HomeMy WebLinkAboutRES 23-378RESOLUTION NO. 23-378
BE IT RESOLVED BY THE CITY COUNCIL
OFTHE CITY OF BEAUMONT:
WHEREAS, on January 10, 2023, Council approved Resolution 23-018 awarding To-
Mex Construction, LLC, of Houston, Texas the Florida Avenue Emergency Sewer Repair
Project in the amount of $316,989,88; and,
WHEREAS, Change Order No. I was previously approved increasing the total contract
aniount to $322,489.85; and,
WHEREAS, Change Order No. 2, in the amount of $216,746.08, is requested for
additional unexpected construction site discoveries and requirements by Union Pacific Railroad
and the addition of 37 calendar days, thereby increasing the total contract amount to
$539,235,93;
NOW, THEREFORE, BE ITRESOLVED BY THE
CITY COUNCIL OF THE CITY OF BEAUMONT:
THAT the statements and findings set out in the preamble to this resolution are hereby, in
all things, approved and adopted; and,
THAT the City Manager be and lie is hereby authorized to execute Change Order No. 2
in the amount of $216,746.08 for work described above, thereby increasing the total contract
amount to $539,235.93 and adding an additional 37 calendar days to the contract time for the
Florida Avenue Emergency Sewer Repair Project.
The meeting at which this resolution was approved was in all things conducted in strict
compliance with the Texas Open Meetings Act, Texas Governincrit Code, Chapter 551.
PASSED BY THE CITY COUNCIL of (he City of BCaLlmont this the 12th day of
December, 2023,
N yaz• Roy W
.._ st.
RESOLUTION NO,23-018 .
CITY OF BEAUMONT:
WHEREAS, on November 30,2022, the City was made aware that a sewer main
failure: under the Union Pacific Railroad had resulted in a cavity that formed in the street
at West Florida Avenue and Avenue A; and,
NOW, THEREFORE, BE IT RESOLVED BY THE
CITY COUNCIL OF THE CITY OF BEAUMONT:-
THAT the City Manager be and he is Hereby authorized to -execute ail emergency
Qontract-With To,-Mex Construction, LLC, of Houston, Texas :in the amount of
$316,989.88 to complete repairs on the sewer..main. Th6.contraict is substantially in the
form attached hereto as Exhibit "A" and made a part hereof for'aill purposes.
The meeting at which this resolution was approved was in 111 things' conducted in
strict compliance with the Texas Open Meetings Act, Texas Government Code,, Chapter
551.
PASSED BY THE CITY. COUNCIL of the City of Beaumont this -the, I Oth day of
January, 2023.
.OV7 UM0 X��
dko �A-
-h outon -
r o
g
ji
Contract - 001.004
05-Dec-2023 12:52 PM CST
Florida 27" Railroad Sewer Replacement
1350 Langharn Rd. Beaumont, TX 77707
001.004: Change Order No. 2
Grand Totak $216,746.08
For 001 Construction Contract
Division 33
Line Item Unit price
Type
Group 3.0 Construction
Scope of To install: a replacement line for the 27-Inch sanitary sewer line under the railroad at Florida Avenue and Avenue A. This project will also
Work abandon the existing line and provide additional manholes.
Notes (PCO I)The steel casing increased in wall thickness after further railroad review of the plans. Additionally, plans were revised to show the
location of the 20-inch water line and for safety of the water line during construction, an exploratory excavation was warranted. Rail Pros
required additional shoring techniques that weren't clear prior to construction. An additional excavation and point repair to the sanitary
Irene was needed to bypass the 8-inch sewer line in conflict with the excavation pit. (PCO 2) Additional bypass pumping time was required
and at a higher flow rate than anticipated in the contract documents. The length of time was extended for the bypass pumping due to
unforeseen obstacles underground. There was excessive cement -stabilized material in the entry pit location and the nearby manhole
base was previously installed inoorrecOy. Bypass pumping was needed for installation of two of the manhole replacements as well.
Existing site conditions required additional asphalt repair outside of the scope of the emergency project. The increased cost of the overall
project required additional bonding by the Contractor. (PCO 3) Due to a design emission, the original cavity and a secondary one that
occurred during construction were required to be backfilled and repaired to meet Union Pacific Rail Road guidelines. (PCO 4) While
excavating on the eastern side of the tracks, a storm sewer line was found to be in need of replacement. Originally, it was thought that
the rail road inspection team would approve replacement under the same agreement for the sanitary sewer work. (PCO 5)The rail road
inspection team requested a separate agreement for the work on the storm sewer line, which required the Contractor to demobilize and
remobilize once Union Pacific Rail Road is In approval.
Awarded To To-Mex Construction LLC
Mahbel Torres
Reason Unforseen Site Conditions
Code
Days 37
Changed
Attachments
Change Order Summary
Original Contract Sum
Not Cost by Previous Approved COs
Contract Sum Before This CO
Contract Sun n Changed By This CO
New Contract Sum
All Change Orders make up 67.21% of the Original Contract
322,489.85 Substantial Completion Date
0,00 Net Time Change By Previous COs
322,489.85 Substantial Completion before This CO
216,746,08 Time Changed By This CO
539,235.93 New Substantial Completion Date
0 days
37 days
Linked PCO
PCO Type
Owner Requested
Owner Requested
Owner Requested
Owner Requested
Contractor Requested
PCO Number PCO Description
001.001
P,CO: Construction Contract
001,002
PCO: Construction Contract
001.003
PCO: Construction Contract
001.004
PCO: Construction Contract
001,005
PCO: Construction Contract
Accounting and Status
Accounting Status
Total Approved Cost
51,300,00
59,946,08
68,500.00
32,000.00
5,000.00
Item Id 466
PO Number 441223 FEMA Number
Accounting Project Code Custom Accounting Field 04
Custom Accounting Field 05 Custom Accounting Field 06
Custom Accounting Field 07 Custom Accounting Field 08
Wrori—Ir =1
Total Approved Days
10
5
10
10
2
Item # Account Code
WBSI Section
Description
Quantity UoM
Unit Price
Total Amount
Change Order
001
00000
PCO - 001.001
0.00
51,300.00
51,300.00
002
00000
PCO - 001.002
0.00
59,946.08
59,946.08
003
00000
PCO - 001.003
Mo
68,500.00
68,500.00
004
00000
PCO - 001.004
0.00
32,000.00
32,000.00
005
00000
PCO - 001,005
0.00
5,000�,00
5,000.00
Total
216,746.08
Approval Pending
Grand Total: 216,746.08
Due: 12-Dec-2023
Name or Role
I External -CC
2 Project Manager
3 City Engineer
4 Director
6 Admin
6 Assistant City Manager
7 City Clerk
Status
Approved
Maribel Torres
05-Dec-2023 1115 AM CST
Approved
John Pippins
05-Dec-2023 11:17 AM CST
Approved
Annalia "Molly" VillarreaG
05-Dec-2023 11:38 AM CST
Approved
Bart Bartkowiak
05-Dec-2023 12:46 P,M CST
Pending
Created by: John Pippins, on 04-Oct-2023 Last Modified by: Bart Barikowiak oil 05-Dec-2023
Actions
Waiting for previous approvals.
Waiting for previous approvals.
Contract # 001.003
05-Dec-2023 10:19 AM CST
Honda 27" Railroad Sewer Replacement
1350 Langham Rd. Beaumont, TX 77707
001.003: Change Order No. I - Supplemental Bid Item S-1
Grand Total: $0,00
For 001 Construction Contract
Division 33
Line Item Unit price
Type
Group 3,0 Construction
Scope of To install a replacement line for the 27-Inch sanitary sewer line under the railroad at Florida Avenue and Avenue A. This project will also
Work abandon the existing line and provide additional manholes.
Notes Change Order No. 1 is to add Supplemental Bid Item S-1 which was not added to the original Base Bid Items when awarded on January
10, 2023, but was added to the contract price when, entered into ProjectMat,es. To correct, Change Order No. I was done as a paper
change order to record the correct contract pricing. During construcflon, bypass pumping was needed at various times due to unforeseen
obstacles.
Awarded To To-Mex Construction LLC
Maribet Torres
Reason Errors and Omissions
Code
Days 0
Changed
Attachments Executed C-01 Florida Ave Ernerg Repairs.pdf
Revised Res. 23-018 Florida Ave Emergency Sewer Repair,pdf
Change Order Summary
Original Contract Sum,
Not Cost by Previous Approved Cos
Contract Sum Before This Co
Contract Sum Changed By This Co
New Contract Sum
All Change Orders make up 0.00%® of the Original Contract
Accounting and Status
322,489.85 Substantial Completion Date
0,00 Net Time Change By Previous Cos 0 days
322,489,85 Substantial Completion before This Co
0.00 Time Changed By This Co 0 days
322,489,85 Now Substantial Completion Date
Accounting Status
Item Id
PO Number
Accounting Project Code
Custom Accounting Field 05
Custom Accounting Field 07
Line Items
Item # Account Code
Approval Approved
Name or Role
I Admin
WBS/ Section
FEMA Number
Custom Accounting Field 04
Custom Accounting Field 06
Custom Accounting Field 08
Description Quantity UoM
Status
Approved
Dara Woodruff
05-Dec-2023 10:19 AM CST
Created by: Dara Woodruff on 05-Doc-2023 Last Modified by: Dara Woodruff on 05-Dec-2023
Unit Price Total Amount
Due: 12-Doo-2023
Actions