HomeMy WebLinkAboutRES 23-319RESOLUTION NO. 23-319
BE IT RESOLVED BY THE CITY COUNCIL
OF THE CITY OF BEAUMONT:
WHEREAS, on January 24, 2023, the City Council of the City of Beaumont, Texas
passed Resolution No. 23-030 awarding a contract in the amount of $16,879,376.00 to Callan
Marine, Ltd., of Galveston, Texas, for the Riverfront Park Restoration Project; and,
WHEREAS, Change Order No. 1, in the amount of $159,745.46, is being requested to
remove and properly dispose of substantial ainounts of unforeseen buried concrete debris, a brick
wall structure, and buried creosote pilings. The debris and pilings were discovered once
construction began, despite several surveys to identify any potential conflicts to the new
improvements, thereby increasing the total contract amount to $17,039,121.46;
NOW, THEREFORE, BE IT RESOLVED BY THE
CITY COUNCIL OF THE CITY OF BEAUMONT:
THAT the statements and findings set out in the preamble to this resolution are hereby, in all
things, approved and adopted; and,
THAT the City Manager be and he is hereby authorized to execute Change Order No. 1,
in the amount of $159,745.46 for additional work described above, thereby increasing the total
contract amount to $17,039,121.46 for the for the Riverfront Park Restoration Project; and,
The meeting at which this resolution was approved was in all things conducted in strict
compliance with the Texas Open Meetings Act, Texas Government Code, Chapter 551.
PASSED BY THE CITY COUNCIL of the City .of Beapmont this the 31st day of
Contract - 001.001
23-Oci-2023 10:14 AM CST
Riverfront Park Restoration
801 Main Street Beaumont, Texas 77701
Project Number: PW1023-02
001,001: Change Order No. 1:.Concrete/ Brick Debris & Creosote Removal.
Grand Total: $159,745.46
For 004 Riverfront Park Restoration Construction
Division 35
Line Item Lump sum
Type
Group 3.0 Construction
Scope of This requested change order is necessary to remove and properly dispose of substantial amounts of unforeseen buried concrete debris,
Work a brick wall structure, and buried creosote pilings. The debris and pilings were discovered once construction began, despite several
surveys to identify any potential conflicts to the new improvements. This debris conflicts with placement of both the ACBM mat and the
bulkhead wall on the north end of the Riverfront Park and must be removed and properly disposed of for construction to continue.
Notes
Awarded To
Callan Marine Ltd
Rick Alexander
29143
Reason
Unforseen Site Conditions
Code
Days
12
Changed
Attachments
2s dumpsters.pdf
Change Order 1 - Concrete Debris & Creosote Removal.pdf
Change Order reports.pdf
Creosote Dumpsters.pdf
Change Order Summary
Original Contract Sum
16,879,376.00 Substantial Completion Date
Not Cost by Previous Approved COs
0.00 I Net Time Change By Previous Cos 0 days
Contract Sum Before This CO
16,879,376.00 Substantial Completion before This CO
Contract Sum Changed By This CO
159,745.46 Time Changed By This CO 12 days
New Contract Sum
17,039,121,46 Now Substantial Completion irate
All Change Orders make up 0.95% of the Original Contract
Accounting and Status
Accounting Status
Item Id
PO Number
Accounting Project Code
Custom Accounting Field 05
Custom Accounting Field 07
448
433176
H13015
Line Items
Item # Account Code WBS1 Section
Concrete and Brick Debris Removal - Change Order 1
001 Concrete/ Brick 352023.13
002 Creosote 352023.13
Total
Approval Pending
FEMA Number
Custom Accounting Field 04
Custom Accounting Field 06
Custom Accounting Field 08
Description
Concrete/ Brick Debris Removal
Creosote Timber Pile Removal
6499
Total Amount
128,214.13
31,531.33
159,745.46
Grand Total: 159,746.46
Due. 27-act-2023
Name or Role
Status Actions
1
External -Inspector
Approved
Brett Roebuck
i 6-Oct-2023 09:06 AM CST
2
External -Engineer
Approved
Chris Guy
i 6-Oct-2023 10:58 AM CST
3
Project Manager
Approved
David Tingle
16-Oct-2023 11:03 AM CST
4
City Engineer
Approved
Amalia "Molly" Villarreal
I 9-Oct-2023 02:57 PM CST
5
Director
Approved
Bari Bartkowiak
20-Oct-2023 10:30 AM CST
6
Admin
Pending
7
Assistant City Manager
Waiting for previous approvals.
8
City Clerk
Waiting for previous approvals,
411,11-11))),
Pro ec m a es (',I ff"YO F. B EAL) M 0 N-F. P ROJ U."I" MATES. CO M
Approved Approval Request for Change Order #001.001
1IlRiveirf iraint 1�3aiHk. 801III aiin Street, Ili3eatirnain't, 11IJSA
r,I�,,ursday, III.v 02,, 2,02,3
a Fraii n- Grystd� Garza ec',ryst ���.ga��i"za@�beaL]ir'y'ioiii"�i't'te)(,',�
Change Order Details Grand Total: $159,745.46
("Ounbract NLUmber
0011 0011
Cantract M
4.4,8
I'Descrip"flon
Ghange Order 1No. "I ': Concrete/ 1:1d6k [Debriiis & Greosate [Rernova
VliisliiUrr,
35 Waterway and IMa,lrlune
II1lmnliis requeste(i change ard(,)r lis Ir iecessary to rernove and Iprolperly ('fispose Of SUbstanUM arnounts of
unfareseen bt.tded cancrete debriiis, a brick, wall struct 'ure, and buried u,eosote pI1i4 igs. . .. .. .. he debrliis and
Scqpe c)'f Wark
fl pIii[irigs were 6SCOVrered an le c,'anstri.ic,an began, desple �SEWerM st,jrveys to idenUanntJM
.. .. .. fy y pote,canfhcts
to the Irnonnnrn Iro o In n o Irn t . ri-,lis debrliis canfhcts Wth IpIbce[Tieriit of Ibofti ftie ACI:..: mat and tl'ie ItsLdkhead
W6H an the Inolrtlh end of bl-ie lFRiverflrolnt IF:Iark. and IrTnLwst Igo Ira.moved cand prqpe�HyOsposed offar
canstructbri to canUflUe
Awarded to
IFZick Nexander (("Ia[bri II arine td), 2914,3
[Retaiiriage Work Carnplleted %
0 00
R,eta. inage Materl4ls Stared %
0.00
Greated IBy
[Rick AIE)xar ider (CalHar-i� II arlhne td)
Greate
ALJg 18, 2023 0226 F�IKA cs ir
[Reasan Code
( hifarseeri Site CandiiiUans
s Changed
'12
RES 23-319 Riverfront Park QQJ.pdLf
2s dumpsters.pAf
Attaclitnerits
Change Order 1 - Concrete Debris & Creosote Remoyal.pAf
Change Order reports.pAf
Creosote Qumpsters.pAf
ErNff HSI mw•
In e II to Irnrn rype a IrTl lP S LI Irn
G Iro u p 3 0 CanstrucUan
Greated On (,".)ct 13, 2023
Capital Planning
CaplIali FIarinirig
CcqpiIa�� FIrojectIF: �`liiscM Year
29=
F(1u,.j irn Ike �r
LI itn Ib e r
AcCC)UriAli rig F:Iro,Ject Code
Approval (Approved)
User / Role
[3rett [Roe[-.)uck ([.;;;Xt&r'iiA prlsli.-)ec.tor)
(.".Ihris Ga uy (Externdii i nee
�r)
I) av i d inglie (Flroject Ip ai--iager)
Coinstruct imi FRJverfrotit F-Iark IFRestoratiwi
2023
4.331 76
64,99
1,130,15
A�,-nahurn M6Hy Vi[4ri�e6'31ty, [.:;;rlgirleer)
i:~ a it IBartkowialip (Director)
,hn-ie E: phs (Alssistant Dty, Manager)
ina Brows'sard (City ('A.irk
)
Status Comments
AI�.-)proved
I VI/ A
Oct "16, 2023 09:06 AM CS
Approved
IIN/A
Oct '16, 2023 10- 58 AM ("O'S
Approved
III /A
Oct 16, 2023 11 -03 AM CS
Approved
IN/A
Oct 191 2,023 02:57 FIM CS
Approved
III /A
Oct 20, 2,0213 10-30 AM CS
Approved
Approved oi�-i 10.31.23 by [ es. III . 23 319
�Nov 01 1 2023 08-03 AM CS
Approved
IN/A
lNov, 02, 2023 09:59 AM CS"I
Apprc-)ved
IIN/A
W-W 02,2023 09:59 AM CS
Item No Budget Code WBS / Section
Coiirwiretiiini Riri&IIIC)6ll iiiriiis Ill .eiir-niovaIll O[mi�,ige Gir&ir 1
001 Conar(-Ae/ Rddk �N/A 352023.13
002 Greosote �N/A 3 52 0 23. "13
Description Total
ConarE-Ae/ lRrk.,k Debris Rerrova11 128,214. 13
Pfle lRerriova,lll 31,531.33
-11-bt4ll 159 745.46
2 14. 217 . 4- 10 0
Lit'�ps- sLjpfLort.r.Lro n 1-� — -.jectryiates.cor
2023 ProjeCtffia-tes / Systlernatles, Mc.
2435 N Cerfl.,,ra� Expy
Richardsor-�, TX 75080