Loading...
HomeMy WebLinkAboutRES 24-050RESOLUTION NO. 24-050 BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF BEAUMONT: THAT the City Manager be and he is hereby authorized to execute an agreement, substantially in the form attached hereto as Exhibit "A," with Kraftsman Cone-nercial Playgrounds and Water Parks of Spring, Texas through the Buy Board Texas Contract #679-22 in the amount of $153,854.48 to install one (1) new picnic pavilion at Rogers Park. The meeting at which this resolution was approved was in all things conducted in strict compliance with the Texas Open Meetings Act, Texas Governlient Code, Chapter 551. PASSED BY THE CITY COUNCIL of the City of February, 2024. 4o%,"x� EW umont this the 20th day of Roy Wdst — Kraftsman COMMERCIAL. PLAYGROUNDS & WATER PARKS 19536 Haude Road Spring, TX 77388 Phone: (281) 363-9699 Fax: (2111) 353.2266 BILL. TO QUOTE #Q78674.1 Dale: 0113112024 Project: 30106 Created By: Ryan Slott Quote Name. 44' x 30' - RCP Sheller Page 1 of 6 SHIP TO Deslpn:KPS-30106 SheeL-K.6.1A Date:9.16.2023 DISCBB Proposal Includes Discount on BuyBoard Purchase, BuyBoard Contract 11679-22 1 KSHELTER Custom All Steel Shelter, 44' x 30' with 24 gauge exposed fastener metal panel roof, 4:12 roof pitch, 7.5' eave height, six hat -dipped galvanized tube steel columns mounted on base plates below surface. Includes engineer sealed cerilfled drawings and delivery to site. 6 PIER53OX096 Concrete piers pavilion & canopy columns, with anchor hells set, and with steel robar Wx96" reinforcement, By: Kraftsman 1472 CONC5RB Concrete Pad, 6' thick concrete pad with, robar reinforced, broom finish, minimum 500 32'x46' sq. ft. 1 SITEPREP Preparation of Site by Kraftsman 1 BOND1 Performance & Payment Surety Bond, and processing of the bond documentation. NOTE Location (TBD) Kraftsman to approve Iecallon subject to plan and site review for access and other potential changes. Total: $153,854.48 1rr1aals