HomeMy WebLinkAboutRES 23-375RESOLUTION NO. 23-375
BE IT RESOLVED BY THE CITY COUNCIL
OF THE CITY OF BEAUMONT:
WHEREAS, on September 28, 2021, Council approved Resolution 21-234 awarding To-
Mex Construction, LLC, of Houston, Texas in the amount of $1,700,077,50 for the Basin 38 and
Surrounding Area Pipe Bursting Contract Project; and,
WHERE'AS, Change Orders Nos. 1-3 in the amount of $6,113.,02 increased the total
contract amount to $1,706,190.52; and,
WHEREAS, Change Order No. 4, in the amount of ($296,116.60), is required to adjust
the estimated quantities in the contract to reflect the actual quantities used and the addition of
147 calendar days to reflect the actual time used in. the competition of the project, thereby
decreasing the total contract amount to $1,410,073.92; and,
WHEREAS, the project has been inspected by the Water Utilities Staff and found to be
complete in accordance with the provisions and terms set forth in the contract;
NOW, THEREFORE, BE IT RESOLVED BY THE
CITY COUNCIL OFTHE CITY OF BEAUMONT:
THAT the statements and findings set out in the preamble to this resolution .are hereby, in
all things, approved and adopted; and,
THAT the City Manager be and he is hereby authorized to execute Change Order No. 4
in the amount of ($296,116,60) for work described above, thereby decreasing the total contract
amount to $1,410,073.92 for the Basin 38 and Surrounding Area Pipe Bursting Contract Project
and,
BE IT FUTHER RESOLVED THAT, the City manager is hereby authorized to make
final payment in the amount of $80,644.57 to'ro-mex Construction, I. of Houston, Texas.
The meeting at which this resolution was approved was in all things conducted in strict
compliance with the Texas Open Meetings Act, Texas Government Code, Chapter 551.
PASSED BY THE CITY COUNCIL of the City of Bea-uniont this, the 12th day of
December, 2023.
RESOLUTION NO. 21-234
WHEREAS, the City of Beaumont solicited bids for furnishing all labor, materials,
and equipment for the Basin 38 and Surrounding Area Pipe Bursting Contract Project,
me
WHEREAS, To -(hex Construction, LLC, of Houston, Texas, submitted a bid in
the amount of $1,700,077.50; and,
WHEREAS, the City Council is of the opinion that the bid, submitted by To-Mex
Construction, LLC, of Houston, Texas, is the lowest responsible bidder providing
services at the best value, to the City and should be accepted;
THAT the statements, and findings set out in the preamble to this resolution are hereby,
THAT the City Council hereby approves the award of a contract to To-Mex
Construction, LLC, of Houston, Texas, in the amount of $1,700,077.50, for the Basin 38
BE IT FURTHER RESOLVED THAT the City Manager be and he is hereby
authorized to execute a contract with To-Mex Construction, LLC, of Houston, Texas, for
the purposes described herein.
The meeting at which this resolution was approved was in all things conducted in
strict compliance with the Texas Open Meetings Act, Texas Government Code, Chapter
PASSED BY THE CITY COUINCIL of the City of: Beaumont this the 28th day of
September, 2021..
Alf
.cam
Mayor Robin Mouton -
27-Nov-2023 11:53 AM CST
BASIN 38 PIPE BURSTING PROJECT
1350 Langham Beaumont, TX 777011
Project Number WU0421-19
Grand Total: $-296,116.60
For 001 Basin 38 & Surrounding Area Pipe Bursting Project
Division 33
Line Item Unit price
Type
Group 4,0 Equipment/Closeout
Scope of Change Order No. 4 is being requested to adjust for additional quantities used in completing the project and removing the quantifies that
Work were not used. The project has been completed and inspected by City staff. Additional quantities were underestimated or found to be
required in the field. The items removed were either overestimated or found to be in satisfactory condition during construction. One
hundred forty-seven (147) additional calendar days are requested to account for supply chain issues with fiberglass manholes, delays
due to other utififies Obstructing progress, and the crew being pulled to assist on, the Calder Place Emergency Pipe Bursting Project.
Notes
Awarded To To-Mex Construction LLC
Maribel Torres
Reason Quantity Adjustment
Code
Days 147
Changed
Attachments
Updated Pending Pay Items for Basin 38 — 11 .07,23,pdf
Updated Pending Pay Items for Basin 38-11.07.23.xisx
Change Order Summary
Original Contract Sum 1,700:,077.50 Substantial Completion Date 22-Nov-2022
Net Cost by Previous Approved Cos 6,113.02 Net Time Change By Previous Cos 23 days
Contract Sum Before This CO V06,190.52 Substantial Completion before This CO 15-Dec-2022
Contract Sum Changed By This CO -296,116A0 Time Changed By This CO 147 days
Now Contract SUM 1,410,073.92 New Substantial Completion Date 1 1-May-2023
Ail Change Orders make up -17.06% of the Original Contract
Accounting and Status
Accounting Status
Item Id
PO Number
Accounting Project Code
Custom Accounting Field 0�5
Custom Accounting Field 07
Lily Items
477
430949 FEM.A Number
WWC019 Custom Aceor►nting Field 04
Custom Accounting Field 06
Custom Accounting Field 0,8
Item
WBSI
#
Account Code
Section
Description
3.0 Construction
002
GC
01000
FULL DEPTH REPAIR OF SIDE WALK (5`°)
CONSTRUCTION
003
GG
01000
FULL DEPTH REPAIR OF DRIVEWAY (6")
CONSTRUCTION
004
GC
01000
FULL DEPTH REPAIR OF CONCRETE PAVEMENT (10")
CONSTRUCTION
005
GO
01000
FLEXIBLE PAVEMENT STRUCTURE REPAIR (4')
CONSTRUCTION
006
GC
01000
TRENCH EXCAVATION PROTECTION
CONSTRUCTION
008
GC
01000
CHAIN LINK&: WOODEN FENCES, AND GATES, WITH
CONSTRUCTION
PROJECT MANAGERS APPROVAL
010
GC
01000
OBSTRUCTION REMOVAL BY EXCAVATION, ALL SIZES, ALL
CONSTRUCTION
DEPTHS,.
011
GC
01000
RECONNECT SERV CONNECTION BY EXCAVATION
CONSTRUCTION
INCLUDING CLEANOUTS TO LINER, COMPLETE, ALL SIZES
& DEPTH
012
GC
01000
FURNISH & INSTALL END-OF-LI'NE CLEANOUT BY
CONSTRUCTION
EXCAVATION
013
GC
011000
REMOVE & REPLACE OR INSTALL NEW STD, FIBERGLASS
CONSTRUCTION
MANHOLE, LESS THAN 5' DEPTH (ALL JOINTS &
CONNECTS)
014
GC
01000
REMOVE & REPLACE OR INSTALL NEW STD. FIBERGLASS
CONSTRUCTION
MANHOLE, LESS THAN 5' TO 8' DEPTH (ALL, JOINTSICONNE
015
GC
01000
REMOVE. & REPLACE OR INSTALL NEW STD. PRE -CAST
CONSTRUCTION
CONCRETE MANHOLE, c S DEPTH (ALL JOINTS &
CONNECTS)
016
GC
01000
REMOVE & REPLACE OR INSTALL NEW STD. PRE -CAST
CONSTRUCTION
CONCRETE MANHOLE, U TO 8" DEPTH (ALL
JOINTS&CONNECTS
Ulnit Total
Quantity UoM Price Amount
-19a23 SY 65.00-1,249.95
-1100.00 SY 65.00-6,500.00
-38.34 SY 80.00-3,067,20
35.35 SY 65.33 2,309.42
-1,196.00 LF 1.50-1,794.00
-1,200.00 LF 2.00-2,400.00
-20.00 EACH 350.00-7,000M0
-113.00 EACH 545.00-61,585.00
-7.00 EACH 553.00-3,871.00
1.00 EACH 3,833.00 3,833.00
-6.00 EACH 4,826.00-28,956.00
-7.00 EACH 4,826,00-33,782.00
-4.00 EACH 4„826.00-19,304.010
itern
WIBS/
4
Account Code
Section
Description
Quantity
UoM
017
GO
01000
EXTRA DEPTH NEW OR REPLACEMENT STD, MANHOLE,
-96.00
VF
CONSTRUCTION
OVER 8- DEPTH (PRE -CAST CONCRETE OR FIBERGLASS)
019
GO
01000
PIPE BURSTING 6"-8" SEWER TO 8.625" OD, ALL DEPTHS
-3,488.00
LF
CONSTRUCTION
020
GC
01000
PIPE BURSTING 10" SEWER TO 10.75" OD, ALL DEPTHS
-246.00
LF
CONSTRUCTION
021
GO
01000
PIPE BURSTING 15"' SEWER TO 16ff' OD, ALL DEPTHS
5.00
LF
CONSTRUCTION
Unit Total
Price Amount
35.00 -3,360.00
35.63 -124,277.44
38.98 -9,589,08
135.33 676.65
025 GO 01000 POINT REPAIR 1.00 EACH 3,800.00 3,800.00
CONSTRUCTION
Total
Approval Pending
Name or Role
Status
1 External -GC
Approved
Maribel Tones
16-Nov-2023 03:22 PM CST
2 Project Manager
Approved
Kevin Young
20-Nov-2023 08:01 AM CST
3 City Engineer
Approved
Arnalia "Molly" Villarreal
20-Nov-2023 11:13 AM CST
4 Director
Approved
Bart Bartkowlak
27-Nov-2023 08:40 AM CST
5 Aclrnin
Pending
Created by: Kevin Young on 13-Nov-2023 Last Modified by: Bart Bartkowiak on 27-Nov-2023
-296,116.60
Grand Total: -296,116.60
Actions
Due, 4-Dec-2023
Contract # 001.003
05-S a p-2023 07:39 AM CST
001.003: 001.003: Change Order No. 3
BASIN 38 PIPE BURSTING PROJECT
1350 Langharn Beaumont, TX 77701
Project Number: WU0421-19
Grand Total: $-7,025.98
For 001 Basin 38 & Surrounding Area Pipe Bursting Project
Division 33
Line Item Unit price
Type
Group 3.0 Construction
Scope of Change Order No. 3 will reflect a decrease in the amount of $7,025.98 and is requested to add additional quantities to four (4) bid items
Work and subtract quantities from one: (1) bid !tern to reflect actual quantities used in the field. Additional asphait repair and pipe removal were
added due to underestimating the quantity at the time of design. Fiberglass manholes were substituted for pre -Gast manholes based on
their field location.
Notes
Awarded To To-Mex Construction LTC
Maribel Torres
Reason Quantity Adjustment
Code
Days 0
Changed
Attachments
Pending Pay Items for Basin 38.pdf
Change Order Summary
Original Contract Sum 1,700,077,50 Substantial Completion Date 22-Nov-2022
Net Cost by Previous, Approved COs 13,139.00 Net Time Change, By Previous COs 23 days
Contract Sum Before This CO 1,713,216.50 Substantial Completion before This CO 15-Dec-2022
Contract Sum Changed By This CO -7,025.98 Time Changed By This CO 0 days
New Contract Surn 1,706,190.52 New Substantial Completion Date 15-Dec,2022
All Change Orders make up 0.36% of the Original Contract
Accounting and Status
Accounting Status
Item Id 443
PO Number 430949 FEMA Number
Accounting Project Code WWC019 Custom Accounting Field 04
Custom Accounting Field 05 Custom Accounting Field 06
Custom Accounting Field 07 Custom Accounting Field 08
_I - IM111PAR
Item
WBSI
#
Account Code
Section
Description
3.0 Construction
005
GC
01000
FLEXIBLE PAVEMENT STRUCTURE REPAIR (4")
CONSTRUCTION
013
GC
01000
REMOVE & REPLACE OR INSTALL NEW STD. FIBERGLASS
CONSTRUCTION
MANHOLE, LESS THAN,-)' DEPTH (ALL JOINTS & CONNECTS)
016
GC
01000
REMOVE & REPLACE OR INSTALL NEW STD. PRE -CAST
CONSTRUCTION
CONCRETE MANHOLE, 5- TO 8- DEPTH (ALL
JOINTS&CONNECTS
018
GC
01000
ABANDON MANHOLE
CONSTRUCTION
023
GC
01000
REMOVE 5" PIPE
CONSTRUCTION
Total
. . ........... . ... . . ..... .. . ...... . ......... . . .... . .............. .
Approval Approved
Name or Role
Status
I External -GC
Approved
Maribel Torres
15-Aug-2023 12A5 FM CST
2 Project Manager
Approved
John Pippins
15-Aug-2023 01: 19 PM CST
3 City Engineer
Approved
Amalia "Molly" Villarreal
15-Aug-2023 01::24 PM CST
4 Director
Approved
Bart Bartkowiak
16-Aug-2023 09:04 AM CST
5 Admin
Approved
Dara Woodruff
16-Aug-2023 09:09 AM CST
Unit Total
Quantity UoM Price Amount
5,66 SY 6533 369.77
8,00 EACH 3,833.00 30,664.00
-8.00 EACH 4,826.00 -38,608.00
1.00 EACH 500.25 500,25
6.00 LF 8.00 48.00
-7,025.98
Grand Total; -7,025.98
Due: 23-Aug-2023
Actions
Name or Role Status Actions
6 Assistant City Manager Approved
June Ellis
16-Aug-2023 11:08 AM CST
7 City Glory
Approved
Tina Broussard
16-Aug-2023 1125 AM CST
Created by: Kevin Young on 14-Aug-2023 Last Modified by: Tina Broussard on 16-Aug-2023
Contract 4 001.002
23-Mar-2023 10:34 AM CST
0101,002: Change Order No. 2
BASIN 38 PIPE BURSTING PROJECT
1350 Langharn Beaumont, TX 77701
Project Number: WU0421 -19
Grand Total: $8,800.00
For 001 Basin 38 & Surrounding Area Pipe Bursting Project
Division, 33
Line Item Unit price
Type
Group 3.0 Construction
Scope of Change Order No. 2 will add two (2) additional bid items not originally a part of the project, to safely maneuver around other utilities and
Work due to unforeseen site conditions. Item 24 to excavate approximately 20'on each side of MH-251 to relocate a safe distance away from
Entergy's power pole, and Itern 25 for a point repair required to work around a storm drain manhole on Map 6.
Notes
Awarded To To-Mex Construction LLC
Maribel Torres
Reason Unforseen Site Conditions
Code
Days 8
Changed
Attachments B38 Map 5 & 6.pdf
EXTERNAL Basin 38 Quote.pdf
Change Order Summary
Original Contract Sum
11,700,077.50 Substantial Completion Date
22-Nov-2022
Net Cost by Previous Approved Cos
4,339.00 Not Time Change By Previous Cos
15 days
Contract Sum Before This CO
1,704,416.501j Substantial Completion before This CO
7-Dec-2022
Contract Sum Changed By This CO
8,800.00 Time Changed By This, CO
8 days
New Conti -act Sum
1,713,216.50 New Substantial Completion Date
16-Dec-2022
All Change Orders make up 0,77% of the Original Contract
Accounting and StatUS
Accounting Status
Item Id
353
PO Number
430949 FEMA Number
Accounting Project Code
WWC019 Custorn Accounting Field 04
Custom Accounting Field 05
Custom Accounting Field 06
Custom Accounting Field 07
Custom Accounting Field 08
Line Items
Item # Account Code WBS1 Section Description
3.0 Construction
024 GC CONSTRUCTION 01000
025 GC CONSTRUCTION 01000
Total
Approval Approved
Name or (Role
1 External -GC,
2 Project Manager
3 City Engineer
4 Director
5 Admin
6 June Ellis
City of Beaumont
7 City Clerk
20'EXCAVATION ON SIDE OF MANHOLE
POINT REPAIR
Status
Approved
Madbel Torres
15-Feb-2023 09:44 AM CST
Approved
John Pippins
15-Feb-2023 02:25 PM CST
Approved
Arnalia "Molly" Villarreal
21-Feb-2023 01:09 PM CST
Approved
Bart Bartkowiak
22-Feb-2023 09:22 AM CST
Approved
Dara Woodruff
22-Feb-2023 09:54 AM CST
Approved
June Ellis
22-Mar-2023 04:37 PM CST
Approved
Tina Broussard
23-Mar-2023 09:44 AM CST
Created by: Kevin Young an 10-Feb-2023 Last Modified by: Tina Broussard on 23-Mar-2023
Quantity UoM Unit Price Total Amount
2.00 EACH 2,500.00 5,0W00
1.00 EACH 3,8W00 3,800.00
8,800.00
Grand Total: 8,800.00
Due: 30-Mar-2023
Actions
Contract - 001.001
22-Nov-2022 02A4 P'M CST
BASIN 38 PIPE BURSTING PROJECT
11360 Langham Beaumont, TX 77701
Project Number: WU0421-19
001.001: Change Order No. I
Grand Total: $4,339M
For 001 Basin 38 & Surrounding Area Pipe Bursting Project
Division 33
Line Item Unit price
Type
Group 3,0 Construction
Scope, of To add two (2) additional bldl items for the following reasons, - open -cutting the line between MH825 adn M,H792 because the gas line Is
Work to close to the sanitary sewer line to pipe burst. • Remove 6" pipe between MI-19 and MH 8 In order to pipe burst the line.
Notes
Awarded To To-Mex Construction LILC
Maribet Torres
Reason Unforseen Site Conditions
Code
Days 15
Changed
Attachments
City of Beaumont Basin: 38 Open, Cut QuoteJ0.27.2022.pdf
City of Beaumont Basin 38 Removal of 6-In. Pipe QuoteJO .... 022.pdf
Change Order I Plans (Execute,d).pdf
Change Order Summary
Original Contract Sum 1,700,077,50 Substantial Completion Date
Not Cost by Previous Approved Cos OM 910 Net Time Change By Previous COs
Contract Sum. Before This CO 1,700,077.50 Substantial Completion before This CO
Contract Sum Changed By This CO 4,339M Time Changed By This CO
New Contract Sum 1,704,418.50 Now Substantial Completion Date
All Change Orders make tip 0.26% of the Original Contract
Accounting and Status
Accounting Status
22-Nov-2022
0 days
22-Nov-2022
16 days
7-Deo-2022
Itom Id 316
i
PO Numbor 430940 FEMA Number
Accounting Project Code VVwC019 Custom Accounting Field 04
Custom Accounting Field 06 Custom Accounting Field 06
Custom Accounting Field 07 Custom Accounting Field 08
Line Items
Item II Account Code WBSI Section Description Quantity UaM Unit. Price Total Amount
3.0 Construction
022 GC CONSTRUCTION 01000 OPEN CUT 75.00 LF 25.00 1,875.00
023 GC CONSTRUCTION 01000 REMOVE 5" PIPE 3W00 LF 8.00 2,464.00
Total � 4,339.00
Grand Total:4,339.010
,ApproValApproved
Duo: 28-Nov-2022
Namo or Rolo Status Actions
1 External -GC Approved'
Maribel Torres
18-Nov-2022 02:25 PM CST
2 Project Manager Approved
Kevin 'Young
18-Nov-2022 02:26 PM CST
3 City Engineer Approved
Amila "Molly" Vdiarreal
184Nov-2022 03:55 PM CST
4 Director Approved
Bart Badkowlak
21-Nov-2022 08:37 AM CST
5 AdmIn Approved
Dara 'WVbodrult
21-Nov-2022 09:09 AM CST
APPROVED BY: A STED BY.
N 1' Se:AA
Kelrrxetlti R,WilBiams Date *We*' V i Broussard Date
City Manager r S"Ierk
;0(0wwwwr
Invoice 4 001.014
04-Dec-2023 09:54 AM CST
BASIN 38 PIPE BURSTING PROJECT
1350 Langliam Beaumont, TX 77701
Project Number: WU0421-19
001.0'14: To-Mex Construction LLC - Basin 38 & Surrounding Area Pipe Bursting Project
Amount but: $80,644,57
For Contract
Contract - 001 Basin 38 & Surrounding Area Pipe Bursting Project
Date
27-Nov-2023
Line Item Type
Unit price
Group
3.0 Construction
Pay Period
01-Jun-2023 to 27-Nov-2023
Retainage
WC 5.00 - MS 0.00
Payment To
To-Mex Construction LLC
Mardbel Torres
Date Due
Terms
Attachments
Line Items
Work Materials
Item WBS/ Contract Previous Unit Completed Stored WC %MS
# Account Code Section Description Total Payments Quantity UoM Price (WC) (MS) Totai Retalnage Retainage
001.003: Change Order No, 3 - 3.0 ConstrucCon
005
GO
01000
FLEXIBLE
5,66 @
369.77
0.00 SY 65.33
0J)0
0.00
369.77
0.00
0.00
CONSTRUCTION
PAVEMENT
65,33
STRUCTURE
REPAIR (4-)
013
GC
01000
REMOVE&
8.00 @
30,66C00
0,00 EAC14 3,83100
0.00
0.00
30,6164.00
0.00
0.00
CONSTRUCTION
REPLACE OR
3,833,00
INSTALL NEW STD,
FIBERGLASS
MANHOLE, LESS
THAN 5' DEPTH (ALL
JOINTS &
CONNECTS)
016
GO
01000
REMOVE&
-8,00(0)_
0,00
0,00 EACH 4,826.00
-38.608.00
0.00
-38,608.00
OMO
0.00
CONSTRUCTION
REPLACE OR
4.826.00
INSTALL NEW STD.
PRE -CAST
CONCRETE
MANHOLE, 5- TO 8'
DEPTH (ALL
JOINTS&CONNECTS
018
GC
01000
ABANDON
1.00 @
500.25
0,00 EACH 500,25
0.00
0.00
500,25
0.00
0,00
CONSTRUCTION
MANHOLE
600.25
023
GC
01000
REMOVE 5" PIPE
6.00 @ 8.00
48,00
0.00 LF 8,00
0.00
0,00
48,00
0=
0,00
CONSTRUCTION
Total
....... .. . .
-7,025.98
31,582.02
-38,608.00
0.00
-7,025.98
Work Materials
Item WWBSI Contract Previous Unit. Completed Stored % WC Am MS
# Account Code Section Description Total Payments Quantity UoM Price (WC) (MS) Total Retainage Retainage
001.004: Change Order No. 4 - 3.0 Construction
002
GC
01000
PULL DEPTH
-19.23 @
CONSTRUCTION
REPAIR OF SIDE
65.00
WALK (& j
003
GO
01000
FULL DEPTH
-100,00 @
CONSTRUCTION
REPAIR OF
65.00
DRIVEWAY (6")
004
GO
01000
FULL DEPTH
-38,34 @
CONSTRUCTION
REPAIR OF
80.00
CONCRETE
PAVEMENT (10-)
005
GC
01000
FLEXIBLE
35,35 @.
CONSTRUCTION
PAVEMENT
65.33
STRUCTURE
REPAIR (4")
006
GC
101000
TRENCH
-1,196.00 @
CONSTRUCTION
EXCAVATION
1.50
PROTECTION
008
GC
01000
CHAIN LINK &
-1,200.00
CONSTRUCTION
WOODEN FENCES,
2,00
AND GATES, WITH
PROJECT
MANAGERS
APPROVAL
010
GC
01000
OBSTRUCTION
-20.00 ca
CONSTRUCTION
REMOVAL. BY
350.00
EXCAVATION,, ALL
SIZES, ALL DEPTHS,
011
GC
01000
RECONNECT SERV
-113,00 @
CONSTRUCTION
CONNECTION BY
545.00
EXCAVATION
INCLUDING
CLEANOUTS TO
LINER, COMPLETE,
ALL SIZES & DEPTH
012
GC
01000
FURNISH & INSTALL
-7.00 @
CONSTRUCTION
END -OF -LINE
553.00
CLEANOUT BY
EXCAVATION
013
GC
01000
REMOVE &
1.00 @
CONSTRUCTION
REPLACE OR
3,833.00
INSTALL NEW STD.
FIBERGLASS
MANHOLE, LESS
THAN 5" DEPTH (ALL
JOINTS &
CONNECTS)
014
GC
01000
REMOVE &
-6.00 @
CONSTRUCTION
REPLACE OR
4�826.00
INSTALL NEW STD.
FIBERGLASS
MANHOLE, LESS
THAN V TO 8"
D'EPTH(ALL
JOINTSICONNE
0.00 0.00 SY 65.00-1.249.95 0.00-1.249.95 0.00 0.00
0.00 0.00 SY 65.00-6,500.00 0.00-6,500.00 0.00 0,00
0.00 0,00 SY 80.00-3.067.20 0.00-3,067.20 0.00 0.00
0.00 0.00 SY 65.33 2,309.42 0.00 2,309A2 0.00 0.00
0,00 0,00 LF 1.50-1,794.00 0.00-1,794,00 0,00 0.00
0.00 0,.00 LF 2.00 -2 400.00 0.00-2,400.00 0.00 0.00
0.00 0.00 EACH 350.00-7,000.00 0.00-7,000„00 0.00 0,00
0.00 0.00 EACH 545.00-61,585.00 0.00-61,585,00 0,00 0.00
0.00 0.00 EACH 553.00-3,871.00 0.00-3.871.00 0.00 0.00
0.00 0.00 EACH 3,833.00 3,833.00 0.00 3,833.00 0.00 0.00
0.00 0.00 EACH 4,826.00-28,956.00 0.00-28,956.00 0.00 0.00
Work Materials
Item
WBS/
Contract
Previous
Unit
Completed
Stored
WC
of MS
4
Account Code
Section
Description
Total
Payments Quantity
UoM Price
(WC)
(MS)
Total Retainage.
Retainage
015
GG
01000
REMOVE&
-7.00 @
0,00
0.00 EACH 4,826.00
-33,782,00
M00
-33,782.00
0.00
0,00
CONSTRUCTION
REPLACE OR
4,826.00
INSTALL NEW STO,
PRE -CAST
CONCRETE
MANHOLE, < 5'
DEPTH (ALL JOINTS
& CONNECTS)
016
GC
01000
REMOVE &
-4.00 @
01.00
0.00 EACH 4,826.00
-19,304.00
0.00
-19,304.00
0.00
0.00
CONSTRUCTION
REPLACE OR
4,826.00
INSTALL NEW S'TD.
PRE -CAST
CONCRETE
MANHOLE, 5'TO 8'
DEPTH (ALL
JOINTS&CONNECTS
017
GC
01000
EXTRA DEPTH NEW
-96.00 @
0.00
0.00 VF 35.00
-3.360,00
0,00
-3,360.00
0,00
0,00
CONSTRUCTION!
OR REPLACEMENT
35.00
STD. MANHOLE,
OVER 8'DEPTH
(PRE -CAST
CONCRETE OR
FIBERGLASS)
019
(3c
01000
PIPE BURSTING
.3,488.00 @
0.00
0.00 LF 35,63
-124,277.44
0.00
-124,277,44
0,00
0,00
CONSTRUCTION
6"-8" SEWER TO
35-63
8.625- OD, ALL
DEPTHS
020
GC
01000
PIPE BURSTING 10"
-246.00 @
0.00
0.00 LF 38,96
-9,589m
0,00
-9,589,08
0.00
0.00
CONSTRUCTION
SEWER TO 10,75
38.98
OD, ALL DEPTHS
021
GC;
01000
PIPE BURSTING 15"
5.00 @
0.00
0.00 LF 135.33
676.65
0.00
676.65
0.00
0.00
CONSTRUCTION
SEWER To 16.0'
135.33
OD, ALL DEPTHS
025
GC
01000
POINT REPAIR
1.00 @
0.00
0.00 EACH 3.800.00
3,800.00
0.00
3,800,00
0.00
0.00
CONSTRUCTION
3,800.00
Total
.296,116.60
0,00
-296,1113.60
0.00
... . . ..... . . . .....
-296,116.60
3.0 Construction
001
GC Contract
01000
MOBILIZATION
1.00 @
5,500.00
0.00 LS 5,500.00
0.00
0.00
5,500m
0.00
0.00
002
GC
01000
FULL DEPTH
CONSTRUCTION
REPAIR OF SIDE
WALK (5")
003
GG
01000
FULL DEPTH
CONSTRUCTION
REPAIR OF
DRIVEWAY (W)
004
GC
01000
FULL DEPTH
CONSTRUCTION
REPAIR OF
CONCRETE
PAVEMENT (10')
005
GC
01000
FLEXIBLE
CONSTRUCTION
PAVEMENT
STRUCTURE
REPAIR (4-)
006
GC
01000
TRENCH
CONSTRUCTION,
EXCAVATION
PROTECTION
5,500.00
25.00 @ 375.05 0.00 SY 65.00 1,249.95 0.00 1,625.00 0.00 0.00
65.00
100.00 @ 01.00 0.00 SY 65.00 6,500.00 0,00 6'500m 0.00 0.00
65.00
50.00 @_ 932.80 0,00 SY 80.00 3,067.20 0.00 4,000.00 0.00 0.00
80.00
500.00 @ 32,609.47 0,00 SY 65.33 55.53 0.00 32,665.00 0.00 0.00
65.33
1,500.00 @ 456,00 0.00 LF 1.50 1,794.00 0.00 2,250,00 0.00 0.00
1.50
Work Materials
Item WBSI Contract Previous Unit Completed Stored !m WC % MS
4 Account Code Section Description Total Payments Quantity UoM Price (WC) (MS) Total Retaina0e IR'etaina0e
007 GC 01000 BARRICADES, 1,00 @ 1,535.00 0,00 LS 1,535.00 0.00 0.00 1,535,00 0.00 0,00
CONSTRUCTION SIGNS AND 1,535.00
TRAFFIC HANDLING
008
GC
01000
CHAIN LINK &
1,200.00 @
0.00
0.00 LF 2.00
2„400.00
0.00
2,400.00
CONSTRUCTION
WOODEN FENCES„
2.00
AND GATES, WITH
PROJECT
MANAGERS
APPROVAL
009
GC
01000
CLEAN & TEILE'ViSE
2,400.00 ca
8,640.00
0.00 L.F 3.60
0.00
0,00
6,640,00,
CONSTRUCTION
SEWER ALL SIZES &
3.60
DEPTHS,AS
DIRECTED BY THE
OWNERS
010
GC
01000
OBSTRUCTION
75.00 @
19,250.00
0.00 EACH 350.00
7,000,00
0,00
26,250.00
CONSTRUCTION
REMOVAL BY
350.00
EXCAVATION, ALL
SIZES, ALL DEPTHS,
011
GC
01000
RECONNECT'SFRV
406.00@
159,685.00
0,00 EACH 545,00
61,585.00
0.00
221,270.00
CONSTRUCTION
CONNECTION BY
545.00
EXCAVATION
INCLUDING
CLEANOUTS TO
LINER, COMPLETE,
ALL SIZES & DEPTH
012
GC
01000
FURNISH & INSTALL
11,00 @
2,212.00
0,00 EACH 553,00
3,871.00
0.00
6,083.00
CONSTRUCTION
END -OF -LINE
553.00
CLEANOUT BY
EXCAVATION
013
OC
01000
REMOVE &
29,00 c@
111,157,00
0.00 EACH 3,833.00
0.00
0.00
111,157.00
CONSTRUCTION
REPLACE OR
3.,833.00
INSTALL NEW STD.
FIBERGLASS
MANHOLE, LESS
THAN 5' DEPTH (ALL.
JOINTS &
CONNECTS)
014
GC
01000
REMOVE &
18.00 @
57,912.00
0.00 EACH 4,826.00
28,956.00
0.00
86„868.00
CONSTRUCTION
REPLACE OR
4,826.00
INSTALL NEW STD.
FIBERGLASS
MANHOLE, LESS
THAN V TO 8'
DEPTH (ALL
JOINTSICONNE
015
GC
01000
REMOVE &
19,00 @
57,912.00
0.00 EACH 4,826.00
33,782,00
0.00
91,694.00
CONSTRUCTION
REPLACE OR
4,826.00
INSTALL NEW STD.
PRE -CAST
CONCRETE
MANHOLE, < 5'
DEPTH (ALL JOINTS
& CONNECTS)
016
GC
01000
REMOVE &
36.00 re,
115,824.00
0.00 EACH 4,826.00
57,912,00
0,00
173,736.00
CONSTRUCTION
REPLACE OR
4,826.00
INSTALL NEW STD.
PRE -CAST
CONCRETE
MANHOLE, 5' TO 8'
DEPTH(ALL
JOINTS&CONNECTS
0.00 0,00
0.00 0.00
0,00 0,00
0.00 0.00
0.00 0,00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
Work Materials
Item
WBSf
Contract
Previous
Unit.
Completed
Stored
% WC
% MS
4
Account, Cede
Section
Description
Total
Payments Quanfity
UoM
Price
(WC)
(MS)i
Total R'etainage
Reta6narge
017
GC
01000
EXTRA DEPTH NEW
100.00 @
140.00
0.00
VF
35.00
3,360.00
0.00
3,500.00
0.00
0.00
CONSTRUCTION
OR. REPLACEMENT
35,00
STD. MANHOLE,
OVER B' UEPTH'
(PRE -CAST
CONCRETE OR
FIBERGLASS)
018
GC
01000
ABANDON
3.00 @
1,500.75
0.00
EACH
500.25
0.00
0.00
1„500.75
0.00
0.00
CONSTRUCTION
MANHOLE
500,25
019
GC
01000
PIPE BURSTING
21„900.00 @
656,019.56
0.00
LF
35.63
124,277.44
0.00
780,297.00
0.00
0.00
CONSTRUCTION
6"-8"SEWER TO
35,63
8.625" OD, ALL
DEPTHS
020
GC
01000
PIPE BURSTING 10"
2,100.00 @
72,26892
0.00
LF
38,98
9,589,08
0.00
81,858.00
0.00
0.00
CONSTRUCTION
SEWER TO 10.75"
38.98
OD, ALL DEPTHS
021
GC
01000
PIPE BURSTING 15"
375,00 @
50,74835
0.00
LF
135.33
0.00
0.00
50,748.75
0.00
0.00
CONSTRUCTION
SEWER TO16.0"
135.33
OD, ALL DEPTHS
Total
Change Order No. 1 - 3.0 Construction
022
GC
01000
OPEN CUT
CONSTRUCTION
023,
GC
01000
REMOVE 5" PIPE
CONSTRUCTION
Total
Change
Order No. 2 - 3.0
Construction
024
GC
01000
20' EXCAVATION ON
CONSTRUCTION
SIDE OF MANHOLE
025
GO
01000
POINT REPAIR
CONSTRUCTION
Total
Summary
1,700,077.50 1,354,678.30
75.00 @ 1,875.00 0,00 LF 25.00
25.00
308.00 @ 2,464.00 0,00 LF 8.00
8.00
4,339.00 4,339.00
2.00 @ 5,000.00 0.00 EACH 2,500.00
2,500.00
1,00 @ 3,800.00 0.00 EACH 3,800.00
3,800.00
8,800,00 8,800,00
1. CONTRACT SUM +AMENDMENTS
2. NET CHANGE BY Change Order
3, CONTRACT SUM TO DATE (Line 1+ Line 2)
4, TOTAL COMPLETED & STORED TO DATE
5, RETAINAGE
58, 5.00% Of Completed Work (Column I on Continuation Sheet)
5b, 0,00% Of Stored Material (Column J on Continuation Sheet)
TOTAL RETAINAGE (5a + 5b)
6, TOTAL EARNED LESS TOTAL RETAINAGE
7. LESS PREVIOUS CERTIFICATES FOR PAYMENT
8. CURRENT AMOUNT DUE
9. BALANCE TO FINISH, INCLUDING RETAINAGE (Line 3 less Line 6)
345,399.20 0.00 1,700,077.50
0.00 0.00 1,875.00 0.00 0.00
01.00 0.00 2,464.00 0.00 0,00
0,.00 0.00 4,339.00
0.00 0.00 5,000.00 0.00 0.00
0.00 0.00 3,800.00 0.00 0.00
0.00 0.00 8,800.00
Grand Total: 510,674.60
0.00
0.00
1,700,077.50
290,003,58
1,410,073,92
1,410,073.92'.
0,00
1,410,073.92
1.329,429,35
$80„644.57
0.00
Change Order Summary
NET CHANGE by Change Order
Total changes approved in previous pay periods
Total approved this pay period
TOTAL
Accounting and Payment Status
Invoice Id
Payment Status
Paid Date
PO Number
Accounting Project Code
Custom Accounting Field 05
Custom Accounting Field 07
Approval mending
Name or Role
I
Inspector
2
Project Manager
3
City Engineer
4
Director
5
Admin
866
Check Ns
Paid Amount
430949 FEIVIA Number
WWC019 Custom Accounting Field 04
Custorn Accounting Field 06
Custorn Accounting Field 08
Status
Approved
Terry Croft
29-Nov-2023,07:06 AM CST
Approved
Kevin Young
29- Nov-2023 08:16 AM CST
Approved
Amalia "Molly'" Villarreal
29-Nov-2023 09:17 AM CST
Approved
Bad Bartkowiak
29-Nov-2023 09:17 AM CST
Pending
Created by: Kevin Young on 27-Nov-2023 Last Modified by: Hart [3adkowiak on 29-Nov-2023
$-290,003,58
ADDITIONS
DEDUCTIONS
44,721.02
-38,608.00
10,619,07
.............
-306,735.67
. .......... ......... . .. ....... . .. . . . ......
55,340.09
-345,343.67
Actions
$0,00
Due: 6-Dec-2023