Loading...
HomeMy WebLinkAboutRES 24-044RESOLUTION NO. 24-044 BE ITRE SOLVED BY THE CITY COUNCIL OF THE CITY OF BEAUMONT: WHEREAS, on May 23, 2023, City Council passed Resolution 23-148 awarding a contract to Vortex C ornparries, of Houston, Texas, in the amount of $2,444,071.28 for the Long Street Grouting Repairs Project; and, WHEREAS, Change Order, No. 1, in the amount of $217,303.38, increased the contract amount to $2,661,374.66; and, WHEREAS, the project has been inspected by the Engineering Division and found to be complete in accordance with the provisions and terms set forth in the contract; NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF BEAUMONT: T14AT the statements and findings set out in the preamble to this resolution are hereby, in all things,, approved and adopted; and, THAT the City Manager is hereby authorized to make final payment in the amount of $217,303.38 to Vortex Companies, of Houston Texas for the Long Street Grouting Repairs Project, The meeting at which this resolution was approved was in all things conducted in strict compliance with the Texas Open Meetings Act, Texas Government ("ode, Chapter 55 1. PASSED BY THE CITY COUNCIL of the City of February, 2024. I this the 6th day of Mayor Roy West — G ITYOF 13EAU MONT, PROJE GTM ATES CO M Change Order #002.001 Long St. Storm Sewer Inspection & Repair, 801 Main St., Beaumont, TX 77701 USA Tuesday, Jan 30, 2024 Change Order Details Grand Total: $217,303.38 Description C04002,001: Additional Grout Quantity Division 13 - Special Construcfion Scope of Work This requested change order is necessary to address additional voids encountered during construction. The initial survey utilizing ground penetrating radar (GPR) was used to estimate the quantity of grout that was needed, however, due to the extent of the voids, and sorne limitations with GPR, additional grout was needed to fully stabilize the Soils Surrounding the storm line on Long Street. Awarded to Jacob Nix (Vortex Turnkey Solutions LLC), 27958 Created By Jacob Nlx (Vortex Turnkey Solutions LLC) Create Date Aug 09, 2023 01:46 PIVI CST Reason Code Quantity Adjustment Days Change(] 0 Attachments RES 23-240 tong Street Grouting,rldf Bj[kag Breakdown for Beaumont (1),Asx Additional Info Line Item Type Unit price Group 3.0 Construction Dates Created On Aug 09, 2023 Capital Planning Capital Planning Construction - Long Street Cavity Repair Capital Project Fiscal Year 2023 Accounting Item Id 439 PO Number 433704 Accounting Project Code STI-STG Summary Original Contract SUrn Net Cost by Previous Approved Change Order Contract Sun) Before This Change Order Contract Sun) Changed By This Change Order New Contract SUM Substantial Completion Date Net Time Change By Previous Change Order Substantial Cornplation Before This Change Order Time Changed By This Change Order Now Substantial Completion Date All Change Orders of the Original Contract Line Items 2,444,071,28 0.00 2,444,071.28 217,303.38 2,661,374.66 N/A 0 day(s) N/A 0 day(s) N/A 8.891041 01l17428918848880708590% Item Account WBS/ Description Quantity UoM Unit Total # Code Section Price Amount 3,0 Construction 002 01000 HIGH DENSITY URETHANE FOR GROUTING, SLAB LOFTING, 17,841.00 EA 12.00, 214,092.00 VO[D FILLING, PIPE SEALING, ETC 003 01000 PERFORMANCE AND PAYMENT BOND 1.00 EA 3,211.313 3,211,38 Total 217,303,38 Approval (Approved) User / Role Jacob Nix (External -GC) David flngle (Project Manager) Amalia "Molly" Villarreal (City Engineer) Bart Bartkowjak (Director) Crystal Garza (AcIrnin) June Ellis (Assistant City Manager) Tina Broussard (City Clerk) Status Approved Aug 14, 2023 01:33 PM CST Approved Aug 14, 2023 01:3,3 PM CST Approved Aug 14, 2023 WOO PM CST Approved Aug 15, 2023 08:42 AM CST Approved Aug 30, 2023 08:07 AM CST Approved Aug 30, 2023 11:01 AM CST Approved Sep 21, 2023 09:0 3 AM CST Comments Approved on 8/29/23 by Resolution No. 23-240 pmnotutrcationsc yemates c9fr-s orn �i 214.217.4100 hLttps,.Jj!sgppp t.p trnaLt&esorn -L- -Lqjg��-- --- @ 2024 Projecirnakes / Systernates, Inc. 2435 N Central Empy Richardson, TX 75080 f-) Projectmates 01 TYOF BEAU M ONTYROJ ECTMAT E&COM Invoice #002.003 - Final for Invoices/Pay Apps Long St. Storm Sewer Inspection & Repair, 801 Main St., Beaumont, TX 77701 USA Tuesday, Jan 30,2024 Invoice Details Contract Contract - 002 Long Street Grouting Repair Invoice # 002.003 - Final Description Vortex Turnkey Solutions LLC - Long Street Grouting Repair Invoice Date Oct O5,2023 Pay Period Jul 16, 2023 to Jul 22, 2023 Final Invoice Yes Grand Total $217,30138 Payment To Jacob Nix 27958 (Vortex Turnkey Solutions LLC) Created By Jacob Nix (Vortex Turnkey Solutions LLC) Create Date Oct 05, 2023 10:32 AM CST Invoice ID 801 Retainage Work Completed %, 0.00 Materials Stored % 0.00 Line Items Amount Due: 217,303,38 Item Account WBS/ Description Contract Previous Quantity UoM Unit Wor,k Materials Total # Code Section Total Payments Price Completed Stored Amount (We) (MS) 3.0 ConstrUCtiOn 001 Go 01000 TRAVEL AND 1.00 4,784.00 0,00 EA 4,784,00 OM 000 4,784.00 Contract MOMLIZATION 4,784.00 4,784,00 002 01000 HIGH DFNSlTY 200,264,00 2,403,168,00 0.00 EA 12.00 0.00 000 2,403,168.00 URETHANE (q), 12.00 � Grand Total 2,661,374.66 Item Account WBS1 Description Contract Previous Quantity UoM Unit # Code Section Total Payments Price FOR 2,403,168.00 GROUTING, St. AB LIFTING, VOID FILLING, PIPE SEALING, ETC 003 01000 PERFORMANCE 1.00 @ 36,119.28 0.00 AND PAYMENT 36,119.28 = BOND 36,119.28 CO#002.001: Additional Grout Quantity - 3.0 Constr 002 01000 HIGH DENSITY 17,841 .00 0.00 0.00 URETHANE 12o0 FOR 214,092.00 GROUTING, SLAB LIFTING, VOID FILLING, PIPE SEALING, ETC 003 01000 PERFORMANCE 1.00 0.00 0.00 AND PAYMENT 3,211.38 BOND 3,21 L38 Summary 1. Contract Sum + Amendments 2. New Change by Change Request 3. Contract Sum To Date (Line 1 + Line 2) 4. Total Completed & Stored To Date 5. Retainage 5a. 0.00% of Completed Work (Column I on Continuation Sheet) 5b. 0,00% of Stored Material (Column J on Continuation Sheet) Total Retainago (5a + 5b) 6, Total Earned Less Total Relainage 7. Less PreViOUS CertifiCatOS for PayrnOut 8. Current Arnount Duo 9, Balance to Finish, Including Retainago (Line 3 loss Line 6) 0.00 0,00 EA 36,119.28 Work Materials Total Completed Stored Amount (WC) (MS) 0.00 Goo 36,119.28 EA 12.00 214,092.00 0.00 214,092.00 EA 3,211.38 3,211,38 0,00 3,211 .38 Grand Total 2,661,374.66 2,444,071.28 217,30338 2,661,374.66 2,661,374.66 0,00 2,661,374.66 2,444,071,28 217,303,38 OLOO Additional Info Line Ram Type unit price Group 3,0 Construction Accounting and Status Capital Funding Source Construction - Long Street Cavity Repair CapRal Project Fiscal Year 2024 Accounting Project Code STLSTG Approval (Approved) user! Role Status David Tingle (Project Manager) Approved Nov 27, 2023 01:56 PM CST Acnalia "Molly" Viflarreal (City Engineer) Approved Nov 27, 2023 02:10 PM CST Bart Bartkowiak (Director) Approved Nov 27, 2023 0152 PM CST Crystal Garza (Adnnin) Approved Dec 04, 2023 10:33 AM CST f2rnnotifications syatemates.com 214.217.4100 hups2supp-Q.rt wjgg-t—mates-,C-0111 ,b 2024 Projectfinates A Systemates, Inc. 2435 N Centrat Expy Richardson, TX 75000 Comments