HomeMy WebLinkAboutRES 24-203RESOLUTION NO, 24-203
BE IT RESOLVED BY THE CITY COUNCIL
OF THE CITY OF BEAUMONT:
WHEREAS, on January 24, 2024, by Resolution No. 23-030, City Council awarded a
contract to Callan Marine, of Galveston, Texas in the amount of $16,979,376.00, for the Riverfront
Park Restoration Project; and,
WHEREAS, previous Change Order Nos. 1-3, increased the contract amount to
$17,039,121,46; and,
WHEREAS, proposed Change Order No. 4, in the amount of $174,742.00, is required to
add or modify contract items in order to ensure safety to the public or to adjust current contract
bid items to meet current site conditions; and,
WHEREAS, the contract includes a contingency allowance of $1,000,000.00, if approved
Change Order No, 4, in the amount of $174,742.00, will be deducted from the contingency
allowance resulting in no change to the current contract amount;
NOW, THEREFORE, BE IT RESOLVED BY THE
CITY COUNCIL OF THE CITY OF BEAUMONT:
THAT the statements and findings set out in the preamble to this resolution are hereby, in
all things, approved and adopted; and,
THAT the City Manager be and he is hereby authorized to execute Change Order No. 4, in
the amount of $174,742.00 for additional work described above to be paid from the contingency
allowance, thereby resulting in no change to the current contract amount of $17,039,121.46 for• the
Riverfront Park Restoration Project,
The meeting at which this resolution was approved was in all things conducted in strict
compliance with the Texas Open Meetings Act, Texas Government Code, Chapter 551.
2024.
PASSED BY THE CITY COUNCIL of the City of Beaumont this the 20th day of August,
Mayor Roy West -
'13
t f) 4
Projectmates
CITYOFf3EAU MONT.PROJECT MATES.COM
Change Order #001.004
PW1023-02 - Riverfront Park Restoration, 801 Main Street, Beaumont, Texas 77701 USA
Monday, Aug 12, 2024
Change Order Details
Description
COH001.004: Change Order 4
Grand Total: $0.00
Division
01 - General Requirements
Scope of Work
This Change Order is necessary to add or modify contract items in order to ensure safety to the public
or to adjust current contract bid items to meet current site conditions The costs for the following items
shall be credited to the contract's contingency budget: Construct an additional 94 linear feet of
handrail around the outfall structure to enhance safety; Install two Tideflex valves In the 48" storm
sewer outfall pipes located within the outfall structure; Add 11 feet 6 inches of sheet pile return wall on
the south end to accommodate the pending construction of the Port of Beaumont's sheet pile wall;
Remove and replace 16 feet of 48" RCP storm sewer; Cut concrete piles to the specified grade;
Adjust the quantity of dredge material based on the results of the post -dredge survey.
Notes
Lanier & Associates submitted Rev 001- Rev 008 on the Construction Drawings and they have been
included In this Change Order for record purposes. Please see the attachment "Explanation of
Drawing Revisions".
Awarded to
Rick Alexander (Callan Marine Ltd), 29143
Created By
David Tingle (City of Beaumont)
Create Date
Jul 22, 2024 09:02 AM CST
Reason Code
Days Changed
Attachments
Additional Info
Line Item Type
Owner Requested
28
002 Tideflex Checkyalve q otu gs.! lsg
003 New 5heets.msg
004 Replace 48 RCP - Beaumont 04.12.2024.W
Callan Marine Concrete Pile Invoice 0Z,08,24 2 pdf
�xplaaation of Drawing Revisions- LA10888-1,Ud(
Lump sum
Group 3.0 Construction
Dates
Created On
Capital Planning
Capital Planning
Capital Project Fiscal Year
Accounting
Jul 22, 2024
Construction - Riverfront Park Restoration
2024
Item Id 576
PO Number 441200
FEMA Number 6499
Accounting Project Code H13015
Summary
Original Contract Sum
Net Cost by Previous Approved Change Order
Contract Sum Before This Change Order
Contract Sum Changed By This Change Order
New Contract Sum
Substantial Completion Date
Net Time Change By Previous Change Order
Substantial Completion Before This Change Order
Time Changed By This Change Order
Now Substantial Completion Date
All Change Orders of the Original Contract
Line items
16,879,376.00
159,745.46
17,039,121.46
0.00
17,039,121,46
NIA
12 day(s)
N/A
28 day(s)
NIA
0,946394346383383840729667300%
Item Account
WBS/
Description
Total
# Code
Section
Amount
Change Order 4
001
002413
Installation of (102LF) Additional Handrail Around O IMI Structure ($527,16/1-F)
53,770.55
002
002413
Installation of (2) Tldeflex Valves In the 48" pipe at Qutfall Structure
94,224,10
003
002413
Installation of (18'4"LF) of Additional Sheetpile forReturn Wall ($4,756.19/1-l)
53,105.D5
004
002413
Installation of an Additional (161-17) of 40" i2CP Pipe ($591,39/LF)
9,470.25
005
002413
Quantity adjustment for Dredge Material Following the Completlon of the After-Dredge
-58,292.65
Survey
006
002413
Cut Concrete Plies to Grade
14,764.85
007
002413
Additional (50) Frame Tubing on Large Pavilion ($53.98/LF)
2,699.06
025
002413
Project Contingency
-474,742.00
Total
0.00
Approval (pending)
Due Date, Aug 19, 202,4
User / Role Status
Brett Roebuck (External -Inspector) Approved
Aug 12, 2024 11:22 AM CST
Cathrine Westerkamp (External -Engineer) Approved
Aug 12, 2024 11:22 AM CST
David Tingle (Project Manager) Approved
Aug 12, 2024 11:26 AM CST
City Engineer Pending
Director
Admin
Assistant City Manager
City Clerk
Comments
Projec#mates
CITYOFBEAU MONTYROJ ECTMAT ES.0 OM
Change Order #001.003
PW1023-02 - Riverfront Park Restoration, 001 Main Street, Beaumont, Texas 77701 USA
Monday, Aug 12, 2024
Change Order Details Grand Total:
Description COU00f.003: Change Order
Division 01 - General Requirements
Scope of Work This change order is required to make an administrative adjustment to include the RESTORE Council
Financial Assistance Standard Terms and Conditions to the executed contract documents with Callan
Marine. These Terms and Conditions are required to be incorporated Into the Contract Documents as
a condition of receiving grant funding by the Texas Commission on Environmental Quality (TCEQ)
under the RESTORE grant for this project.
Notes Attached are the RESTORE Council Financial Assistance Standard Terns and Conditions that are
now included as a part of the Executed Contract Documents for Construction with Callan Marine.
Awarded to Rick Alexander (Callan Marine Ltd), 29143
Created By David Tingle (City of Beaumont)
Create Date Jul 22, 2024 08:18 AM CST
Reason Code Owner Requested
Days Changed 0
Attachments ach a is For e d ent Not - Blverfront Park Restoration FEMA Uo§499 Contract (1),a
Executed.Riverfront Park Restoration FEMA No6499 Contract with Amend s o pdf
Additional Info
Line Item Type Lump sum
Group 3.0 Construction
Dates
Created On Jul 22, 2024
Capital Planning
Capital Planning Construction - Riverfront Park Restoration
Capital Project Fiscal Year 2024
Accounting
Item Id
575
PO Number
441200
FEMA Number
6499
Accounting Project Code
H13015
Summary
Original Contract Sum
Net Cost by Previous Approved Change Order
Contract Sum Before This Change Order
Contract Sum Changed By This Change Order
New Contract Sum
Substantial Completion Date
Net Time Change By Previous Change Order
Substantial Completion Before This Change Order
Time Changed By This Change Order
New Substantial Completion Date
All Change Orders of the Original Contract
Approval (Approved)
User / Role Status
Chaz Duke (External•GC) Approved
Jul 22, 2024 OBAO AM CST
Cathrine Westerkamp (External• Engineer) Approved
Jul 22, 2024 08:42 AM CST
David Tingle (Project Manager) Approved
Ju 122, 2024 O8:46 AM CST
Amalia "Molly" Villarreal (City Engineer) Approved
Jul 22, 2024 09:54 AM CST
16,879,376.00
159,745.46
17,039,121.46
0.00
17,039,121.46
NIA
12 day(s)
NIA
0 day(s)
N/A
0.9463943453833E3B40729657300%
Comments
User / hole Status
Comments
Bart Bartkowiak (Director) Approved
Jul 22, 2024 01:17 PM CST
Crystal Valencia (Admin) Approved
Jul 22, 2024 02:26 PM Cyr
June Ellis (Assistant City Manager) Approved
Jul 23, 2024 08:32 AM CST
Tina Broussard (City Clerk) Approved
Jul 23, 2024 05:29 PM CST
*1;
Projectmates
CITYUBEAUMONTYROJECTMATES.COM
Change Order #001.002
PW1023-02 - Riverfront Park Restoration, 801 Main Street, Beaurnont, Texas 77701 USA
Monday, ALIg 12, 2024
Change Order Details Grand Total: $0.00
Description
Change Order No, 2: Steel Sheet Pile Anchored Wall Item Breakout (RESTORE Funds and FEMA
Funds)
Division
01 - General Requirements
Notes
This change orderwas required to make an administrative adjustment to separate the single line item
for the Steel Sheet Pile Anchored Walt into two separate line items. The adjustment of the single line
item into two line items will allow the City and grant auditors to track expenses between the two grant
funding sources (TCEQ RESTORE fund and FEMA/Cily funds) for the Steel Sheet Pile Anchored Wall
line item. The City's project management software requires this administrative change to be
processed as a change order.
Awarded to
Rick Alexander (Callan Marine Ltd), 29143
Created By
David Tingle (City of Beaumont)
Create Date
Sep 01, 2023 09:51 AM CST
Reason Code
Owner Requested
Days Changed
0
Additional Info
Line Item Type Lump sum
Group 3.0 Construction
Dates
Created On Sep 01, 2023
Capital Manning
Capital Planning Construction - Riverfront Park Restoration
Capital Project Fiscal Year 2023
Accounting
Item Id
457
PO Number
433176
FEMA Number
6499
Accounting Project Code
F113015
Summary
Original Contract Sum
Net Cost by Previous Approved Change Order
Contract Sum Before This Change Order
Contract Sum Changed By This Change Order
New Contract Sum
Substantial Completion Date
Net Time Change By Previous Change Order
Substantial Completion Before This Change Order
Time Changed By This Change Order
New Substantial Completion Date
All Change Orders of the Original Contract
Line items
Item # Account Code WBS/ Section Description
4 - Steel Sheet Pile Anchored Wall
001 Labor 001
002 Equipment 001
003 Material 001
4 - Steel Sheet Pile Anchored Wall (FEMA & CITY Fu
001 Labor col
002 Equipment 001
Si eel Sheet Pile Anchored Wall - Labor
Steel Sheet Pile Anchored wall - Equipment
Steel Sheet Pile Anchored Wall - Material
Steel Sheet Pile Anchored Wall - Labor (FEMA & CITY Funds)
Steel Sheet Pile Anchored Wall - Equipment (FEMA & CITY Funds)
16,879,376.00
0.00
16,879,376.00
0.00
16,879,376.00
N/A
0 day(s)
NIA
0 day(s)
NIA
0%
Total Amount
-1, 684,205.99
-797,414.55
-5,'198,021.46
455,562.67
229,208.75
Total 0.00
Item # Account Code WBS/ Section
003 Material 001
4 - Steel Sheet Pile Anchored Wall (RESTORE Funds)
001 Labor 001
002 Equipment 002
003 Material 003
Approval (Approved)
User/ Role
Rick Alexander (External -GC)
David Tingle (Project Manager)
Amalia "Molly" Villarreal (City Engineer)
Bart Bartkowiak (Director)
Crystal Valencia (Admin)
June Ellis (Assistant City Manager)
Tina Broussard (City Clerk)
Description
Steel Sheet Pile Anchored Wall - Material (FEMA & CITY Funds)
Steel Sheet Pile Anchored Wall - Labor (RESTORE Funds)
Steel Sheet Plle Anchored Wall - Equlpment (itESTORE Funds)
Steel Sheet Pile Anchored Wall - Material (RESTORE Funds)
Status
Approved
Sep 07, 2023 04:12 PM CST
Approved
Sep 07, 2023 04:13 PM CST
Approved
Sep 07, 2023 05:21 PM CST
Approved
Sep 08, 2023 08:58 AM CST
Approved
Sep 08, 2023 08:59 AM CST
Approved
Sep 08, 2023 09:13 AM CST
Approved
Sep 08, 2023 09:14 AM CST
Total Amount
1,494,770.0
1,128,643.62
568,105.50
3,703,250,813
Total 0.00
Comments
Projectmates
C ITYOFB EAU MO NT.PROJ ECTMATES.CQM
Change Order #001.001
PW1023-02 - Riverfront Park Restoration, 801 Main Street, Beaumont, Texas 77701 USA
Monday, Aug 12, 2024
Change Order Details Grand Total: $159,745.46
Description Change Order No. 1: Concrete/ Brick Debris & Creosote Removal,
Division 35 - Waterway and Marine Construction
Scope of Work This requested change order is necessary to remove and properly dispose of substantial amounts of
unforeseen buried concrete debris, a brick wall structure, and buried creosote pilings. The debris and
pilings were discovered once construction began, despite several surveys to identify any potential
conflicts to the new Improvements, This debris conflicts with placement of both the ACBM mat and the
bulkhead wall on the north end of the Riverfront Park and must be removed and properly disposed of
for construction to continue.
Awarded to Rick Alexander (Callan Marine Ltd), 29143
Created By Rick Alexander (Callan Marine Ltd)
Create Date Aug 18, 2023 02,26 PM CST
Reason Code Unforseen Site Conditions
Days Changed 12
Attachments RES 23-319 Riverfront Park 001.pff
2s dumpsters.pA
Change Order 1 - Concrete Debrs & Creosote Removal,p�f
Cage Order repo s.p-1
Creosote Dumpst_, ers W
Additional Info
Line Item Type Lump sum
Group 3,0 Construction
Dates
Created On Oct 13, 2023
Capital Planning
Capital Planning Construction - Riverfront Park Restoration
Capital Project Fiscal Year
2023
Accounting
Item Id 448
PO Number 433176
FEMA Number 6499
Accounting Project Code H13015
Summary
Original Contract Sum
Net Cost by Previous Approved Change Order
Contract Sum Before This Change Order
Contract Sinn Changed By This Change Order
New Contract Sum
Substantial Completion Date
Net Time Change By Previous Change Order
Substantial Completion Before This Change Order
Time Changed By This Change Order
New Substantial Completion Date
Ali Change Orders of the Original Contract
Line Items
Item # Account Code
Concrete and Brick Debris Removal - Grange Order 1
001 Concrete/ Brick
002 Creosote
WBS/ Section
352023.13
352023,13
16,879,376.00
0.00
16,879,376.00
159,745.46
17,039,121.46
NIA
0 day(s)
NIA
12 day(s)
N/A
0.946394346393383840729667300%
Description
Concrete/ Brick Debris Removal
Creosote Timber Pile Removal
Total Amount
128,214.13
31,531.33
Total 159,745.46
Approval (Approved)
User / Role
Brett Roebuck (External -inspector)
Chris Guy (Inactive) (External -Engineer)
David Tingle (Project Manager)
Amalia "Molly" Villarreal (City Engineer)
Bart Bartkowlak (Director)
Crystal Valencia (Admin)
June Ellis (Assistant City Manager)
Tina Broussard (City Clerk)
Status
Approved
Oct 16, 2023 09:06 AM CST
Approved
Oct 16, 2023 10:58 AM CST
Approved
Oct 16, 2023 11:03 AM CST
Approved
Oct 19, 2023 02:57 PM CST
Approved
Oct 20, 2023 10:30 AM CST
Approved
Nov 01, 2023 08:03 AM CST
Approved
Nov 02, 2023 09:59 AM CST
Approved
Nov 02, 2023 09:59 AM CST
Comments
Approved on 10,31,23 by Res. No. 23-319
Page is too large to OCR.
Page is too large to OCR.
Page is too large to OCR.
Page is too large to OCR.