HomeMy WebLinkAboutRES 24-041RESOLUTION NO. 24-041 13E ITRESOLVEDBY T14E CITY COUNCIL OF THE CITY OF BEAUMONT: WHEIU�,,AS, bids were solicited for the purchase and installation of a standby generator at the Parks Operation Center located at 1370 Langharn Road; and, WHEREAS, Preferred Facilities Group -USA, submitted a bid in the amount of $139,382.14.; and, WHEREAS, City Council is of the opinion that the bid submitted by Preferred Facilities Group-T.JSA, should be accepted; NOW, THEREFORE, BE IT RESOLVED BYTHE CITY COUN(_,'IL OF THE CITY OF BEAUMONT: THAT the statements and findings set out in the preamble to this resolution are hereby, in all things, approved and adopted; and, THAT the bid submitted by Preferred Facilities Group -USA, in the amount of $139,382.14 for the purchase and installation of a standby generator at the at the Parks Operation Center located at 1370 Langharn Road be accepted. The meeting at which this resolution was approved was in all things, conducted in strict compliance with the "Texas Open Meetings Act, Texas Government Code, Chapter 551 PASSED BY THE CITY COUNCIL of the City of February, 2024. this the 6th day of Roy West - 00 PREFERRED FACILITIES GROUP - USA January 16, 2024 Moiling Address: Keith Folsom PO Box 20658 fieournont, TX 77720.0658 City of Beaumont 801 Main IS (409) 842-8293 Beaumont, TX 77701 (409) 842-1274 Project: "Parks Operation Stand By Generator" laf�C�p/q•lisrr.roni Xl��-iISC+.C[7{ii Subject. "Proposal" Job OrderControcting Clear Mr. Folsonn, We are pleased to submit our proposal utilizing our 581-19 Buy Board Texas Contract based on local CCI and Co•Qp Purchosing Agreements coefficient of .89 Proposal Recap: lndeJinite Delivery Indefinite ep(inntRy- IDIQ a Furnish/Install New 150kw Natural Gas Generator (Includes equipment to set the Generator) a Furnish/Install 400 annp SER Transfer Switch Multiple Award Construction Furnish/Install 1) 4" Conduit with (4) Cap mcm and (1) 2/0 ground from Transfer switch to Entergy Cont(octs - MACC Transformer a C=urnlsh/Installl 1) 4" Conduit with (4) 600 mcm and (1) 2/0 ground from ZITS to Existing MIDP a Furnish/Install 1)1" Control Conduit from ATS'to Generator Task Order contracts a Furnish/Install 1)1-1/4" Conduit frolnn MDP to Internal Generator Load Center TOC Proposal Cost 1.35,982.58 Construction n✓onogennent _- Bond 3399.56 Agent or At -Risk Total Proposal Cost $ 139,382.14 We estimate five (5) working, days to complete upon material delivery. (40 Week lead time from date of Design Build We We explicitly exclude all liquidated damages for this project due to the volitivity of the market and supply chain challenges. Government Our estimate Is based on our interpretation of the project as presented to us. Our scope Is limited to the line Items broken down Into Individual tasks of work and developed baser) upon tine Unit Price Book rate as Carminmerciol' modified by the city cost adjustment and our Coefficient. All pricing for the required line -item estimate is derived from the current calendar year RSMeans Facilities Construction Cost Data Book with Updates. Cducotion Croce the quantities of work and price are approved, the individual Job Order becomes a fixed -price lump sum contract. Industrial This pricing Is based on recommended work hours of Monday t'hru Friday 7:00 am to 5:00 pm. Please contact us at 409-842-8293 at your convenience to discuss this estimate. lnfrostriiclore Respectfully submitted, Preferred Facilities Group - USA commPliicalions corporawlfletoil Joshua Schmuck Project Manager/Estimator Assembly cc: PFG/file 23-164s Southeast Texas Deep East Texas Central Texas Texas Gulf ('oast