Loading...
HomeMy WebLinkAboutRES 24-015RESOLUTION NO. 24-015 BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF BEAUMONT: THAT the City Manager be and he is hereby authorized to allow the repair of the ladder on Unit number 7051, a 100-foot ladder truck for the Fire Department from Siddons Martin Emergency Group in the amount of $96,656. 10. The meeting at which this resolution was approved was in all things conducted in strict compliance with the Texas Open Meetings Act, Texas Government Code, Chapter 551. PASSED BY THE CITY COUNCIL of the City of Beaumont this the 23rd day of January, 2024. Siddons-Martin Emergency Group 9645 Jade Ave Port Arthur, TX, 77640 USA Phone: (409) 736-9077 Customer info: Document Info: Unlit Info: Beaumont, City of Work order 11. 311-0000010132 job It: EA455 In / Out P.O. Box 3827 Estimate date: 12/12/2023 VIN: 4PICT02S9VA000283 Hours: 0/0 Beaumont, TX, 77704 Service advisor: Chasetle Flowers Unit; LADDER Miles: 0/0 USA (AOKU) Line It I Part description: FLY SECTION FREIGHT Labor total: $15,400.00 Description: Condition. REMOVE & INSTALL FLY SECTION OF LADDER Correction,• Parts total: $ 5 2,110.31 Sublet total: $01.00 Qty; 1.00 1.00 Frelglit total: $1,880.00 Line It Description: 2 Condition: REPAIR &REPLACE ELECTRICAL WIRES AND CABLE (IF NEEDED) Correction: Part description: Qty: WIRING AND CABLES 1.00 Item price: Total price: $52,11031 $52,110.31 $1,880,00 $1,880.00 Line! total., $,69,390.31 Item price: Total price: $6,016.00 $6,0,16.00 Labor total: $8,662.50 Parts total: $6,016.00 Sublet total., $0.00 Freight total: $0.00, Line total: $14,678.50 Line It Part description: WATERWAY CRATE CHARGE Labor total: $1,540.00 Description: Condition: REMOVE & INSTALL WATERWAY ON THE FLY SECTION OF LADDER Correction: Qty. 1.00 1100 Parts total. $8,917.29 Sublet total: $0.00 Freight total'. $1,880.00 Item price: Total price: $8,917.29 $8,917,29 $1,880m $1,880.00 Line total: $12,337.29 Page I -of 2 Siddons-Martin Emergency Group 9645 Jade Ave Port Arthur, TX, 77640 USA Phone: (409) 736-9077 Document info: Work order 1h 311-0000010132 Line 11 4 Part description; Labor total: Description: Condition: 132-P,OINT INSPECTION Correction: 0' J Qty: Item, price- Total price: Parts total: $0.00 Sublet total: $0.00 Freight total; $,0,00 Line total: $0.00 Line 11 Description: 5 Conclltlow QUALITY INSPECTION Correction-, Part description- city: Item price: Total price: Labor total: $0.00 Parts total: $0.00 Sublet total: $0.00 Freight total. $0.00, tine total: $0.00 Labor total Parts total Freight total Total of All Services $25,602.50 Shop supplies $67,043.60 Sublet total $3,760.00 Sales tax Page 2 of 2 Disclatmeir Estimate total: $96,656.10