Loading...
HomeMy WebLinkAboutRES 24-141RESOLUTION NO. 24-141 BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF BEAUMONT: WHEREAS, on December 19, 2023, by Resolution 23-391, City Council awarded a contract to Aranda Industries, LLC, of Houston, Texas, in the amount of $93,000.00, for the Caldwood Area Storm Sewer Point Repairs (REBID) Project; and, WHEREAS, Change Orders Nos. 1-2, in the amount of $8,983.00, increased the contract amount to $101,983.00; and, WHEREAS, proposed final Change Order No. 3, in the amount of $5,000.00, is needed to adjust the estimated quantities in the contract to reflect the actual quantities used in the completion of the project, if approved, the quantities would result in a final contract amount of $106,983.00; and, WHEREAS, the project has been inspected by the Engineering Division and found to be complete in accordance with the provisions and terms set forth in the contract; NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF BEAUMONT: THAT the statements and findings set out in the preamble to this resolution are hereby, in all things, approved and adopted; and, THAT the City Manager be and he is hereby authorized to execute Change Order No. 3, in the amount of $5,000.00 for the work described above, thereby increasing the total contract amount to $106,983.00 for the Caldwood Area Storm Sewer Point Repairs (REBID) Project; and, BE IT FURTIIER RESOLVED THAT the Caldwood Area Storm Sewer Point Repairs (REBID) Project be and the same is hereby accepted; and, BE IT ALSO RESOLVED THAT the City Manager is hereby authorized to make final payment in the amount of $11,490.90 to Aranda Industries, LLC of Houston, Texas. The meeting at which this resolution was approved was in all things conducted in strict compliance with the Texas Open Meetings Act, Texas Government Code, Chapter 551. 2024. PASSED BY THE CITY COUNCIL of the City of Beaumont this the 4th day of June, - Mayor Roy West - Prajectmates Change Order Details Description Division Scope of Work Awarded to Created By Create Date Reason Code Days Changed Additional Info CITYOFBEAUMONT.PROJECTMATES.COM Grand Total: $5,000.00 CO#001.003,. INAL 01 - General Requirements This is the final Change Order to adjust estimated quantities actually used on the project. Change Order No. 1 included a time extension of 30 calendar days for additional work but no additional month was added at that time for Traffic Control and Barricading. Gerardo Aranda (Aranda Industries, LLC), 29499 David Tingle (City of Beaumont) May 20, 2024 08:40 AM CST Quantity Adjustment C Unit price 3.0 Construction Dates Created On May 20, 2024 Org. Sub. Completion Mar 22, 2024 Capital Planning Capital Planning Construction - Caldwood Area Storm Sewer Point Repairs Capital Project Fiscal 2024 Year Accounting Item Id 558 Summary Original Contract Sum 93,000.00 Net Cost by Previous Approved Change Order 8,983.00 Contract Sum Before This Change Order 101,983,00 Contract Sum Changed By This Change Order 5,000.00 New Contract Sum 106,983.00 Substantial Completion Date Mar 22, 2024 Net Time Change By Previous Change Order 44 day(s) Substantial Completion Before This Change May 05, 2024 Order Time Changed By This Change Order 0 day(s) New Substantial Completion Date All Change Orders of the Original Contract Line Items Item Account WBS/ Description 4 Code Section Contract Items 006 001 001 BARRICADES, SIGNS 1.00 AND TRAFFIC HANDLING Approval (Approved) User / Role Gerardo Aranda (External -GC) David Tingle (Project Manager) Amalia "Molly" Villarreal (City Engineer) Bart Bartkowiak (Director) Status May 05, 2024 15.035483870967741935483870970% Quantity UoM Unit Total Price Amount M0 5,000.00 5,000.00 Approved May 23, 2024 09:32 AM CST Approved May 23, 2024 09:57 AM CST Approved May 23, 2024 05:33 PM CST Approved May 24, 2024 08:31 AM CST Total 5,000.00 Comments User 1 Role Crystal Valencia (Admin) Status Approved May 24, 202412:14 PM CST Comments Pro1 ectmates Change Order Details Description Division Scope of Work Awarded to Created By Create Date Reason Code Days Changed Additional Info Line Item Type Group CITYOFBEAU MONT.PROJECT MATES. COM Grand Total: CO#001.002: Change Order 2 01 - General Requirements Previous Change Order 1 increased the time in the contract by 30 calendar days due to an increase in the requested work. This proposed Change Order 2 will increase the contract amount by 14 days due to inclement weather days encountered from February 7 - April 17. The contract completion date will be extended to May 5, 2024. Gerardo Aranda (Aranda Industries, LLC), 29499 David Tingle (City of Beaumont) Apr 17, 2024 10:34 AM CST Time Extension 14 Unit price 3,0 Construction Dates Created On Apr 17, 2024 Org. Sub. Completion Mar 22, 2024 Capital Planning Capital Planning Construction - Caldwood Area Storm Sewer Point Repairs Capital Project Fiscal 2024 Year Accounting Item Id 545 Summary Original Contract Sum 93,000.00 Net Cost by Previous Approved Change Order 8,983.00 Contract Sum Before This Change Order 101,983.00 Contract Sum Changed By This Change Order 0.00 New Contract Sum 101,983.00 Substantial Completion Date Mar 22, 2024 Net Time Change By Previous Change Order 30 day(s) Substantial Completion Before This Change Apr 21, 2024 Order Time Changed By This Change Order 14 day(s) New Substantial Completion Date All Change Orders of the Original Contract Approval (Approved) User I Role Gerardo Aranda (External -GC) David Tingle (Project Manager) Amalla "Molly" Villarreal (City Engineer) Bart Bartkowiak (Director) Crystal Valencia (Admin) June Ellis (Assistant City Manager) Tina Broussard (City Clerk) May 05, 2024 9.659139784946236559139784950% Status Approved Apr 23, 2024 08:51 AM CST Approved Apr 23, 2024 08:51 AM CST Approved Apr 24, 202410:42 AM CST Approved Apr 24, 202410:53 AM CST Approved Apr 25, 2024 08:50 AM CST Approved Apr 25, 2024 03:40 PM CST Approved Apr 25, 2024 03:50 PM CST Comments Projectmates CITYOFBEAUMONT.PROJECTMATES.COM Change Order #001.001 PW1124-02 - Caldwood Area Storm Sewer Point Repairs, 801 main street, Beaumont, Texas 77701 USA Friday, May 24, 2024 Change Order Details Description Division Scope of Work Additional Info Grand Total: $87983.00 CO#001.001: Change Order 1 01 - General Requirements This Change Order is required to remove and replace a damaged reducer fitting on the sanitary sewer line on Caldwood Drive that is cracked and damaged, remove an manhole that was previously abandoned and left underground, and to remove existing ductile iron pipe encasing the sanitary sewer line on Cross Drive and replace it with a split steel casing. This additional work for the sanitary sewer lines was discovered after the contractor started exploratory digging at the locations of the two proposed conflict boxes. Thirty (30) additional calendar days are being added to the project for this additional work. The original completion date of March 22, 2024 will be extended until April 21, 2024. Gerardo Aranda (Aranda Industries, LLC), 29499 David Tingle (City of Beaumont) Mar 07, 2024 03:06 PM CST Owner Requested 30 20240307134244665. pdf UPDATED RFI CHANGE ORDER(!)�pdF Line Item Type Unit price Group 3,0 Construction Dates Created On Mar 07, 2024 Org. Sub. Completion Mar 22, 2024 Capital Planning Capital Planning Construction - Caldwood Area Storm Sewer Point Repairs Capital Project Fiscal 2024 Year Accounting Item Id 522 Summary Original Contract Sum 93,000.00 Net Cost by Previous Approved Change Order 0.00 Contract Sum Before This Change Order 93,000.00 Contract Sum Changed By This Change Order 8,983.00 New Contract Sum 101,983.00 Substantial Completion Date Mar 22, 2024 Net Time Change By Previous Change Order Substantial Completion Before This Change Order Time Changed By This Change Order New Substantial Completion Date All Change Orders of the Original Contract Line Items Item Account WBS/ Description # Code Section Contract Items 0 day(s) Mar 22, 2024 30 day(s) Apr 21, 2024 9.659139784946236559139784950% Quantity UoM Unit Total Price Amount 007 001 001 REPLACEMENT OF EXIST. 1.00 10"X8" REDUCER WITH FERNCO REDUCER INCLUDES ALL BEDDING AND BACKFILL 008 001 001 REMOVING MANHOLE (COMPL) 009 001 001 INSTALL SPLIT STEEL CASING ON SANITARY SEWER LINE AT LOCATION OF PROPOSED CONFLICT BOX ON CROSS DR 1.00 1.00 EA 1,083.00 1,083.00 EA 1,400.00 1,400.00 FA 6,500.00 6,500,00 Total 8,983.00 User / Role Gerardo Aranda (External -GC) David Tingle (Project Manager) Arnalia "Molly" Villarreal (City Engineer) Bart Bartkowiak (Director) Crystal Valencia (Admin) June Ellis (Assistant City Manager) Tina Broussard (City Clerk) Status Approved Mar 07, 2024 06:11 PM CST Approved Mar 08, 2024 09:28 AM CST Approved Mar 08, 2024 09:36 AM CST Approved Mar 08, 2024 09:43 AM CST Approved Mar 08, 2024 02:53 PM CST Approved Mar 08, 2024 03:32 PM CST Approved Mar 08, 2024 04:03 PM CST Comments Projectmates C ITYO F B E AUMO N T. PROJ ECT MATES. COM Invoice #001.004 - Final for Invoices/Pay Apps PW1124-02 - Caldwood Area Storm Sewer Point Repairs, 801 main street, Beaumont, Texas 77701 USA Friday, May 24, 2024 Invoice Details Amount Due: 11,490.90 Contract Contract - 001 Caldwood Area Storm Sewer Point Repairs (REBID) Invoice # 001.004 - Final Description Aranda Industries, LLC - Caldwood Area Storm Sewer Point Repairs (REBID) Invoice Date May 24, 2024 Pay Period May 01, 2024 to May 24, 2024 Final Invoice Yes Grand Total $6,465.00 Payment To Gerardo Aranda 29499 (Aranda Industries, LLC) Created By David Tingle (City of Beaumont) Create Date May 24, 2024 01:09 PM CST Invoice ID 1113 Retainage Work Completed % 5.00 Materials Stared % 5.00 Line Items Item Account WBS/ Description Contract Previous Quantity UoM Unit Work Materials Total # Code Section Total Payments Price Completed Storer) Amount (WC) (MS) CO#001.001: Change Order 1 - Contract Items 007 001 001 REPLACEMENT 1.00 @ 1,083.00 0.00 EA 1,083.00 0.00 0.00 1,063.00 OF EXIST. 1,083.00 = 10"Xa° 1,083.00 Grand Total 106,983.00 Item Account WBS/ Description Contract Previous Quantity UoM Unit Worst Materials Total # Code Section Total Payments Price Completed Stored Amount (WC) (MS) REDUCER WITH FERNCO REDUCER INCLUDES ALL BEDDING AND SACKFILL 00$ 001 001 REMOVING 1.00 @ 1.400.00 0.00 EA 1,400.00 0.00 0.00 1,400.00 MANHOLE 1,400.00 = (COMPL) 1,400.00 009 001 001 INSTALL SPLIT 1.00 @ 6,500.00 0.00 EA 6,500.00 0.00 0.00 U00.00 STEEL CASING 6,500.00 = ON SANITARY 6,500.00 SEWER LINE AT LOCATION OF PROPOSED CONFLICT BOX ON CROSS OR CC#001.003:FINAL - Contract Items 006 001 001 BARRICADES, 1.00 @ 0,00 0.00 MO 5,000.00 5,000.00 0.00 5.000.00 SIGNS AND 5,000.00 = TRAFFIC 5,000.00 HANDLING Contract Items 001 001 001 BLOCK 40,00@ 0,00 0.00 Sy 25.00 1,000.00 0.00 1,000.00 SODDING 25,00= 1,000,00 002 001 001 JUNCTION 1,00 @ 37,350.00 0.00 EA 37,350,00 000 0.00 37,350.00 BOX (8'X5'X8' 37,350,00 CONFLICT = BOX) (WITH 37,350.00 MANHOLE i ACCESS) 003 001 001 JUNCTION 1,00@ 40,000.00 0,00 EA 40,000,00 0.00 0.00 40,000.00 BOX 40,000.00 (8'X6'X10.5' _ CONFLICT 40,000.00 BOX) (WITH MANHOLE ACCESS) 004 001 001 REMOVE STR 1.00 @ 2,500.00 0.00 EA 2,500.00 0.00 0.00 2,500.00 (JB WITH 2,500.00 = 2,500.00 Grand Total 106,983.00 Item Account WBS/ Description Contract Previous Quantity UoM Unit Work Materials Total # Code Section Total Payments Price Completed Stored Amount (WC) (MS) MANHOLE ACCESS) 005 001 001 MOBILIZATION 1.0D @ 4,185.00 0,00 LS 4,650,00 465,00 0,00 4,650,00 (NOTTO 4,650.00= EKCE_ED 5%) 4,650.00 006 001 001 BARRICADES, 1.50 @ 7,500.00 0.00 MO 5,000.00 0.00 0.00 7,500.00 SIGNS AND 5,000.00 = TRAFFIC 7,600.00 HANDLING Grand Total 106,983.00 Summary 1. Contract Sum + Amendments 2, New Change by Change Request 3, Contract Sum To Data (Line 1 + Line 2) 4, Total Completed & Stored To Date 5, Retainage 5a. 5.00% of Completed Work (Column I on Continuation Sheet) 5b. 5.00% of Stored Material (Column J on Continuation Sheet) Total Retainage (5a + 5b) 6. Total Earned Less Total Retainage 7. Less Previous Certificates for Payment 8. Current Amount Rue 9. Balance to Finish, Including Retainage (Line 3 less Line 6) Additional Info Line Item Type Unit price Group 3.0 Construction Accounting and Status 0.00 0.00 93,000.00 13,983.00 106,983.00 106,983.00 Capital Funding Source Construction - Caldwood Area Storm Sewer Point Repairs Capital Project Fiscal Year Approval (Pending) User i Role Gerardo Aranda (External -GC) David Tingle (Project Manager) City Engineer Director Admin 2024 Status Approved May 24, 2024 01:58 PM CST Approved May 24, 2024 02:30 PM CST Pending Due Date: May 31, 2024 Comments