HomeMy WebLinkAboutRES 23-240RESOLUTION NO. 23-240
BE IT RESOLVED BY THE CITY COUNCIL
OF THE CITY OF BEAUMONT:
WHEREAS, on May 23, 2023, the City Council of the City of Beaumont, Texas
passed Resolution No. 23-148 awarding a contract in the amount of $2,444,071.28 to
Vortex Companies, of Houston, Texas for the Long Street Grouting Repairs Project;
and,
WHEREAS proposed Change Order No. 1, in the amount of $217,303.38, is
being requested to adjust the actual quantities needed to address additional voids
encountered during construction, the initial survey utilizing Ground Penetrating Radar
(GPR) was used to estimate the quantity of grout thereby increasing the total contract
amount to $2,661,374.66;
NOW, THEREFORE, BE IT RESOLVED BY THE
CITY COUNCIL OF THE CITY OF BEAUMONT:
THAT the statements and findings set out in the preamble to this resolution are hereby,
in all things, approved and adopted; and,
THAT the City Manager be and he is hereby authorized to execute Change
Order No. 1, in the amount of $217,303.38 for additional work described above, thereby
increasing the total contract amount to $2,661,374.66 for the Long Street Grouting
Repairs Project.
The meeting at which this resolution was approved was in all things conducted in
strict compliance with the Texas Open Meetings Act, Texas Government Code, Chapter
551.
PASSED BY THE CITY COUNCIL of the City of, Beaumont this the 29th day of
August, 2023.
- Mayor Roy West —
RESOLUTION NO. 23-148
BE IT RESOLVED BY THE CITY COUNCIL OF THE
CITY OF BEAUMONT:
THAT the City Manager be, and he is hereby, authorized to award a contract to
Vortex Companies, of Houston, Texas for the Long Street Grouting Repairs Project in
the amount of $2,444,071.28. The agreement is substantially in the form attached
hereto as Exhibit 'A" and made a part hereof for all purposes.
The meeting at which this resolution was approved was in all things conducted in
strict compliance with the Texas Open Meetings Act, Texas Government Code, Chapter
551.
PASSED BY THE CITY COUNCIL of the City of Beaumont this the 23rd day of
May, 2023.AW
�F,AONj'�1���
iF
R.
Ma or Ro
, y yest -
Contract - 002.001
21-Aug-2023 11:12 AM CST
002.001: CO#002.001: Additional Grout Quantity
For 002 Long Street Grouting Repair
Division 13
Line Item Unit price
Type
Long St. Storm Sewer Inspection & Repair
801 Main St. Beaumont, TX 77701
Grand Total $217,303.38
Group 3.0 Construction
Scope of This requested change order is necessary to address additional voids encountered during construction, The initial survey utilizing ground
Work penetrating radar (GPR) was used to estimate the quantity of grout that was needed, however, due to the extent of the voids, and some
limitations with GPR, additional grout was needed to fully stabilize the soils surrounding the storm line on Long Street.
Notes
Awarded To
Vortex Turnkey Solutions LLC
Jacob Nix
27958
Reason
Quantity Adjustment
Code
Days
0
Changed
Attachments
Billing Breakdown for Beaumont (1).xlsx
Change Order Summary
Original Contract Sum 2,444,071.28
Net Cost by Previous Approved COs 0.00
Contract Sum Before This CO 2,444,07118
Contract Sum Changed By This CO 217,303.38
Now Contract Sum 2,661,374.66
All Change Orders make up 8.89% of the Original Contract
Accounting and Status
Accounting Status
Item Id 439
Substantial Completion Date
Net Time Change By Previous COs 0 days
Substantial Completion before This CO
Time Changed By This CO 0 days
New Substantial Completion Date
PO Number 433704
FEMA Number
Accounting project Code STLSTG
Custom Accounting Field 04
Custom Accounting Field 05
Custom Accounting Field 06
Custom Accounting Field 07
Custom Accounting Field 08
Line Items
Item Account WBS/
# Code Section Description
3.0 Construction
Unit Total
Quantity UoM Price Amount
002 01000 HIGH DENSITY URETHANE FOR GROUTING, SLAB LIFTING, VOID 17,841.00 EA
FILLING, PIPE SEALING, ETC
003 01000 PERFORMANCE AND PAYMENT BOND 1.00 EA
Total
Approval Pending
Name or Rote
1 Extemal-GC
2 Project Manager
3 City Engineer
4 Director
5 Admin
6 Assistant City Manager
7 City Clerk
Status
Approved
Jacob Nix
14-Aug-2023 01:33 PM CST
Approved
David Tingle
14-Aug-2023 01:33 PM CST
Approved
Amalia "Molly" Villarreal
14-Aug-2023 06:00 PM CST
Approved
Bart Bartkowiak
15-Aug-2023 08:42 AM CST
Pending
Created by: Jacob Nix on 09-Aug-2023 Last Modified by: Bart Barfkowlak on 15-Aug-2023
Actions
12.00 214,1192.00
3,211.38 3,211.38
217,303.38
Grand Total: 217,303.38
Waiting for previous approvals.
Waiting for previous approvals.
Due: 22-Aug-2023
Contract - 002.001
22-Sep-2023 11:01 AM CST
002.001: CO#002.001: Additional Grout Quantity
Long St. Storm Sewer Inspection & Repair
801 Main St. Beaumont, TX 77701
Grand Total: $217,303.38
For 002 Long Street Grouting Repair
Division 13
Line Item Unit price
Type
Group 3.0 Construction
Scope of This requested change order is necessary to address additional voids encountered during construction. The initial survey utilizing ground
Work penetrating radar (GPR) was used to estimate the quantity of grout that was needed, however, due to the extent of the voids, and some
limitations with GPR, additional grout was needed to fully stabilize the soils surrounding the storm line on Long Street.
Notes
Awarded To Vortex Turnkey Solutions LLC
Jacob Nix
27958
Reason Quantity Adjustment
Code
Days 0
Changed
Attachments
RES 23-240 Long Street Grouting.pdf
Billing Breakdown for Beaumont (1).xlsx
Change Order Summary
Original Contract Sum
Net Cost by Previous Approved COs
Contract Sum Before This CO
Contract Sum Changed By This CO
New Contract Sum
All Change Orders make up 8.89% of the Original Contract
Accounting and Status
2,444,071.28 Substantial Completion Date
0.00 Net Time Change By Previous COs
2,444,071.28 Substantial Completion before This CO
217,303.38 Time Changed By This CO
2,661,374.66 New Substantial Completion Date
0 days
0 days
Accounting Status
Item Id 439
PO Number 433704 FEMA Number
Accounting Project Code STLSTG Custom Accounting Field 04
Custom Accounting Field 05 Custom Accounting Field 06
Custom Accounting Field 07 Custom Accounting Field 08
Line Items
Item Account
WBS/
Unit
Total
# Code
Section
Description
Quantity UoM Price
Amount
3.0 Construction
002
01000
HIGH DENSITY URETHANE FOR GROUTING, SLAB LIFTING, VOID
17,841.00 EA 12.00
214,092.00
FILLING, PIPE SEALING, ETC
003
01000
PERFORMANCE AND PAYMENT BOND
1.00 EA 3,211.38
3,211.38
ij
Total
217,303.38
Grand Total: 217,303.38
Approval Approved
Due: 28-Sep-2023
Name or Role
Status Actions
1 External -GC
Approved
Jacob Nix
14-Aug-2023 01:33 PM CST
2 Project Manager
Approved
David Tingle
14-Aug-2023 01:33 PM CST
3 City Engineer
Approved
Amalia "Molly" Villarreal
14-Aug-2023 06:00 PM CST
4 Director
Approved
Bart Bartkowiak
15-Aug-2023 08:42 AM CST
5 Admin
Approved Comments: Approved on 8/29/23 by Resolution No. 23-240
Crystal Garza
30-Aug-2023 08:07 AM CST
6 Assistant City Manager
Approved
June Ellis
30-Aug-2023 11:01 AM CST
7 City Clerk
Approved
Tina Broussard
21-Sep-2023 09:03 AM CST
Created by: Jacob Nix on 09-Aug-2023 Last Modified by: Tina Broussard on 21-Sep-2023