HomeMy WebLinkAboutRES 24-114RESOLUTION NO.24-114 BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF BEAUMONT: WHEREAS, on November 21, 2023, by Resolution 23-356, City Council awarded a contract to Grant Mackay Company Inc., of Houston, Texas, in the amount of $756,786.15, for the demolition of the two (2) structures at the AT&T Building; and, WHEREAS, proposed Change Order No. 1, in the amount of $17,732.23, is requests due to the need of asbestos removal, if approved, the adjustment in quantities would result in a new contract amount of $774,518.38; and, WHEREAS, an additional three (3) calendar days are needed to complete the work; NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF BEAUMONT: THAT the statements and findings set out in the preamble to this resolution are hereby, in all things, approved and adopted; and, THAT the City Manager be and lie is hereby authorized to execute Change Order No, 1, in the amount of $17,732.23 for additional work described above, thereby increasing the total contract amount to $774,518.38 for the demolition of the two (2) structures at the AT&T Building; and, THAT an additional three (3) calendar days to be added to complete the work. The meeting at which this resolution was approved was in all things conducted in strict compliance with the Texas Open Meetings Act, Texas Goverminent Code, Chapter 551. PASSED BY THE CITY COUNCIL of the City of Beaumont this the 30th day of April, Grant Mackay Company, Inc. Award Letter Commercial Demolition and Debris Removal of the Two (2) Structures, Concrete Sidewalk and Curtis, Concrete Paving Sections, Fuel Tank Removal and Sitework Located at 555 Main Street, Beaumont, TX 77701 Bid No. MF0023-52 November 30, 2023 RMC)Lt1'1 ION NO.23.356 13L IT RR SOLVED BY Tx1F CITY COUNCI1, OF TH R CITY OF HRAUMON : 'i' IKJ' (lie City Manager be and lie is Hereby akithorizod to civtlflyd a collimot With Orant Mackay Company hic,, of I oimton, Texas in the; amount of ,$75t,7R(i,15 [or the demolition of flu: two (2) ,sluicLures loomed a(555 Main Street. The mcutinb tit which, this resolution was approved was in till t1111188 cancitiC(Ccl ill strict complilmce with (110'1'axas Opon Meetings Act, Tens Government Code, Chapter 55 t, PASS111) 13Y THE CITY COUNCIL of the City of c atimont this (lie 21 st clay of Novembut-, 202.3. �, •,.•���~a��� f Ma�11it1 ,y. mayor Roy Wo.st - R CHANGE ORDER Project: City of Beaumont Contract for the AT&T Building Denio Located at 555 Main Street, Beaumont, Texas Contractor: Grant Mackay Company, Xtte, 13610 Reeveston Road Houston, TX 77039 Change Order Number-.- 1 Date: April 22, 2024 City laid No: Mli 0923-52 The Contract is changed as follows: This change resulted from the need to remove unforeseen asbestos containing materials from the side of the concrete foundation underground. Asbestos material was discovered once the dirt was removed away from the building slab. "!'his change order is being requested as follows: Total Cost for Change Order 1: The Original Contract Sum was The net change by previously authorized Change Orders The Contract Sum prior to this Change Order was The Contract Suite will be increased by this Change Order in the amount of The new Contract Suns including this Change Order therefore is $17,732.23 $756,786.15 $0.00 $756,786.15 $1.7,732.23 $774,518.38 The contract time will not be increased because of this Change Order. Grunt Nlaelcay 11361.0 Reeveston Road Houston, TX 77039 By (Signature) 4/22/24 (Date) Ncphi Mackay City of Beaumont 1848 Pine St. Beaumont, Texas 77703 By (Signature) (Dnto) GRANT OKAY nr,rui.rrrc>� r.. Change Order -Thee and Malerlal Prof ecl Name: PCOt1: Dale Submllled: 4/15124 City of Beaumont AT&T Bldg Oemo - IlosemenI Vapor Barrier Disposal vrtlh addiflonal Date Performed: Tilt] Throe Days of Work QTY RT Role I OT Rate I Total Rf Hours Total OT Hours Total PTolecl Manager Project Manager 0 $ 100.00 $ 135.00 0 0 $ EsIlmalo Eslimalor 0 $ 80.00 $ 108.00 0 0 $ Superinlendenl Superinlondent 0 $ 75.00 $ 101.25 0 0 $ Torchman Torchman 0 $ 75.00 $ 101.25 0 0 $ Oneralor Operator 1 $ 55.00 $ 74.25 30 0 $ 1,650,00 Foramen II Foreman 11 0 $ 45.00 $ 87.75 0 0 $ Foreman Foreman 1 0 $ 55.00 $ 74.25 0 0 $ Skilled Laborer SkFlled taborer 1 $ 40.00 $ 54.00 30 0 $ 1,200.00 Oliver Dilver 0 $ 50.00 $ 67.50 0 0 $ Labor Total 2,850.00 Equipment Rolos QTY RT Hours Hourly Rule Total Skid $tear 0 $ 75.00 $ M#nl-Ex 1 0 $ 75.00 $ Excavator 1 30 $ 125.00 $ 3.750.00 Equlpntonl Total $ $ 3,7SD.00 Malerlal and Removal Rates QTY RT Hauls Hourly Rate Total Vapor 0anler Disposal 12 724,7465 $ $ 8,696.96 Subcontractors Anil. Cos! per Unit Total 0 $ $ Material Total $ - $