HomeMy WebLinkAboutRES 24-111RESOLUTION NO, 24-111
BE IT RESOLVED BY THE CITY COUNCIL
OF THE CITY OF BEAUMONT:
THAT the City Manager be and he is hereby authorized the repair of a pump for the
Lawson's Primp Station in an amount not to exceed $68,900.00 from Triangle Rotating
Equipment Specialists (TRES) of Nederland, Texas.
The meeting at which this resolution was approved was in all things conducted in strict
compliance with the Texas Open Meetings Act, Texas Government Code, Chapter 551.
PASSED BY THE CITY COUNCIL of the City of B
2024.
this the 30th day of April,
Mayor Roy West -
T.R.E.S. Machine, Inc.
P.O. Box 222
Nederland, TX 77627-0222
I Name/Address I
City of Beaumont
Accounting T)ivision
P.O. Box 3827
Beaumont, Texas 77704
Date Quote ##
3/7/2024 42129
Rep
Project
IJA
Description
Qty
Total
Subject: Cost of work on your No. 3 raw water pump at the end of Pine Street.
Single stage vertical Ruhrpumpen Size 281-4Q0.
Cost to do the work listed below will not exceed $66,000.00.
A) Repair all bowl bushings, enclosing tube bushings, tension tube nut and tail
1
66,000.00
bowl bearing.
B) Check all shafts for straight, polish and use again if they have no wear in
bushing areas, The last two pumps the shads could not be run again.
C) Put rotating end in and check for run out on impeller ring and clearance. If the
wear ring clearance is bad this will cost extra to repair. Your last pump was ok.
TRES to furnish discharge gasket.
D) Sand blast complete pump inside and out. Put 6 mills of primer on and 3 mills
of finish coat. Paint to be compatible with drinking water.
E) TRES to furnish freight and custorner to furnish crane and misc. bolting.
F) TRES to furnish (2) technicians in the field to assist in removing motor and
pump to reinstall both. Set lift and run.
/
Thank you 1br allowing T.R.E.S. to quote on your equipment repairs.
Sales Tax
0.00
Total $66,000.00
T.R.E.S. Machine, Inc.
P.O. Box 222
Nederland, TX 77627-0222
I Name/Address j
City of Beaumont
Accounting Division
P.O. Box 3827
Beaumont, Texas 77704
Date Quote #
3/21/2024 42130
Rep
Project
EJA
Description
Qty
Total
Cost to tear down and quote %vi116e the same as the first two. Not to exceed
$2,900.00,
Sales Tax
1
r
2,900.00
0.00
Total $2,900.00