py attached) (or dfrocllon, The Eng€Aoor of Record rseornmondod to torrwvo nod toptsto the doloiloralod oxhitng contiolo box atofm sower wflh now 24•Ineh diameter ADS HP storm 4owot and the Oily Enginoor toncufs Win this recommondollon, Two (2) addillonal day$ Will bD added ter this Change Order. llom No. Item Coda 01160111pTIoN LIDO OrlDlnnl 00hritily Ctionpa In quanlll Unit Price Total CO.31 Romvoand replace extslingbox storm sovrorwlthADS HP LS Storm tawar fit PMO Street Sla.28100 tl 1 $ fi,36II.40 S 6,86b.n0 TOTAL Amnunr OF THIS CHA CEO De 0o 1:NDArtPA 8 VVILL Of! ADOEOYOTill$ WIA110ROHDEo. ORIGINAL CONTRACT AMOUNT: $ 2g,1D1.613.tl3 NET FROM PREVIOUS CHANGE ORDERS: S (0.$62,06.0 ) TOTAL AMOUNT OF THIS CHANGE ORDER: 6,360.00 PERCENT OF THIS CHAROP ORD5Rt TOTAL PERCENT CHANGE ORDER TO DATE; 3D,BD% NEW CONTRACT AMOUNT: $ 20,234,3227.08 CONTRACT TIME. ORIOINALCONTRAOTTWIEz 152 calendar days ADDITIONAL CONTRACTTIME PER PREVIOUS OHANGE ORDERS: p Calendar days ADDITIONAL CONTRACT TIME PER THIS GHANGE OROEf{s 2 oatondst da s REVISED CONTRACT TIME, 464 celondardeys CONDITION OF CHANGE[ 'Coniratlar acl,nmvlodgas and apom 1W the adjuslmsnle In conhocl pdco and contract time dlrpUlalod fn this Change Order roproseala Cult companstlft for oll lncf aa6e5 and docroolos Ift the costal, and the Una (equtod to Perform tho snWo vqotk under the collijacivIsInp dkdclly prin0ad- homWeChangeOrderandalpravlousChangeOrdat$. Acooplance of lhls walvar tons€hisa an agreement bohysan Omar and Contractor €hat lho Chengo Order roprosanls an all hlcluslvo, molusty ogfo od upon odJvstmont Who Con€raol, end that Contractor will waive all ilghts to Me* s claim on lhls Chango Order after 111s properly executed' APPROVED DYI 7Sl:rttisTY�8�f OITY h MAM REVIEWED DYI OS/ 25I 2024 FRE89E AND IItCIi0L8,111U REP DATE RPVik D NYI hRT TItOlYIA W DIREOYOR OF PUDLIO WORM AT T4013Y: s r INA n sA firs CITY O011 K CITY OF BEAUMONT Date' Jaiy 11, 2023 Pra)ecl; Plea 61real46•IrichHswlh'alorLine County: J06(cOn Diskr)cl; Deaumont Contract Nunebou Bib 1,10, WUia23.01 owner[ city of BeaUhSant Oonlractor: ALLCO, LLc C.O. No,: 1 T E PO LOWING CHARGES IN TN S AN UIOH $Vl:C1.1CA7 UN8 ARE HRRED h1ADE ----I Theea Changes Bra ragVlred to mddca the ovoreil pra)od cost ntrough Value ongineering. The section of 424nch p'pa that Was rarawad y4ti be. incorporated Into the fuluro 1100ancy Una project, The 665 foot section of 40 rich pipe Ihat was removed will be added la the Colljat's Ferry Pump Stal€on Pw;ecL TIIO change in pavement design will nol reduce lha struciurat number of 0io !in'ahad pavement. Tho pipe tPutadal end changes in elavalfon vX not Impact the Cepaclty of the f oa. No addtdonat Orna Hon be added for 06s change order. Item No. luntCoda DEWHIPT1ON Unit Cdgi"al Chargn n UnllPrka Total uar�lif Oa 1 + ADD A-53 - 40-InthFRPWater linabyOpen Gul.Construol€on LF 4 13,643 $ 818.61 S 6,458,339.23 A•FA 40-InchFRPVlalarLine bylTrenchlessConaWcilore -Way LF 6 1178 S 2,374.74 S 422,703.72 A-58 _ V&EHMACPavemmtRagacemenl Indnda Ka Iransl' t TON 0 7,110 $ 243.00 ;; 1,727,730.00 A-67 Flsdhte 6aae 10" (NAw) SY 0 43,090 $ 51.25 $ 2,466,902.5a A-58 Geogdd sy q g3ps0 $ 3,16 $ 161,587-60 - SUBTOTAL $ 13,232,182A5 oEL6TE _— A-02 • 46•IachSteel Water Line byOpenOut Can*wtlon LF 14.508 -14.300 $ 008.47 $ (12,908,3a6.761 A-04 - 4E4osh Stan] Willer Linn byTrontktress CanstWdion LF 178 -178 S 2,617.0 S (463,073.74) A-14 4-inthCorrWPaiio XrValvaAssamNypAhAcdts3Menhole EA 11 •1 S 76,268A0 S (78,250.00) A-23 - cathodloProteadon LS f •1 $ 175.000.00 $ (175,600.00) A-20 • t HMA0PavementRaracement(Induda drivowyy trd6QIo0&j TON 0,062 •9,052 S 243.00 S (2,1(19,638.00) A-30 - Limo- FtyAohTie aicdSuhgrada(B-Inchna) Sy 41,140 -41,146 $ 18.60 $ (761,2a1.00) A-3f - 1-4ne- Fly AshTrealad8obgreda(0-)nchas) TON 655 -555 $ 274.00 S (162,410.00) A•32 - Fly Ash TON 1,352 -1,332 $ 274.00 $ (364,966,00) A-33 CemantTraat(NewDsse}(0') Sy 1,944 --1.844 $ 61.70 S (1i8,844.00) A•34 CamanlT(aat(Nov)Bast) (10'� Sy 41,145 -41.t4d S �86.35 $ (2,6a8,891.10) Elecl*isfPower conneoloit for Calhod€aprotac0on $ elan LS f -1 $ 35,000.00 $ (35,000,00) J•01 42-InchReOlfanoy4YL"lizailon LS 1 1 $ 70,000,9a s (10,000,00) J-02 - 42-146ske:lVdmvUnebyOpen Cut LF I'm .1,005 $ 1,052.64 $ (1,057,602.70) J-03 - 16-lacb616alOWngsfor 5en€tetySewer Lines Lr 23 -23 S 399.00 $ (0,177.00) J-04 Dawatddng LF 1,005 .1,005 $ 47,00 $ (47,236AD) J•06 42-inch Cer111e00h to Rosglancy Water Line LS 2 -2 $ 38,200,a0 $ (75,400.00) J•06 SIVPPP LS 1 1 S 5,006,W $ (51000.00) f•07 Tranch Safety LF 1100$ -11005 $ l,6(1 $ (1,005.00) J-08 Ce01ad1aPcotacVon Le 1 .1 $ 19,000.110 $ (19,000.00) J•00 - FlowabloF111 1.3 1 -1 $ 15,060,00 $ (15,000.00) J-10 - Inslel)adonofl2•Inch130Vand AppriMnancaa 111A 1 •1 $ 75,330,00 $ (75,330.00) J-11 Insiallallonof42-InchHFVand Appurtenances VA 2 •2 $ 152,700.00 $ (305,560.00) J-12 Removing Stub Base and Asph Pav (6'-1') Sy 1,410 -1.410 $ 25,10 $ (36,801.00) Jd3 Remove Goneroto (Gurbond Ouker) LF 830 •030 $ 16.24 $ (16,139.20) J•14 4"HMAGPavamontReptacemeni TON 607 •507 $ 205.00 v (155,55600) J•16 - Unite, Fly Ash Treated 3ubilrade(a'1 Sy 1,410 •1,4io $ 2801 $ (3a,460,00) J-14 Nrna TAN 19 -i8 $ 276,00 S (6,226.00) Fly7uh TON 45 -45 $ 274.00 S (12,375,00) J•18 Cement TIM(Now Bow) (Ia") 6y 1,410 •1,4I0 $ 70.66 $ (Da,530.60) J-19 - 0ardtedes.8ign%es)dTmfflofiandling MO I .1 $ 13,600.00 $ (13,000.00) J•20 - Concret+3 Gorb and GultCr LF 030 -830 $ 49.39 $ (40,093.70) J-21 - REFS. PAV M RK Ty If tY14" (61-0) Lr 6a0 -500 $ 2,60 $ (1,400.00) J-22 Roleoolo0-InOSan%ary5awor €P 226 •220 $ 96.00 $ (21,880.00) J,23 Romm and Reloaalo dnrh I ls. Bun lacy Sower nhol EA 2 .2 S 0,000.00 $ 1]',800.00 ( } J•24 AbandonlRemm12-Inch Pipe, IF 30 -30 $ 20.00 $ p800.00j J•26 Install l2•InchHPPEPIpe LF 30 .30 $ 142.00 $ 14,470.00) J•26 Rapiuee 12-lnsh Valyoa EA 3 •3 $ 4,000.OD $ (12,000,00} SUBTOTAL, $ (22,394,7wou) TOTAL AMOUNT OF T1418 CHANOE OROERS (B,D02,535.85} e n R DAYS WiLD D o c aeon ORIMALCONTRAOTAMOUNT; $ 29,591,fi33.63. NET FROM PREVIOUS cHANnE ORDERS: � TOTAL APdOUNTOFTHIS CHANGE OROER; $ l9,962,655,051 PERCENT OF TIt19 CHANGE ORDt!Rr •90,70%_ TOTAL PERCENT CHANGE CROERTO DATE: " ry0,70! NEWCONFRACTAWUNT: 4 20,228,977.93 e ORIGI ORl01NALc0 TRACT TIME: 462 calendar daya ADOITIONAL00KTRACTTIM6PERPA VIOU3011APIOEOR0ER8: 0 oalendaedaya ADDITIONAL. CONTRACT TIME PER THIS CHANOE ORDER: 0 cars dardm 13EV18EDCONTRACT TIME: _462 calandstdaya CONDITION OP CHANGE{ "ConiraclofacAnGMsdgasand agrees that IhsadlusWentsInw0mp tpdceandcwhaclOmam1pulatddintKa,ChangeOrderreprasanlsfulcomponsalranfare9Imams and decraoses In iho cost of, and the 9nta raqulred topeddim Ihs more workundor Iho oanlradadsing dlrecOyorirtidlreclly from IN) Change Order and altpredlausChange Orden, Acceplence of lKs wAlvar consUlulas an egreemanl bahvoon Omar an6 Connector that the Change Order represanle an sll lnclusive, mulutHy *greed tspon sd;uatmenl la the Conlracl andlhat ConVaclorwpl WAY4 ail 110hlo to 61aa datm on 114%Change Orderafterh Is property emulaW AOCEPTno 0Y; AL O, �-' DA n REVIEWED 13Y: AfVMAQA VILLARREAL, P.E., CFM DATE CITYEN0I14EER APPRO EOHY: ,reW,,.P- 7 KENNETPI R.yALLIARis DATE PITY MAll.aseft CITYCLERK 1-2-3;