HomeMy WebLinkAboutRES 24-120 RESOLUTION NO. 24-120 BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF BEAUMONT: WHEREAS,on April 18,2024,bids were solicited for a contract for the Pine Street SWTP Chlorine Dioxide System Project; and WHEREAS, ALLCO, LLC, of Beaumont, Texas, submitted a bid in the amount of $1,510,841.17; and, WHEREAS, the City Council is of the opinion that the proposal submitted by ALLCO, LLC, of Beaumont, Texas, should be accepted; NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF BEAUMONT: THAT the statements and findings set out in the preamble to this resolution are hereby, in all things, approved and adopted; and, THAT the bid submitted by ALLCO, LLC, of Beaumont, Texas, in the amount of $1,510,841.17 for the Pine Street SWTP Chlorine Dioxide System Project be accepted by the City of Beaumont; and, THAT the City Manager be and he is hereby authorized to execute a contract with ALLCO, LLC, of Beaumont, Texas in the amount of $1,510,841.17 for the Pine Street SWTP Chlorine Dioxide System Project. The meeting at which this resolution was approved was in all things conducted in strict compliance with the Texas Open Meetings Act, Texas Government Code, Chapter 551. PASSED BY THE CITY COUNCIL of the City of Beaumont this the 7th day of May, 2024. \ 10-1v104/7- 1 , 04.6 A- 1'10 W • - Mayor Roy West - Nix J Recommendation for Award of Contract Project Pine St. SWTP Chlorine Dioxide System—Bid No. WU1224-07 Project Number Owner City of Beaumont BMT22817 Project Description The Work for this project consists of a modifications to the Bulk Chemical Storage Facility including the demolition and replacement of a sodium chlorite tank, installation of two chlorine dioxide generators and associated piping and appurtenances, and installation of associated yard piping,electrical, and instrumentation work. Date Bids Received 4/18/2024 Bid Tabulation Attached? ® Yes ❑ No Recommended Offeror Allco, LLC Recommended Amount of Contract Award $ $1,510,841.17 Contract Price within Available Funds? ® Yes ❑ No Funding Source City of Beaumont Proposed Project Completion Date 390 days Contract Times meet Owner's Schedule? ® Yes ❑ No Comments Two(2) bids were received. Allco,LLC Trew Contracting Engineer's Solutions,LLC Estimate Mobilization $77,560.00 $190,000.00 $50,000.00 Storm Water Pollution Prevention Plan $811.88 $5,000.00 $5,000.00 Sodium Chlorite Improvements at Bulk Chemical $266,379.00 $1,125,247.00 $82,500.00 Storage Facility Chlorine Dioxide System Installation at Chemical $984,133.38 $375,000.00 $1,188,200.00 Feed Building Yard Piping Modifications in Existing Pipe $181,956.91 $225,000.00 $154,600.00 Trenches Recommended Total $1,510,841.17 $1,920,247.00 $1,480,300.00 The apparent lowest bid was provided by Allco, LLC. FNI has had positive experience working with Allco, LLC on multiple ongoing projects. FNI recommends award of the contract to Allco, LLC. Review of the Bids received indicates that the offer of the Recommended Contractor provides the best value to the Owner.A review of the Recommended Contractor's Statement of Qualifications indicates that the Recommended Contractor meets the qualification requirements specified in the Contract Documents and that Recommended Contractor's previous experience on similar projects has been acceptable. It is recommended that the Project be awarded to the Recommended Contractor in the amount of the Recommended Amount of Contract Award. Recommended by Sheldon Buck, P.E. Date 4-24-2024 Title Sr. Project Manager Representing Freese and Nichols, Inc. Recommendation for Award of Contract Page 1 of 1 984,133L3B 181,956141 00 4116 Bid Form Exhibit A-Bid Tabulation Bid Opening:4/18/2024 Project: Pine Street SWTP Chlorine Dioxide System Project No.: Owner: City of Beaumont BMT22817 Design Professional: Freese and Nichols,Inc. Bid No.WU1224-07 Base Bid Allco,LLC Trew Contracting Solutions,LLC Engineer's Estimate •item No. .. hem Description Unit ` Estimated _»c.e nd.n y�..... „-, /mo1Ytt.. Unit Iy4outtt.:, Unit Price Ex Amount Quantity Items in Base Bid(excluding Allowances)per Section 01 2901"Measurement and Basis for Payment" 77,560.00 190,000.00 190,000.00 50,000.00 50,000.00 811.88 5,000.00 5,000.00 5,000.00 5,000.00 Sodium Chlorite Improvements at Bulk Chemical Storage Facility including demolition of existing sodium chlorite tank and piping,new A-03 chemical storage tank,electrical and instrumentation,chemical piping, 266,379.00 1,125,247.00 1,125,247.00 82,500.00 82,500.00 valves,and appurtenances in accordance with the Contract Documents and complete in place. Chlorine Dioxide System Installation at Chemical Feed Building A-04 including the addition of chlorine dioxide generators,chemical piping, valves,and appurtenances,and instrumentation in accordance with the 984,133.38 375,000.00 375,000.00 1,168,200.00 1,188,200.00 Contract Documents and complete in place. Yard Piping Modifications In Existing Pipe Trenches including demolition of existing sodium chlorite and chlorine dioxide lines and A-05 installation of new sodium chlorite and chlorine dioxide lines in the 181,956.91 225,000.00 225,000.00 154,600.00 154,600.00 trenches with appropriate appurtenances and supports in accordance with the Contract Documents and complete in place. A Total Base Bid Items Amount(Sum of Extended Amounts for each Base Bid Line Item) $ 1,510,841.17 5 1,920,247.00 $ 1,480,300.00 B Add(v)or Deduct(-)(See Note 1) C Total Adjusted Base Bid Amount(A plus B) S 1,510,841.17 $ 1,920,247.00 S 1,480,300.00 'Bidder disqualified on the basis of incomplete submission. Bid Form Exhibit A 004116-1 BMT20512-Loeb Groundwater Facility Chemical Improvements