HomeMy WebLinkAboutRES 24-131-ARESOLUTION NO. 24-131-A
BE IT RESOLVED BY THE CITY COUNCIL
WHEREAS, on November 7, 2023, by Resolution No. 23-338, the City Council awarded
a contract to ALLCO, LLC, of Beaumont, Texas, in the amount of $6,847,514.00, for the Street
Rehabilitation Citywide Phase V (REBID) Project original base iterns only; and,
WHEREAS, the award amount did not include the original additive bids items for the
rehabilitation of the Wastewater Treatment Plant Roadway, of $1,026,822.00, as Rinding was not
available at the time of the award; and,
WHEREAS, on May 21, 2024, funding became available and Council approved Change
Order No. 3 in Resolution 24-131, for the addition of the original additive bid items for the
rehabilitation of the Wastewater Treatment Plant Roadway in the amount of $1,026,822.00, to
the Street Rehabilitation Citywide -- Phase V (REBID) Project; and,
WHEREAS, Change Order No. 3, increased the contract amount to $8,498,661.75, which
includes Change Orders No. 1-2 in the amount of $624,325.75;
WHEREAS, staff requests that Council approve the amendment to Resolution 24-131 to
accept and reward the original additive items as a new stand-alone contract to allow for
additional work if needed;
NOW, THEREFORE, BE IT RESOLVED BY THE
CITY COUNCIL OF THE CITY OF BEAUMONT:
THAT the statements and findings set out in the preamble to this resolution are Hereby, in
all things, approved and adopted; and,
THAT the City Manager be and he is hereby authorized approve the amendment to
Resolution 24-131 to accept and award the original additive items for the Street Rehabilitation
Citywide Phase V (REBID) Project.
The meeting at which this resolution was approved was in all things conducted in strict
compliance with the Texas Open Meetings Act, Texas Goverim-lent Code, Chapter 551.
2024.
PASSED BY THE CITY COUNCIL of the City of Begumont this the 30th day of July,
- Mayor Roy West -
RXSOLUTION NO. 24.131.
BE IT 1\_P SOLV D B I THE l Yf 1 COUNCIL
OF THE CITY OF BEAUMONT:
WHEREAS, on November 7, 2023, the City Council of the City of Beaumont, Texas
Massed Resohtt:ion No. 23-338 awarding a contract in the amount of $6,847,514.00 to ALLCO,
LLC, of Beaumont, Texas, for the Street Rehabilitation Citywide -Phase V (RE13ID) Project,
and,
WHEREAS, previous Change Orders Nos. 1-2, in the anjowit of $624,325.75 increased
the contract amount to $7,4715839.75; and,
WHEREAS, Change Order No. 3, in the amount of $1,026,822,00, is needed for the
rehabilitation of the roads at the Wastewater Treatment Plaut that were, originally bid as additive
bid items; thereby increasing the total contract an-zount to $8,498,661,75,
NOW, THEREFORE, BE IT RESOLVED BY THE
CITY COUNCIL OF THE CITY OF BEAUMONT:
THAT the statements and findings set out in the preamble to this resolution are hereby, itr all
things, approved and adopted; and,
THAT the City Manager be and he is hereby authorized to execute Change Order No. 3
in the animmt of $1,026,822.00 for additional work described above, thereby increasing the total
contract amount to $8,498,661,75 for the Street Rehabilitation Citywide -Phase V (REBID)
Projcct>
The meeting at which this resolution was approved was in all things conducted in strict
compliance witli the Texas Open Meetings Aet, Texas Govertiment Code, Chapter 551.
2024.
PASSED BY THE CITY COUNCIL of the City of Deaummit thus the 21st day of May,
nyox Roy )Pest -
Pro jectmates
CITYOFBEAU MONT.PROJECTMATES.COM
Change Order #001.003
PWO823-12 - Street Rehabilitation Citywide Phase V (REBID), 801 plain Street, Reamont, TX
77701 United States
Change Order Details
Description
Division
Tuesday, Jun 11, 2024
Change Order No.3: WWTP
01 - General Requirements
Grand Total:
$1,026,822.00
Scope of Work The costs for the rehabilitation of the roads at the Wastewater
Treatment Plant were bid as additive bid items. Additive bid items are
not part of the original scope of work, they are optional and can he
added later if the budget allows. This proposed Change Order will add
these items to the contract at the prices received at the time of bidding.
Awarded to Brandon Harrison (Allco, LLC), 6354
Created By .Julie Hammond (City of Beaumont)
Create Date May 08, 2024 02:15 PM CST
Reason Code Owner Requested
Days Changed 60
Attachments RE;S 24-131 Street Rehab Ph 5 CO3.pddf,
Additional Info
Line Item Type Unit price
Group 3.0 Construction
Dates
Created On
Org. Sub. Completion
Capital Planning
May 08, 2024
Jan 06, 2025
Capital Planning Construction - Street Rehabilitation Phase V (REBID)
Capital Project Fiscal 2024
Year
Accounting
Item Id 555
Summary
Original Contract Sum
6,847,514.00
Net Cost by Previous Approved Change Order
624,325.75
Contract Sum Before This Change Order
7,471,839.75
Contract Sum Changed By This Change Order
1,026,822.00
New Contract Sum
8,498,661.75
Substantial Completion Date
Jan 06, 2025
Net Time Change By Previous Change Order
150 day(s)
Substantial Completion Before This Change
Jun 05, 2025
Order
Time Changed By This Change Order
New Substantial Completion Date
All Change Orders of the Original Contract
Line Items
Item Account WBS/ Description
# Code Section
Contract Items
60 day(s)
Aug 04, 2025
24.113097833753972609621535640%
Quantity UoM Unit Total
Price Amount
100
6002
999
PREP ROW (NOT TO
79.00
STA
290,00
22,910.00
EXCEED $300 PER
STATION) WWTP
247
6002
999
FLEX BASE (CMP IN
1,152.00
SY
44.00
50,688.00
PLACE) (TY A GR 2)
(6") WWTP
275
6013
999
CEMENTTRT(MIX
1,747.00
SY
25.00
43,675.00
EXISTING MATERIAL)
(B..) WWTP
340
6002
999
D-GR HMA TY-D
1,108.00
TON
201.00
222,708,00
PG70-22 (1.5")
(LEVEL -UP) WWTP
340
6005
999
D-GR HMA TY-F
1,075.00
TON
206.00
221,450.00
PG70-22 (1.25")
(WEARING SURFACE)
WWTP
351
6002
999
REPAIR OF FLEXIBLE
192.00
SY
138.50
26,592.00
PAVEMENT (8") (ASB
Total 1,026,822.00
Item
Account
WBS/
Description
Quantity
UoM
Unit
Total
#
Code
Section
Price
Amount
PG 64-22) WWTP
354
6096
999
PLANE ASPH CONC
10,712.00
SY
6.25
66,950.00
PAV (1" TO 3") WWTP
361
6002
999
REPAIR CONCRETE
1,152.00
SY
167.25
192,672.00
PAVEMENT (6")
WWTP
500
6002
999
MOBILIZATION (NOT
1.00
LS
44,000.25
44,000.25
TO EXCEED 5%)
WWTP
502
6001
999
BARRICADES, SIGNS
3.00
MON
1,500.00
4,500.00
& TRAFFIC
HANDLING WWTP
530
6012
999
INTERSECTIONS,
226,00
TON
297.00
67,122.00
DRIVEWAYS, AND
TURNOUTS (ACP)
WWTP
666
6005
999
REFL PAV MRK TY 1
140.00
LF
8.95
1,253.00
(WHITE) (4") (SOLID)
(100 MIL) (NO
SEALER REQUIRED)
WWTP
713
6006
999
CLEANING AND
11,867.00
LF
5.25
62,301.75
SEALING JOINTS
AND CRACKS WWTP
Total 1, 026, 822.00
Approval (Approved)
User / Role Status Comments
Brandon Harrison (External- Approved
GC) May 13, 2024 09:16
AM CST
David Tingle (Project Approved
Manager) May 13, 2024 09:17
AM CST
Amalia "Molly" Villarreal Approved
(City Engineer) May 13, 2024 09:22
AM CST
Bart Bartkowiak (Director) Approved
May 13, 202411:30
AM CST
Crystal Valencia (Admin) Approved Accepted by City Council on May 21, 2024, by
May 22, 2024 07:55 Resolution No. 24-131.
AM CST
June Ellis (Assistant City
Manager)
Tina Broussard (City Clerk)
Approved
May 22, 202412:14
PM CST
Approved
May 22, 202412:20
PM CST
Projectmates
CITYOFBEAUMONT. PROJECTMATES.COM
Change Order #001.002
C WO823-12 - street Rehabilitation Citywide Phase V (REBID), 801 Main street, Beaumont, TX
Change Order Details
Description
Division
77701 United states
Monday, May 13, 2024
Change Order No. 2
01 - General Requirements
Grand Total:
$473,489.00
Scope of Work
Angelina Street: Items to remove and replace damaged and collapsed
storm sewer infrastructure discovered at three different intersections
after construction commenced. CC&G point repairs to realign gutterlines
on Angelina Street for conveyance of stormwater runoff. Zavalla Drive:
Items for point repairs to remove and replace broken pin -on curb on
Zavalla Drive. Rusk Street: A change in curb inlet type from a standard
curb inlet to a Type R curb inlet is needed after an existing grate inlet
was removed and roots were discovered from a nearby oak tree that
presented difficulties in relocating the inlet to the back of the curb. Also,
an additional 33-sy for Item 361- Repair Concrete Pavement (6") is
needed for the repairs at the intersection of Rusk & 6th (scoped out in
C.O11) as the paving area was adjusted 4-ft to the east due to a crack
in the existing concrete pavement and also due to actual field
measurements. The contractor is requesting an additional 90 calendar
days for the additional work to be performed on Angelina Street and
Zavalla Drive. No additional calendar days will be required for the
change in inlet type and additional concrete repair for Rusk Street.
Notes
See attachments. '2024.03.05_RDT102-106 repair details' attachment
for reference.
Awarded to
Brandon Harrison (Allco, LLC), 6854
Created By
Julie Hammond (City of Beaumont)
Create Date
Apr 18, 2024 W09 AM CST
Reason Code
Unforseen Site Conditions
Days Changed
90
Attachments RES 24-121.pdf
2024.04.23 Angelina CC&G, Pavement & Drainage Repairs
2024.03.05 RDT102-106 repair deiails.pcif
Additional Info
Line Item Type Unit price
Group 3.0 Construction
Dates
Created On Apr 1 B, 2024
Org. Sub. Completion Jan 06, 2025
Capital Planning
Capital Planning Construction - Street Rehabilitation Phase V (REBID)
Capital Project Fiscal 2024
Year
Accounting
Item ld 547
PO Number 442308
Summary
Original Contract Sum
Net Cost by Previous Approved Change Order
Contract Sum Before This Change Order
Contract Sum Changed By This Change Order
New Contract Sum
Substantial Completion Date
Net Time Change By Previous Change Order
Substantial Completion Before This Change
Order
Time Changed By This Change Order
New Substantial Completion Date
All Change Orders of the Original Contract
Line Items
Item
Account
WBS/
#
Code
Section
Contract Items
104
6021
100
104
6022
100
247
6001
200
Description
6,847,514.00
150,836,75
6,998,350.75
473,489.00
7,471,839,75
Jan 06, 2025
60 day(s)
Mar 07, 2025
90 day(s)
Jun 05, 2025
9,117553465389044841675387590%
Quantity UoM Unit
Price
REMOVING 394.00 LF
CONCRETE (CURB)
REMOVING 174.00 LF
CONCRETE (CURB &
GUTTER)
FLEX BASE (CMP IN 1,057.00 SY
PLACE) (TY A GR 2)
3.00
Total
Amount
3,152.00
19.00 3,306,00
40.00 42,280.00
Total 473,489.00
Item
Account
WBS/
Description
Quantity
UoM
Unit
Total
#
Code
Section
Price
Amount
(B,)
361
6001
300
REPAIR CONCRETE
1,038.00
SY
180.00
186,840.00
PAVEMENT (6")
400
6002
400
CEMENT STABILIZED
126.00
CY
114.00
14,364.00
BACKFILL (2SK/CY
SAND)
4122
9999
4000
HP STORM PIPE (15")
239.00
LF
189.00
45,171.00
(INCLUDES REMOVAL
OF EXISTING PIPE)
465
6001
400
CURB INLET (COMPL)
5.00
EA
7,778.00
38,890.00
465
6003
400
CURB INLET (TYPE R)
5.00
EA
8,170.00
40,850.00
(COMPL)
465
6002
400
MANHOLE (COMPL)
3.00
EA
10,736.00
32,208.00
496
6002
400
REMOVE STR (INLET)
10.00
EA
1,494.00
14,940.00
496
6003
400
REMOVE STR
3,00
EA
2,626,00
7,878.00
(MANHOLE)
502
6001
500
BARRICADES, SIGNS &
3.00
MON
5,000.00
15,000.00
TRAFFIC HANDLING
(NOT TO EXCEED
$5,000 PER MONTH)
529
6002
500
CONC CURB (TY II)
344.00
LF
25.00
8,600.00
529
6008
500
CONC CURB &
174.00
LF
115.00
20,010.00
GUTTER (TY II)
(INCLUDES 6" FLEX
BASE)
Total 473,489.00
Approval (Approved)
User / Role Status Comments
Brandon Harrison (External- Approved
GC) Apr 24, 2024 01:19
PM CST
David Tingle (Project Approved
Manager) Apr 24, 2024 02:02
PM CST
Arnalia "Molly" Villarreal Approved
(City Engineer) Apr 25, 2024 05:30
PM CST
Bart Bartkowiak (Director) Approved
Apr 29, 2024 04:32
PM CST
Crystal Valencia (Admin) Approved Approved by City Council on May 7, 2024, by
May 07, 2024 05:25 Resolution No. 24-121.
PM CST
June Ellis (Assistant City
Manager)
Tina Broussard (City Clerk)
Approved
May 08, 2024 09:30
AM CST
Approved
May 08, 2024 09:50
AM CST
Nrn-jeCtmates
CITYOFBEAUMONT.PROJECTMATES_COM
Change Order #001.001
PWO823-12 - Street Rehabilitation Citywide Phase V (REBID), 801 Main Street, Beaumont, TX
77701 United States
Change Order Details
Description
Division
Monday, May 13, 2024
CC#1`001.001: 001
01 - General Requirements
Grand Total:
$150,836.75
Scope of Work Rusk Street: Items to remove and replace damaged or collapsed parts
of storm sewer infrastructure discovered after construction commenced.
CC&G point repairs to realign gutteriines on Rusk Street for conveyance
of stormwater runoff. The contractor is requesting an additional 60
calendar days for delays and the additional work to be performed on
Rusk Street. Masterson Drive & Potter Drive: Change in scope of work
for Masterson and Potter from mill & ASB repairs to mixing the existing
base with cement slurry. No additional calendar days will be required for
the change in scope of work to be performed on Masterson Drive and
Potter Drive.
Awarded to Brandon Harrison (Allco, LLC), 6064
Created By ,Julie Hammond (City of Beaumont)
Create Date Mar 08, 2024 03:36 PM CST
Reason Code Unforseen Site Conditions
Days Changed 60
Attachments 2024.03.12 Rusk CC&G Repairs.pdf
RES 24-094 Street Rehab Phase V.pdf
2024.03.11 Rusk Pavement & Drainage Repairs.pdf
Additional Info
Line Item Type Unit price
Group 3.0 Construction
Dates
Created On Mar 0€3, 2024
Org. Sub. Completion Jan 06, 2025
Capital Planning
Capital Planning Construction - Street Rehabilitation Phase V (REBID)
Capital Project Fiscal 2024
Year
Accounting
Item Id 524
PO Number 442390
Summary
Original Contract Sum
Net Cost by Previous Approved Change Order
Contract Sum Before This Change Order
Contract Sum Changed By This Change Order
New Contract Sum
6,847,514.00
0.00
6,847,514.00
150,836,75
6,998,350.75
Substantial Completion Date
Net Time Change By Previous Change Order
Substantial Completion Before This Change
Order
Time Changed By This Change Order
New Substantial Completion Date
All Change Orders of the Original Contract
Line Items
Jan 06, 2025
0 day(s)
Jan 06, 2025
60 day(s)
Mar 07, 2025
2.2027957883693264446045674400%
Item
Account
WBS/
Description
Quantity
UoM
Unit
Total
#
Code
Section
Price
Amount
Contract Items
104
6021
100
REMOVING
98.00
LF
8.00
784.00
CONCRETE (CURB)
104
6015
100
REMOVING
20.00
SY
80.00
1,600.00
CONCRETE
(SIDEWALKS)
104
6022
100
REMOVING
481.00
LF
19.00
9,139.00
CONCRETE (CURB &
GUTTER)
247
6001
200
FLEX BASE (CMP IN
316.00
SY
40.00
12,640.00
PLACE) (TY A GR 2)
(B„)
275
6012
200
CEMENT TRT (MIX
5,531.00
SY
15.50
85,730.50
EXISTING MATERIAL)
Total 150,836.75
Item
Account
WBS/
Description
Quantity
UoM
Unit
Total
#
Code
Section
Price
Amount
(13" TO 10")
351
6001
300
REPAIR OF FLEXIBLE
-1,235.00
SY
90.00
-111,150.00
PAVEMENT (8" ASB)
354
6096
300
PLANE ASPH CONC
-4,939.00
SY
5,25
-25,929.75
PAV (1 " TO 3")
361
6001
300
REPAIR CONCRETE
316.00
SY
180.00
56,880.00
PAVEMENT (6")
401
6001
400
FLOWABLE BACKFILL
23.00
CY
408.00
9,384.00
4122
9999
4000
HP STORM PIPE (15")
48.00
LF
189.00
9,072.00
(INCLUDES REMOVAL
OF EXISTING PIPE)
465
6001
400
CURB INLET (CO MPL)
5.00
EA
7,778.00
33,£390.00
465
6002
400
MANHOLE (COMPL)
1.00
EA
10,736.00
10,736.00
496
6002
400
REMOVE STR (INLET)
5.00
EA
1,494.00
7,470.00
496
6003
400
REMOVE STR
1.00
EA
2,626.00
2,626.00
(MANHOLE)
502
6001
500
BARRICADES, SIGNS &
2.00
MON
5,000.00
10,000.00
TRAFFIC HANDLING
(NOT TO EXCEED
$5,000 PER MONTH)
529
6002
500
CONC CURB (TY II)
98.00
LF
25,00
2,450,00
529
6003
500
CONC CURB &
481.00
LF
115.00
55,315.00
GUTTER (TY II)
Total 150,836.75
Item Account WBS/ Description Quantity UoM Unit Total
# Code Section Price Amount
531 6001 500
713 6005 700
Approval (Approved)
(INCLUDES 6" FLEX
BASE)
CONC SIDEWALKS (4") 20.00 SY
CLEANING AND-6,000.00 LF
SEALING JOINTS AND
CRACKS
User / Role Status
Brandon Harrison (External- Approved
GC) Mar 12, 2024 03:44
PM CST
David Tingle (Project
Manager)
Arnalia "Molly" Villarreal
(City Engineer)
Approved
Mar 12, 2024 03:56
PM CST
Approved
Mar 12, 2024 04:01
PM CST
Bart Bartkowiak (Director) Approved
Mar 12, 2024 05:03
PM CST
Comments
230.00
4.90
4,600.00
-29,400.00
Total 150,836.75
User / Role Status
Comments
Crystal Valencia (Admin) Approved
Apr 17, 2024 08:53
AM CST
June Ellis (Assistant City Approved
Manager) Apr 17, 2024 04:11
PM CST
Tina Broussard (City Clerk) Approved
Apr 17, 2024 04:25
PM CST
Approved by City Council on April 1 G, 2024,
by Resolution No. 24-094.