HomeMy WebLinkAboutRES 24-193RESOLUTION NO.24-193
BE IT RESOLVED BY THE CITY COUNCIL
OF THE CITY OF BEAUMONT:
WHEREAS, on January 23, 2023, by Resolution 23-031, City Council awarded a contract
to Gulf Coast, a CRH Company, of Beaumont, Texas in the amount of $6,079,536.28, for the 4th
Street Roadway Rehabilitation Project; and,
WHEREAS, previous Change Order Nos. 1-4, in the amount of $441,512.61 increased the
contract amount to $6,521,048.89; and,
WHEREAS, proposed Change Order No. 5, in the amount of ($540,930.17), is required to
adjust the estimated quantities in the contract to reflect the actual quantities used to date in the
completion of the project and to account for additional work required by BNSF Railroad for the
pedestrian sidewalk crossing near Wall Street. If approved, Change Order No. 5 will result in a
new contract amount of $5,980,118.72; and,
WHEREAS, A total of thirty (30) additional calendar days will be added to the contract;
NOW, THEREFORE, BE IT RESOLVED BY THE
THAT the statements and findings set out in the preamble to this resolution are hereby, in
all things, approved and adopted; and,
THAT the City Manager be and he is hereby authorized to execute Change Order No. 5 in
the amount of ($540,930.17), for additional work described above, thereby decreasing the total
contract amount to $5,980,118,72 for the 4th Street Roadway Rehabilitation Project.
The meeting at which this resolution was approved was in all things conducted in strict
compliance with the Texas Open Meetings Act, Texas Governinent Code, Chapter 551.
PASSED BY THE CITY COUNCIL of the City of B
2024.
this the 6th day of August,
- Mayor Roy West -
Projectmates
CITYOF13EAUMONT.PROJECTMATES.COM
Change Order #003.005
PW1222-05.4th Street Roadway Rehabilitation, 4th Street, Beaumont, Texas 77705 USA
Thursday, Jul 25, 2024
Change Order Details Grand Total: ($540,930.17)
Description
CO#003.005: Change Order 5
Division
01 - General Requirements
Scope of Work
This Change Order is required to adjust estimated quantities to actual quantities used for this project
and to account for additional work required by BNSF railroad for the pedestrian sidewalk crossing
near Wall Street. 30 calendar days will be added to the project for the additional work required to
construct the pedestrian crossing at the BNSF railroad.
Awarded to
Erik Rodriguez (Gulf Coast a CRH Company), 27695
Created By
David Tingle (City of Beaumont)
Create Date
May 21, 2024 10:47 AM CST
Reason Cade
QuantltyAdjustment
Days Changed
30
Attachments
COO 5.pdf
4th Street Plans - Rev€spd Sheets (Z),, Rj
PMP6 Rev 2Rev 2.p�!f
Additional Info
Line Item Type Unit price
Group 3.0 Consiruction
Dates
Created On May 21, 2024
Capital Planning
Capital Planning Construction - 4th Street Roadway Rehabilitation
Capital Project Fiscal Year 2024
Accounting
Item ld 562
PO Number 441117
Accounting Project Code STASHL
Summary
Original Contract Sum
Net Cost by Previous Approved Change Order
Contract Sum Before This Change Order
Contract gum Changed By This Change Order
New Contract Stem
Substantial Completion Date
Net Time Change By Previous Change Order
Substantial Completion Before This Change Order
Time Changed By This Change Order
New Substantial Completion bate
All Change Orders of the Original Cortract
Line Items
Item Account
WBS/
# Code
Section
Contract Items
104-
001
6001
104-
001
6022
247-
001
6001
340-
001
6001
Description
REMOVING CONCRETE (PAVEMENT)
REMOVING CONCRETE (CURB AND GUTTER)
FLEX BASE (CMP IN PLACE) (TY A GR 2) (0")
D•GR HMA TY-1) PG70-22 (1.50') (WEARING SURFACE)
6,079,536.28
441,512.61
6,521,048,89
-540,930.17
5,980,116.72
NIA
119 day(s)
NIA
30 day(s)
NIA
-1.6352819593668088119378736600%
Quantity UaM unit Total
Price Amount
III. 00 SY 43.00 774.00
-340.50 LF 6.00-2,043.00
-367.13 SY 87.00-31.505,31
-11.42 TON 163.00-1,861.46
Total-540,930.17
Item Account
WBS/
Deserlption
quantity
UoM
Unit
Total
# Code
Section
Price
Amount
341-
001
D-GRHMATY•1)PG70-22(1.75")(WFARINGSURFACE)
-499,64
TON
146.00
-72,947.44
6001
341-
001
D-GR HMA TY-F PG70.22 (1.25") (LEVEL UP)
-2,169.70
TON
161,75
-350,948.96
6004
361-
001
REPAIR CONCRETE PAVEMENT (8")
-301.50
SY
184.00
-55,476.00
6001
465-
001
INLET (COMPL) (INCLUDING BACKFILL) -
1.00
EA
9,500.00
9,500.00
6001
496•
001
REMOVE STR (INLET)
3.00
EA
2,000.00
6,000.00
6002
496•
001
REMOVE STIR (MANHOLE)
-.1,00
EA
2,360.00
-2,360.00
6003
502-
001
BARRICADES, SIGNS & TRAFFIC HANDLING (NOT TO EXCEED
1.00
MON
2,650.00
2,650.00
6001
$5,000 PER MONTH)
529-
001
CONC CURB & GUTTER (TY I)
-206.50
LF
32.00
-6,608.00
6007
530-
001
INTERSECTIONS, DRIVEWAYS, AND TURNOUTS (RCP)
-168.94
TON
219,00
-36,997.86
6011
644-
001
SMALL ROAD SIGN ASSEMBLIES (REMOVE)
2,00
EA
93,50
187,00
6001
644-
001
SMALL ROAD SIGN ASSEMBLIES (INSTALL)
2.00
EA
643.50
1,287.00
60D2
666-
Onl
REFL PAV MRK TY I (WHITE) (G-) (SOLID) (100 MIL) (NO
165.00
LF
032
118,80
60D7
SEALER REQUIRED)
666-
001
REFL PAV MRKTYI (WHITE) (6°) (DOTTED) (100 MIL) (NO
19.00
LF
0.72
13.68
6008
SEALER REQUIRED)
666-
001
REFL PAV MRKTY I (WHITE) (12") (SOLID) (100 MIL) (NO
43.00
LF
2.86
122.98
6012
SEALER REQUIRED)
713-
001
CLEANING AND SEALING JOINTS AND CRACKS
.2,936.00
LF
3.35
-9,835.60
6005
999-
001
EXPLORATORY EXCAVATION, INCLUDING REMOVAL OF CSS
1,00
LS
9,000.D0
9,cd00.00
6002
FROM AROUND EXISTING WATER LINES (ROCKWELL AND
4TH)
Total-540,930.17
Approval (Pending)
User / Role Status
Erik Rodriguez (External -GC) Approved
Jul 23, 2024 03:20 PM CST
David Tingle (Project Manager) Approved
Jul 24, 2024 08:17 AM CST
Amalla "Molly' Villarreal (City Engineer) Approved
Jul 24, 2024 03:22 PM CST
Hart Bartkowiak (Director) Approved
Jul 24, 2024 03:29 PM CST
Admin Pending
Assistant City Manager
City Clerk
Due Date: Jul 31, 2024
Comments
Page is too large to OCR.
Page is too large to OCR.
Page is too large to OCR.
Page is too large to OCR.