HomeMy WebLinkAboutRES 24-139RESOLUTION NO. 24-139
BE IT RESOLVED BY THE CITY COUNCIL
OF THE CITY OF BEAUMONT:
WHEREAS, on April 18, 2023, by Resolution 23-104, City Council awarded a contract
to Viking Painting, LLC, of La Vista, Nebraska, in the amount of $1,348,440.00, for the
Southwest Elevated Storage Tank Rehabilitation Project; and,
WHEREAS, Change Orders Nos. 1-2, had no impact on the contract amount; and,
WHEREAS, proposed final Change Order No. 3, in the amount of ($14,545.20), is
deeded to adjust the estimated quantities in the contract to reflect the actual quantities used and
the addition of 57 calendar days to reflect the actual time used in the competition of the project,
if approved, the quantities would result in a final contract amount of $1,333,894,80; and,
WHEREAS, the project has been inspected by the Water Utilities Staff and found to be
complete in accordance with the provisions and terms set forth in the contract;
NOW, THEREFORE, BE IT RESOLVED BY THE
CITY COUNCIL OF THE CITY OF BEAUMONT:
THAT the statements and findings set out in the preamble to this resolution are hereby, in
all things, approved and adopted; and,
THAT the City Manager be and he is hereby authorized to execute Change Order No. 3,
in the amount of ($14,545.20) for the work described above, thereby decreasing the total contract
amount to $1,333,894.80 for the Southwest Elevated Storage Tank Rehabilitation Project; and,
BE IT FURTHER RESOLVED THAT the Southwest Elevated Storage Tank
Rehabilitation Project be and the same is hereby accepted; and,
BE IT ALSO RESOLVED THAT the City Manager is hereby authorized to make final
payment in the amount of $61,922.70 to Viking Painting, LLC, of La Vista, Nebraska.
The meeting at which this resolution was approved was in all things conducted in strict
compliance with the Texas Open Meetings Act, Texas Government Code, Chapter 551.
2024,
PASSED BY THE CITY COUNCIL of the City of Beaumont this the 4th day of June,
- /Mayor Roy West -
0
Projectmates
CITYOFBEAUMONT.PROJECTMATES.COM
Change Order #002.003
WU0123-08 - South Idlest Tank Rehabilitation, 1350 Langham Rd, Beaumont, TX 77707 USA
Tuesday, May 21, 2024
Grand Total:
Change Order Details
($14,545.20)
Description
Change Order 3 - Final
Division
33 - Utilities
Scope of Work
To rehabilitate the interior and exterior of the South West Elevated
Storage Tank near Washington and Municipal Dr. The project also
includes valve and line replacement.
Awarded to
Luan Ha (Viking Industrial Painting, LLC), 28352
Created By
Luan Ha (Viking Industrial Painting, LLC)
Create Date
Apr 12, 2024 11:37 AM CST
Reason Code
Owner Requested
Days Changed
57
Attachments
CH03 and final rev 2.pdf
CH03 and final prelim rev (002).pdf
Additional Info
Line Item Type Unit price
Group 3.0 Construction
Capital Planning
Capital Planning
Capital Project Fiscal
Year
Apr 12, 2024
Construction - Southwest Elevated Storage Tank Rehabilitation
2024
Accounting
Item Id 542
PO Number 441224
Summary
Original Contract Sum
Net Cost by Previous Approved Change Order
Contract Sum Before This Change Order
Contract Sum Changed By This Change Order
New Contract Sum
Substantial Completion Date
Net Time Change By Previous Change Order
Substantial Completion Before This Change
Order
Time Changed By This Change Order
1,348,440.00
0.00
1,348,440.00
-14,545.20
1,333,894.80
N/A
10 day(s)
NIA
57 day(s)
New Substantial Completion Date
All Change Orders of the 011ginai Contract
Line Items
N/A
-1.078668683812405446293494700%
Item Account WBS/ Description Quantity UoM Unit
# Code Section Price
Conti acf Items
015 330000 Buzzard -0.50
Deterrent
019 330000 Miscellaneous -0.18
Tank Repairs
020 33000 Tank Refill B/C -1.00
Approval (Approved)
User f Role
Andrew Lenzie (External -GC)
John Pippins (Project Manager)
Total
Amount
LS 10,000.00-5,000,00
ALLOW 25,000.00-4,522.00
LS 5,023.20-5,023.20
Total-14,545.20
Status
Approved
May 13, 2024 03:36 PM CST
Approved
May 14, 2024 08:04 AM CST
Approved
Comments
User 1 Role Status
May 20, 2024 04:15 PM CST
Amalia "Molly" Villarreal (City Engineer) Approved
May 21, 2024 10:48 AM CST
Bart Bartkowiak (Director) Approved
May 21, 2024 12:52 PM CST
Dara Woodruff (Admin) Approved
May 21, 2024 01:59 PM CST
Comments
Projectmates
CITYOFBEAUMONT.PROJECTMATES.COM
Change Order #002.002
WU0123-08 ® South West Tank Rehabilitation, 1350 Langham Rd, Beaumont, TX 77707 USA
Wednesday, May 22, 2024
Change Order Details
Description
Division
Scope of Work
Awarded to
Created By
Create Date
Reason Code
Days Changed
Additional Info
Line Item Type
Group
Dates
Grand Total: $0.00
Change Order 2
33 - Utilities
To fabricate a coupler adapter, plates, and mounting brackets for
installation of the existing 14" MOV on the new 20" butterfly valve.
Luan Ha (Viking Industrial Painting, LLC), 28352
John Pippins (City of Beaumont)
Dec 08, 2023 11:44 AM CST
Equipment Change
61
Unit price
3.0 Construction
Created On
Capital Planning
Capital Planning
Capital Project Fiscal
Year
Summary
Dec 08, 2023
Construction - Southwest Elevated Storage Tank Rehabilitation
2024
Original Contract Sum
Net Cost by Previous Approved Change Order
Contract Sum Before This Change Order
Contract Sum Changed By This Change Order
New Contract Sum
Substantial Completion Date
Net Time Change By Previous Change Order
Substantial Completion Before This Change
Order
Time Changed By This Change Order
New Substantial Completion Date
All Change Orders of the Original Contract
1,348,440.00
0.00
1,348,440,00
Mo
1,348,440.00
NIA
5 day(s)
NIA
5 day(s)
NIA
0%
Line Items
Item Account WBS/ Description
# Code Section
Contract Items
019 330000 Miscellaneous Tank -0.08
Repairs
020 330000 Fabricate a coupler 1.00
adapter, plates, and
brackets foi- install of
existing 14" MOV on
20" BFV
Approval (Approved)
User 1 Role
Luan Ha (External -GC)
Jeff Beaver (External -Engineer)
John Pippins (Project Manager)
Amalia "Molly" Villarreal (City Engineer)
Quantity UoM Unit Total
Price Amount
ALLOW 25,000.00-2,100.00
LS 2,100.00 2,100.00
Status
Approved
Dec 08, 2023 11:50 AM CST
Approved
Dec 10, 2023 10:12 AM CST
Approved
Dec 11, 2023 11:48 AM CST
Approved
Total 0.00
Comments
User 1 Role
Bart Bartkowlak (Director)
Dara Woodruff (Admin)
June Ellis (Assistant City Manager)
Tina Broussard (City Clerk)
Status
Dec 11, 2023 01:15 PM CST
Approved
Dec 11, 2023 01:20 PM CST
Approved
Dec 11, 2023 02:04 PM CST
Approved
Dec 11, 2023 06:00 PM CST
Approved
Dec 12, 2023 09:18 AM CST
Comments
n
Projeetmates
CITYOFBEAU MONT.PROJECTMATES.COM
Change Order #002.001
WU0123-00 - South West Tank Rehabilitation, 1350 Lang ham Rd, Beaumont, TX 77707 USA
Wednesday, May 22, 2024
Change Order Detail
Description
Division
Scope of Work
Awarded to
Created By
Create Date
Reason Code
Days Changed
Attachments
Additional Info
Line Item Type
Group
Dates
s Grand Total: $0.00
Change Order 1
33 - Utilities
This Change Order is to install a conduit for the proposed tank mixer
and to add an additional logo facing south on the tank.
Luan Ha (Viking Industrial Painting, LLC), 28352
John Pippins (City of Beaumont)
Oct 27, 2023 01:31 PM CST
Owner Requested
5
RES 23-341 SW EST C Ol .pdf
Unit price
3.0 Construction
Created On Oct 27, 2023
Capital Planning
Capital Planning Construction - Southwest Elevated Storage Tank Rehabilitation
Capital Project Fiscal 2024
Year
Summary
Original Contract Sum 1,348,440.00
Net Cost by Previous Approved Change Order 0.00
Contract Sum Before This Change Order 1,348,440.00
Contract Sum Changed By This Change Order 0.00
New Contract Sum 1,348,440.00
Substantial Completion Date NIA
Net Time Change By Previous Change Order 0 day(s)
Substantial Completion Before This Change NIA
Order
Time Changed By This Change Order 5 day(s)
New Substantial Completion Date NIA
All Change Orders of the Original Contract
Line Items
Item Account WBS1 Description
Code Section
Contract Items
019 330000 Miscellaneous Tank -0.74
Repairs
020 330000 Install now buried 1" 1.00
electrical conduit from
the power panel to the
dry riser. Repair
coating
021 330000 Paint one additional 1.00
logo
Approval (Approved)
User 1 Role
Luan Ha (External -GC)
.Jeff Beaver (External -Engineer)
Status
0%
Quantity UoM Unit Total
Price Amount
ALLOW 25,000.00-18,378.00
LS 10,778.00 10,778,00
LS 7,600.00 7,600.00
Approved
Nov 06, 2023 09:17 AM CST
Approved
Nov 06, 2023 02:54 PM CST
Total 0.00
Comments
User 1 Role Status
John Pippins (Project Manager) Approved
Nov 06, 2023 04:07 PM CST
Amalia "Molly" Villarreal (City Engineer) Approved
Nov 06, 2023 04:59 PM CST
Bart Bartkowiak (Director) Approved
Nov 07, 2023 08:21 AM CST
Dara Woodruff (Admin) Approved
Nov 27, 2023 10:53 AM CST
June Ellis (Assistant City Manager) Approved
Nov 27, 2023 03:17 PM CST
Tina Broussard (City Clerk) Approved
Nov 28, 2023 08:51 AM CST
Comments
0
Projectmates
Invoice Details
Contract
Invoice #
Description
Invoice Date
Pay Period
Final Invoice
Grand Total
Paymut To
Created By
Create Date
Invoice ID
Attachments
Retainage
Work Completed
Materials Stored %
Line Items
CIT YOFBEAUMO NT. P ROJECTMATES,COM
Invoice #002.007 FINAL for Invoices/Pay Apps
WU0123-08 -South West Tank Rehabilitation, 1350 Langharn Rd, Beaumont, TX 77707 USA
Friday, May 24, 2024
Contract - 002 South West Tank Rehab - Cons,
002.007 FINAL
Viking Industrial Painting, LLC - South West Tank Rehab - Cons,
May 22, 2024
Feb 16, 2024 to Apr 10, 2024
Yes
($5,023,20)
Luan Ha 28352 (Viking Industrial Painting, LLC)
John Pippins (City of Beaumont)
May 22, 2024 09:05 AM CST
1107
2024.04.10 J09700-007 Beaumont W Elevated (J_),p�f
0.00
0.00
Amount Due., 61,922.70
Item Account WBS/ Description
Contract Previous Quantity
1.10M Unit Work
Materials Total
# Code Section
Total Payments
Price Completed
Stored Amount
(WC)
(MS)
Change Order 1 - Contract Items
019 330000 Miscellaneous
-0.74 @ 0.00 0.00
ALLOW 25,000.00-18,378.00
0.00-18,378.00
Tank Repairs
25,000,00
Grand Total 1,333,894.80
Item Account
WRS/
Description
Contract
Previous
Quantity
UOM
Unit
Work
Materials
Total
0 Code
Section
Total
Payments
Price
Completed
Stored
Amount
(WC)
(MS)
-18,500.00
020
330000
Install new
1.00 @
10,778.00
0.00
LS
10,778.00
0.00
0.00
10,778.00
buried 1"
10,776.00
electrical
=
conduit from
10,778.00
the power
panel to the
dry riser.
Repair coating
021
330000
Paint one
1,00 @
7.600.00
0.00
LS
7,600,00
0,00
0.00
7,600,00
additional
7,600.00 =
logo
7,600.00
Change Order 2 - Contract Items
019
330000
Miscellaneous
-0,08{la
0,00
0,00
ALLOW
25,000.00
-2,100,00
0.00
•2,100.00
Tank Repairs
25,000.00
_-2,404.00
020
330000
Fabricate a
1.00 @
2,100.00
0.00
LS
2,100.00
0.00
0.00
2,100,00
coupler
2,1C0.00 =
adapter,
2,100,00
plates, and
brackets for
Install of
existing 14"
MOV on 20"
BFV
Change Order 3 - Final - Contract Items
015
330000
Buzzard
-0.50 @
0,00
0,00
LS
10,000.00
-5,000.00
0.00
.5,000.00
Deterrent
10,000.00
_ -5,000.00
019
330000
Misceltaneous
-0.18 @
0.00
0.00
ALLOW
25,000.00
-4,522.00
0,00
-4,522,00
Tank Repairs
25,000.00
_-4,522.00
020
33000
Tank Refill
-1.00 @
€I.00
0.00
LS
5,023.20
-5,023.20
0.00
-5,021.20
BIC
5,023.20 =
-5,022,20
Contract items
001
330000
utilities
1,00@
33,500.00
D.00
LS
33,500.00
0.00
0.00
33,500.00
33,500.00
33,500.00
Grand Total
1,333,894.80
Itern
Account WBS/
Description
Contract
Previous
Quantity
UoM
Unit
Work
Materials
Total
#
Code Section
Total
Payments
Price
Completed
Stored
Amount
(WC)
(MS)
002
330000
Tank Coating
1,00 t?o
B64,500,00
0.00
LS
864,500.00
0.00
0.00
864,500.00
864,500.00
864,500.00
003
330000
Soluble Sall
3.00 @
3,750.00
0.00
EA
1,250.00
0.00
0.00
3,750.00
Test, Exterior.
1,250.00
3,750,00
004
330000
Pressure
1.00 @
8,700.00
0,00
LS
8,700.00
0,00
0.00
8,700.03
Washing and
8,700.00 =
Blasting if
8,700.00
Soluble Test
is Positive.
Wash the tank
and reblast
the exterior 0
005
3300DO
Soluble Salt
3.00 @
3,750.00
0.00
EA
1,250.00
0.00
0.00
3,750.00
Test, Interior.
1,250.00 =
3,750.00
006
330000
Pressure
1.00 @
6,700.00
0.00
LS
6,700.00
0.00
0.00
6.700.00
Washing and
6,700.00 =
Blasting If
6,700.00
Soluble Test
Is Positive.
Wash the tank
and reblast
the Interior o
007
330000
Brick Building,
1.00 @
34,400.00
0.00
LS
34,400.00
0.00
0.00
34,400.00
34,400.00
34,400,00
008
330000
New 20'
1.00 @
247,300.00
0.00
LS
247,300.00
0.00
0.00
247,300,00
Header
247,300.00
Piping.
_
247,300.00
009
330000
Electrical.
1.00 @
39,400,00
0.00
LS
39,400.00
0.00
0.00
39,400.00
39,400.00
39,400.00
010
330000
illumination
1.00 @
1,100.00
0.00
LS
1.100.00
0.00
0.00
1,100,00
System
1,100.00 =
1,100.00
011
330000
Obstruction
1.00 @
12,400.00
O.GO
LS
12,400.00
0.00
0.00
12,400.00
Light
12.400.00
Grand Total
1,333,094.80
Item Account WBS1 Description
Contract
Previous
Quantity
UoM
Unit
Work
Materials
Total
# Code Section
Total
Payments
pace
Completed
Stored
Amount
(WC)
(MS)
12,400.00
012 330000 Roof Access
1.00 @
16,200.00
0.00
LS
16,200.00
0.00
0.00
16,200.00
Ladder
16,200,00
16,200.00
013 330000 Roof Vent
1.00 @
7,500.00
0.00
LS
7,500.00
0.00
0.00
7.500.00
7,500.00 =
7,500.00
014 330000 Coax Cagle
1.00 tin
900.00
0,00
LS
900.00
0.00
0.00
900.00
Safety Chain
900.00 =
900,00
015 330000 Buzzard
1.00 @
5,000,00
0,00
LS
10,000.00
5,000.00
0.00
10,000.00
Deterrent
10,000.00
10,000.00
016 330000 Chain Link
184.00 @
15,640.00
000
LF
85,00
0.00
0.00
15,640.00
Fence
85,00
15,640,00
017 330000 Construct a
416.00 @
10,400.00
000
SY
25.00
0.00
0.00
10,400,00
New
25,00 =
Limestone
10,400110
Access Road
01a 330000 Site Work
1.D0@
7,300.00
0,00
LS
7.300,00
0.00
0.00
7,300.00
7,300.00 =
7,300, 00
019 330000 Miscellaneous
1.00@
0.00
0,00
ALLOW
25,600,0D
25,00D.00
0.00
25,000,00
Tank Repairs
25,000,00
25,000, 00
Grand Total
1,333,894.80
Summary
1. Contract Sum +Amendments
1,348,440.00
2. New Change by Change Request
-14,545.20
3, Contract Sum To Rate (Line 1 + Line 2)
1,333,894.80
4. Total Completed & Stored To Rate
1,333,894.80
5, Retainage
5a. 0,00% of Completed Work (Column I on Continuation Sheet
5b. 0.00% or Stored Material (Column J on Continuation Sheet)
Total Retainage (5a + 5b)
6. Total Famed Less Total Retainage
7, Less Previous Certificates for Payment
8. Current Amount Due
9. Balance to Finish, Including Retainage (Line 3 less Line 6)
Additional Info
Line Item Type
Unit price
Group
3.0 Construction
Accounting and Status
Capital Funding Source
Capital Project Fiscal Year
PO Number
Approval (Approved)
User I Role
Andrew Lenzia (External -GC)
Jeff Beaver (External -Engineer)
John Pippins (Project Manager)
Arnalia "Molly" Viliarreal (City Engineer)
Bart Bartkowiak (Director)
Crystal Valencia (Admin)
0.00
0.00
Resign - Southwest Elevated Storage Tank Rehabilitation
2024
441224
Status
Approved
May 22, 2024 09:46 AM CST
Approved
May 23, 202410:20 AM CST
Approved
May 23, 202411:46 AM CST
Approved
May 23, 2024 05:33 PM CST
Approved
May 24, 2024 08:31 AM CST
Approved
May 24, 2024 09:10 AM CST
0.00
1,333,894.80
1, 271,972.10
61,922.70
0.00
Comments