HomeMy WebLinkAboutRES 24-054RESOLUTION NO. 24-054
BE IT RESOLVED BY THE CITY COUNCIL OF THE
CITY OF BEAUMONT:
THAT the City Manager be and lie is hereby authorized to award a contract to Brystar
Contracting, Inc., of Beaumont, Texas for the West Lucas Drive and Gladys Avenue Emergency
Strom Sewer Point Repair and Cavity Repair Project in the amount of $736,761.00.
The meeting at which this resolution was approved was in all things conducted in strict
compliance with the Texas Open Meetings Act, Texas Government Code, Chapter 551.
PASSED BY THE CITY COUNCIL of the City of Beaunwq this the 20th,day of
Fcbr ary, 2024.
Mayor Roy West —
IN
CONTRACTING, IAIC
ti 85 {'I1vini(-al Rand ° 13( i��ni(���1,'I(xtrti 77701 -(409) 8'47-0768
,January 30, 2024
Molly Villarreal, P,E,
City Engineer
City Hall, 801 Main Street
Beaumont, Texas 77701
Via email:
Cc: Drrviel.Tinl;lc rr)��car�n�or�ttrxtts.
Re: GIadys Street 12" Tap and Future Tie in Point
Dear Ms. Villarreal,
The following is a NOT TO EXCEED budget based on the scope previously
discussed. Final billing for the proposed work will be based on the hourly rates and 3"
party invoices with a 15% mark up.
Task
Quantity
Units
Unit Price
Totals
12X18 Tap Complete
1
EA
$29,300.00
$ 29,300.00
12" Waterline - C900
60
LF
$ 360.00
$ 21,600.00
8" Waterline - C900
50
LF
$ 292.00
$ 14,600.00
12X8 Cross Installed
1
EA
$ 3,500.00
$ 3,500.00
12" 45 DEG, ELL
4
EA
$ 1,800.00
$ 7,200.00
Installed
8" 45 DEG. ELL
6
EA
$ 1,100,00
$ 6,600.00
Installed
12" Gate Valve Installed
1
EA
$ 5,100.00
$ 5,100.00
Pavement Removal
42
SY
$ 70.00
$ 2,940.00
Pavement Replacement
42
SY
$ 265.00
$ 11,130.00
Bid Total
$101,970.00
® This proposal is based oil bacteria testing Moth the 8" & 12" in one test, There
could be additional cost if separate tests are required,
Brystar Contracting appreciates the opportunity to submit this proposal. Should you have
any questions or concerns please do not hesitate to call.
Siticerely,
Bryan Phelps,
President
CONTRACTIAIGy INC
tti 3i;5 Chemical Road ^ 13v; monE.'I'cx.m, '177M -009) 8 42-67W�'
February 12, 2024
Molly Villarreal, P.E.
City Engineer
City Hall, 801 Main Street
Beaumont, Texas 77701
Via xtts,gov
Cc: David.Tirtt;le(ri>,bCalltt10111texaS,
Re: Gladys and Lucas Storm Drainage Repair
Dear Ms. Villarreal,
Based on our recent conversations, l offer the following information for your review.
To be added to the not to exceed budget $96,021.00
Clarifications
This cost is due to the additional work needed to be done at the repair site once
construction activities began.
This cost includes the following work,
l . install I — 9' X S' cast in place junction box to accept the 36" storm sewer from
Thomas Rd. and the 18" storm sewer overflow from Central Dr,
2. Repair the west wall of the existing conflict box and install the 18" overflow line.
3. Connect the existing 30" RCP storm drain to the new cast in place junction box.
4. Remove and replace additional pavement not included in the original budget.
Exclusions
1. Density testing to any of the backfill material or limestone base.
2. Compression strength testing of concrete pavement.
3. Standby days.
Brystar Contracting appreciates the opportunity to submit this proposal. Should you have
any questions or concerns please do not hesitate to call,
Sinccrely,
Bryan Phelps,
eL,zw -._