HomeMy WebLinkAboutRES 23-353RESOLUTION NO. 23-353 BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF BEAUMONT: WHEREAS, on August 15, 2023, the City Council of the City of Beaumont, Texas passed Resolution No. 23-226 awarding a contract in the amount of $327,285.00 to MK Constructors, of Vidor, Texas, for the Jefferson Street Infrastructure Repair Project; and, WHEREAS, Change Order No, 1, in the amount of $22,768.00, is required to modify the scope of work regarding the sanitary sewer manliole called out to be removed and replaced due to two (2) storm sewer lines being tied into it, thereby increasing the total contract an- ount to $350,053,00; NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF BEAUMONT: THAT the statements and findings set out in the preamble to this resolution are hereby, in all things, approved and adopted; and, THAT the City Manager be and he is hereby authorized to execute Change Order No, 1, for additional work described above thereby increasing the total contract amount to $350,053.00, for the Jefferson Street Infrastructure Repair Project. The meeting at which this resolution was approved was in all things conducted in strict compliance with the Texas Open Meetings Act, Texas Government Code, Chapter 551. PASSED BY THE CITY COUNCIL of the City of Beaumont this the 21 st day of November, 2023, Mayur ilwy W r5L - Contract # 002.001 08-Nov-2023 08:05 AM CST Jefferson Street Infrastructure Repair Project 801 Main Street Beaumont, Texas 77701 Project Number: PW0723-11 002.001: Change Order No. 1 Grand Total: $22.768.00 For 002 Jefferson Street Infrastructure Repair Construction Division 01 Line Item Unit price Type Group 3.0 Construction Scope of The Sanitary Sewer manhole called out in the plans to be removed and replaced due to two storm lines being tied in will be left in place, Work After inspection by the Water Utilities inspector and conversation with MK Contractors, it was decided that the storm lines could be removed without causing damage to the manhole and an effective patch could be made where the lines were tied in. MK Contractors will then remove the brick riser (approx. 18 inches) and replace it with concrete risers to grade. The existing ring and coverwill also be replaced by MK Contractors. The fiberglass manhole has already been ordered by MK and was delivered to the site. This manhole will become the City's to be used on another project and will need to be picked up from the site by the waterlsewer department. This Change Order is also needed to account for additional sidewalk and sidewalk ramps. Existing sidewalk that is tied into driveways that are being disturbed during construction must be removed and replaced to correct grade issues in order to meet The Americans with Disabilities Act (ADA). Notes Awarded To MK Constructors Eric G€Ichriest 25815 Reason Owner Requested Code Days 0 Changed Attachments PW0723-11 -Additional Sidewalk Sheet 4.pdf Change Order Summary original Contract Sum 327,285.00 Substantial Completion Date Not Cost by Previous Approved COs 0.00 Net Time Change By Previous COs 0 days Contract Sun Before This CO 327,285,00 Substantial Completion before This CO a Contract Sum Changed By This CO 22,768.00 Time Changed By This CO 0 days New Contract Sum 350,053,00 New Substantial Completion Date All Change Orders make up 6.960% of the Original Contract Accounting and Status Accounting Status Item Id 475 PO Number Accounting Project Code Custom Accounting Field 05 Custom Accounting Field 07 FEMA Number Custom Accounting Field 04 Custom Accounting Field 06 Custom Accounting Field 08 Line Items Item Account WBSI Unit Total # Code Section description Quantity UoM Price Amount Contract Items 003 003 REMOVING CONCRETE (SIDEWALK OR RAMP) 68.80 Sy 33.00 2,270.40 013 013 REMOVE STR (MANHOLE) -1.00 EA 625.00 -625.00 018 018 CONC SIDEWALKS AND RAMPS (CLASS A) 68.80 SY 327.00 22,497.60 022 022 SAN SEWER MANHOLE (48") -1.00 EA 10,150.00 -10,150.00 022A 022A SAN SEWER MANHOLE MODIFICATIONS (SEE SCOPE OF WORK 1.00 EA 8,775.00 8,775.00 CO. 1) (48" FIBERGLASS MH TO BECOME CITY PROPERT Total 22,768,00 Grand Total: 22,768.00 Approval Pending Name or Role 1 External -GC 2 Project Manager 3 City Engineer 4 Director 5 Admin 6 Assistant City Manager Status Approved Eric GlIchriest 03-Nov-2023 03:13 PM CST Approved David Tingle 06-Nov-2023 11:43 AM CST Approved Amalia "Molly" Villarreal 07-Nov-2023 09:32 AM CST Approved Bari Bankowiak 07-Nov-2023 09:37 AM CST Pending Actions Waiting for previous approvals. Due: 14-Nov-2023 Name or Role Status Actions 7 City Clerk Waiting for previous approvals. Created by: David Tingle on Ot-Nov-2023 Last Modified by: Bart Bartkowiak on 07-Nov-2023 Page is too large to OCR. Page is too large to OCR. Page is too large to OCR.