HomeMy WebLinkAboutRES 23-341RESOLUTION NO. 23-341 BE IT RESOLVED BY THE CITY COUNCIL WHEREAS, on April 18, 2023, the City Council of the City of Beaumont, Texas passed Resolution No. 23-104 awarding a contract in the amount of $1,348,440.00 to Viking Painting, LLC, of La Vista, Nebraska, for the Southwest Elevated Storage Tank Rehabilitation Project; and, WHEREAS, Change Order No. 1, in the amount of $18,378.00, is required to install a conduit for proposed tank mixer and to add a logo to the south face of the tank. A total of five (5) calendar days are requested to be added to the contract for the additional work. If approved, Change Order No. 1 will result in no change to the current contract amount. NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF BEAUMONT: THAT the statements and findings set out in the preamble to this resolution are hereby, in all things, approved and adopted; and, THAT the City Manager be and he is hereby authorized to execute Change Order No. 1, for additional work described above for the Southwest Elevated Storage Tank Rehabilitation Project; and, The meeting at which this resolution was approved was in all things conducted in strict compliance with the Texas Open Meetings Act, Texas Governinent Code, Chapter 551. PASSED BY THE CITY COUNCIL of the City of Beaumont this the 21st day of November, 2023. �M®Ilry� J �j1 Contract # 002.001 07-Nov-2023 08:25 AM CST South West Tank Rehabilitation 1350 Langham Rd Beaumont, TX 77707 Project Number: WU0123-08 002.001. Change Order 1 Grand Total: $0.00 For 002 South West Tank Rehab - Cons. Division 33 Line Item Unit price Type Group 3.0 Construction Scope of This Change Order is to install a conduit for the proposed tank mixer and to add an additional logo facing south on the tank. Work Notes Awarded To Viking Industrial Painting, LLC Luan Ha 28352 Reason Owner Requested Code Days 5 Changed Attachments Change Order Summary Original Contract Sum Net Cost by Previous Approved COs Contract Sum Before This CO Contract Sum Changed By This CO Now Contract Sum All Change Orders make up 0.00% of the Original Contract Accounting and Status Accounting Status Item Id 1,348,440,00 !Substantial Completion Date 0,00 Net Time Change By Previous COs 0 days 1,348,440.00 i Substantial Completion before This CO 0.00 j Time Changed By This CO 5 days I 1,348,440.00 New Substantial Completion Date 473 PO Number Accounting Project Code Custom Accounting Field 05 Custom Accounting Field 07 Line Items Item Account WSW # Code Section Contract Items 019 330000 020 330000 021 330000 Total 441224 Description FEMA Number Custom Accounting Field 134 Custom Accounting Field 06 Custom Accounting Field Oa Miscellaneous Tank Repairs Install new buried 1" electrical conduit from the power panel to the dry riser. Repair coating Paint one additional logo Unit Total Quantity UoM Price Amount -0.74 ALLOW 25,000.00-18.378,00 1.00 LS 10,778.00 10,778.00 1.00 LS 7,600.00 7,600.00 0,00 Grand Total: 0.00 Approval Pending Due: 14-Nov-2023 Name or Role 1 External -GC 2 External -Engineer 3 Project Manager 4 City Engineer 5 Director 6 Admin 7 Assistant City Manager 8 City Clork Status Actions Approved Luan He 06-Nov-2023 09:17 AM CST Approved Jeff Beaver 06-Nov-2023 02:54 PM CST Approved John Pippins 06-Nov-2023 04:07 PM CST Approved Amalia "Molly" Villarreal 06-Nov-2023 04:59 PM CST Approved Bart Bartkowiak 07-Nov-2023 08:21 AM CST Pending Waiting for previous approvals. Waiting for previous approvals. Created by: John Pippins on 27-Oct-2023 Last Modified by: Bart Bartkowiak on 07-Nov-2023 Page is too large to OCR. Page is too large to OCR. Page is too large to OCR.