HomeMy WebLinkAboutRES 24-015RESOLUTION NO. 24-015
BE IT RESOLVED BY THE CITY COUNCIL
OF THE CITY OF BEAUMONT:
THAT the City Manager be and he is hereby authorized to allow the repair of the ladder
on Unit number 7051, a 100-foot ladder truck for the Fire Department from Siddons Martin
Emergency Group in the amount of $96,656. 10.
The meeting at which this resolution was approved was in all things conducted in strict
compliance with the Texas Open Meetings Act, Texas Government Code, Chapter 551.
PASSED BY THE CITY COUNCIL of the City of Beaumont this the 23rd day of
January, 2024.
Siddons-Martin Emergency Group
9645 Jade Ave
Port Arthur, TX, 77640
USA
Phone: (409) 736-9077
Customer info: Document Info: Unlit Info:
Beaumont, City of Work order 11. 311-0000010132 job It: EA455 In / Out
P.O. Box 3827 Estimate date: 12/12/2023 VIN: 4PICT02S9VA000283 Hours: 0/0
Beaumont, TX, 77704 Service advisor: Chasetle Flowers Unit; LADDER Miles: 0/0
USA (AOKU)
Line It
I
Part description:
FLY SECTION
FREIGHT
Labor total: $15,400.00
Description:
Condition. REMOVE & INSTALL FLY SECTION OF LADDER
Correction,•
Parts total: $ 5 2,110.31 Sublet total: $01.00
Qty;
1.00
1.00
Frelglit total: $1,880.00
Line It Description:
2 Condition: REPAIR &REPLACE ELECTRICAL WIRES AND CABLE (IF NEEDED)
Correction:
Part description: Qty:
WIRING AND CABLES 1.00
Item price: Total price:
$52,11031 $52,110.31
$1,880,00 $1,880.00
Line! total., $,69,390.31
Item price: Total price:
$6,016.00 $6,0,16.00
Labor total: $8,662.50 Parts total: $6,016.00 Sublet total., $0.00 Freight total: $0.00, Line total: $14,678.50
Line It
Part description:
WATERWAY
CRATE CHARGE
Labor total: $1,540.00
Description:
Condition: REMOVE & INSTALL WATERWAY ON THE FLY SECTION OF LADDER
Correction:
Qty.
1.00
1100
Parts total. $8,917.29 Sublet total: $0.00 Freight total'. $1,880.00
Item price: Total price:
$8,917.29 $8,917,29
$1,880m $1,880.00
Line total: $12,337.29
Page I -of 2
Siddons-Martin Emergency Group
9645 Jade Ave
Port Arthur, TX, 77640
USA
Phone: (409) 736-9077
Document info: Work order 1h 311-0000010132
Line 11
4
Part description;
Labor total:
Description:
Condition: 132-P,OINT INSPECTION
Correction:
0' J
Qty: Item, price- Total price:
Parts total: $0.00 Sublet total: $0.00 Freight total; $,0,00 Line total: $0.00
Line 11 Description:
5 Conclltlow QUALITY INSPECTION
Correction-,
Part description- city: Item price: Total price:
Labor total: $0.00 Parts total: $0.00 Sublet total: $0.00 Freight total. $0.00, tine total: $0.00
Labor total
Parts total
Freight total
Total of All Services
$25,602.50 Shop supplies
$67,043.60 Sublet total
$3,760.00 Sales tax
Page 2 of 2 Disclatmeir
Estimate total: $96,656.10