HomeMy WebLinkAboutRES 24-054RESOLUTION NO. 24-054 BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF BEAUMONT: THAT the City Manager be and lie is hereby authorized to award a contract to Brystar Contracting, Inc., of Beaumont, Texas for the West Lucas Drive and Gladys Avenue Emergency Strom Sewer Point Repair and Cavity Repair Project in the amount of $736,761.00. The meeting at which this resolution was approved was in all things conducted in strict compliance with the Texas Open Meetings Act, Texas Government Code, Chapter 551. PASSED BY THE CITY COUNCIL of the City of Beaunwq this the 20th,day of Fcbr ary, 2024. Mayor Roy West — IN CONTRACTING, IAIC ti 85 {'I1vini(-al Rand ° 13( i��ni(���1,'I(xtrti 77701 -(409) 8'47-0768 ,January 30, 2024 Molly Villarreal, P,E, City Engineer City Hall, 801 Main Street Beaumont, Texas 77701 Via email: Cc: Drrviel.Tinl;lc rr)��car�n�or�ttrxtts. Re: GIadys Street 12" Tap and Future Tie in Point Dear Ms. Villarreal, The following is a NOT TO EXCEED budget based on the scope previously discussed. Final billing for the proposed work will be based on the hourly rates and 3" party invoices with a 15% mark up. Task Quantity Units Unit Price Totals 12X18 Tap Complete 1 EA $29,300.00 $ 29,300.00 12" Waterline - C900 60 LF $ 360.00 $ 21,600.00 8" Waterline - C900 50 LF $ 292.00 $ 14,600.00 12X8 Cross Installed 1 EA $ 3,500.00 $ 3,500.00 12" 45 DEG, ELL 4 EA $ 1,800.00 $ 7,200.00 Installed 8" 45 DEG. ELL 6 EA $ 1,100,00 $ 6,600.00 Installed 12" Gate Valve Installed 1 EA $ 5,100.00 $ 5,100.00 Pavement Removal 42 SY $ 70.00 $ 2,940.00 Pavement Replacement 42 SY $ 265.00 $ 11,130.00 Bid Total $101,970.00 ® This proposal is based oil bacteria testing Moth the 8" & 12" in one test, There could be additional cost if separate tests are required, Brystar Contracting appreciates the opportunity to submit this proposal. Should you have any questions or concerns please do not hesitate to call. Siticerely, Bryan Phelps, President CONTRACTIAIGy INC tti 3i;5 Chemical Road ^ 13v; monE.'I'cx.m, '177M -009) 8 42-67W�' February 12, 2024 Molly Villarreal, P.E. City Engineer City Hall, 801 Main Street Beaumont, Texas 77701 Via xtts,gov Cc: David.Tirtt;le(ri>,bCalltt10111texaS, Re: Gladys and Lucas Storm Drainage Repair Dear Ms. Villarreal, Based on our recent conversations, l offer the following information for your review. To be added to the not to exceed budget $96,021.00 Clarifications This cost is due to the additional work needed to be done at the repair site once construction activities began. This cost includes the following work, l . install I — 9' X S' cast in place junction box to accept the 36" storm sewer from Thomas Rd. and the 18" storm sewer overflow from Central Dr, 2. Repair the west wall of the existing conflict box and install the 18" overflow line. 3. Connect the existing 30" RCP storm drain to the new cast in place junction box. 4. Remove and replace additional pavement not included in the original budget. Exclusions 1. Density testing to any of the backfill material or limestone base. 2. Compression strength testing of concrete pavement. 3. Standby days. Brystar Contracting appreciates the opportunity to submit this proposal. Should you have any questions or concerns please do not hesitate to call, Sinccrely, Bryan Phelps, eL,zw -._ President