Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
RES 23-215
RESOLUTION NO. 23-215 BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF BEAUMONT: THAT the City Manager be and he is hereby authorized to award a contract to Brystar Contracting, Inc., of Beaumont, Texas in the amount to not exceed $189,645.00, for the Evalon Street 8'x8' Box Culvert and Cavity Emergency Repair Project. The meeting at which this resolution was approved was in all things conducted in strict compliance with the Texas Open Meetings Act, Texas Government Code, Chapter 551. PASSED BY THE CITY COUNCIL of the City of Beaumont this the 8th day of August, 2023. - Mayor Roy West BEAUMONT TEXAS July 24, 2023 City of Beaumont Purchasing Department 801 Main Street, Suite 320 Beaumont, Texas 77701 Re: Evalon Street 8' X 8' Box Culvert and Cavity Repair Emergency Worlc This letter is to inform you that the City of Beaumont was notified about a cavity and pavement failure at 3750 Evalon Street. Upon visiting the site, further investigation identified the failure to an 8'x8' concrete box culvert located partially In the roadway and partially into the yard of the residence at 3750 Evalon Street. Upon arrival at the site, it was discovered that a collapsed 18-inch storm line that ties Into the box culvert was the cause of the cavity, it seems that a previous attempt to make a street repair to a failed section of roadway caused by the cavity caused damage to the top of the box culvert. Thls was likely due to the top of the box also serving as the concrete roadway. This investigation also -led to the discovery that an approximately 40-foot section of the side wall to the box culvert was defective, causing It to bulge in. Due to poor soil conditions, and the rest of the box being In good condition, it was decided to reach out to a local structural engineer to ask them to design a repair to the wall of the box culvert that required as little excavation as possible. Fittz & Shipman was secured to design the structural repair to the interior of the box culvert. Upon receiving the final repair plans from Fittz & Shipman, we have secured a qualified local contractor who can address this repair. Brystar Contracting, Inc., can begin the work as early as Tuesday, July 25th. They were selected based on their prior experience in repairing storm sewers of similar construction. Due to the proximity to several residences and the threat of the cavity expanding in size and extending onto private property, Public Works/Engineering has determined that the repair of this cavity, concrete box culvert, and storm sewer line, must be performed on an emergency basis. PUBLIC WORKS T 409.880,3725 F 409.880.3732 PO Box 38271 Beaumont, TX 77704 801 Main St. I rd Floor I Beaumont, TX 77701 beaumonttexas.gov Evalon Street Emergency Repair Page 2 of 2 If you have any further questions, please feel free to contact me at (409) 880-3725, Sincerely, Bart Bartkowial< Director of Public Works PUBLICWORKS T 409,880.3725 F 409.880.3732 P© Box 38271 Beaumont, TX 77704 801 Main St.12"d Floor I Beaumont, TX 77701 beaumonttexas.gov 8385 Chemical Road • Boaun-iont, Texas 77705 •(409) 842-6768 July 21, 2023 Molly Villarreal, P.E. City Engineer City Hall, 801 Main Street Beaumont, Texas 77701 Via email: riiolly.villarreal ct,beauiiionttexas.�;ov Cc: David.Tin lea beaumonttexas. *ov Re: Evalon Sheet 8' x 8' Box. Culvert Repair (Stamped & Dated 06/22/2023) Ms, Villarreal, Based on our review of the plans and job site, Brystar is pleased to offer this budget estimate based on our time and materials rates for an emergency repair. Brystar shall provide all necessary supervision, labor, equipment, materials, and insurance to complete the work as proposed. Budget Estimate: $189,645.00 Exclusions: - Bonds / Permits / Fees S WPPP Should you have any questions or concerns please do not hesitate to call. Sincerely, Bryan Phelps, President Brystar Contracting Inc Billable Labor Rates Hourly Reg Rate Hourly OT Rate Technical Advisor $150.00 N/A Project Manager $90.00 $135,00 Construction Superintendent $75.00 $112.50 Foreman $58.00 $87.00 Equipment Operator $53.00 $79.50 Lead Laborer $38.00 $57.00 Laborer $35.00 $52.50 Certified Rigger (Level 1) $58.00 $87.00 Certified Hole Watch $37.00 $55.50 Certified Fire Watch $37.00 $55.50 Certified Bottle Watch $37.00 $55,50 Concrete Form Setter $47.00 $70.50 Concrete Finisher $47.00 $70.50 Rebar Installer $45.00 $67.50 Pipe Fitter $52.00 $78.00 Safety Supervisor $58.00 $87.00 Truck Driver - Water Truck $45.00 $67.50 Welders $70.00 $106.00 Carperter $54.00 $81.00 Brystar Contracting Inc Equipment - Hourly or Daily rate per 8 hour day Hourly Dailly Tool Trailer $30,00 $240.00 Supervisor Truck w/ Tools $30.00 $240.00 Crew Truck w/ Tools $30.00 $240.00 Operated Trucks Hourly Daily Haul Truck w/ Driver (4hr Min $165.00 $1,320.00 Tandem Dump Truck w/ Driver (4hr Min) $85.00 $680.00 Tandem Truck & Trailer Dump w/ Driver (4hr Min) $135.00 $1,080,00 Brystar Contracting, Inc. Equipment Rental Rates Equipment rates include all fiiel, oil and maintenance - 3rd party equipment NOT included Daily Rate Track Skid Steers 60 - 70 HP $ 435.00 70 - 80 HP $ 503.00 80 - 90 HP $ 595.00 90 - 100 HP $ 664.00 Excavators w/ Bucket Mini: Weight 4,000 - 13,000 lbs $ 556.00 Midi: Weight 13,000 - 18,000 lbs $ 824.00 Weight 18,000 - 24,000 Ibs $ 961.00 Standard: Weight 24,000 - 34,000 lbs $ 1,053,00 Weight 34,000 - 44,000 lbs $ 1,233.00 Weight 44,000 - 60,000 lbs $ 1,747.00 Weight 60,000 - 80,000 lbs $ 2,226.00 Weight 80,000 - 95,000 lbs $ 2,430.00 Weight 95,000 - 113,000 lbs $ 3,252.00 Longstick 60' Reach w/ Bucket $ 2,287.00 Mower for Longstick $ 248.00 Demolition Hammer $ 450.00 Loader / Boxhlade Weight 7,000 - 10,599 Bucket I - 1.25 cu. Yd $ 482.00 Loader / Backhoes 4WD Loader / Backhoe $ 584.00 Backhoe /Hain mer W/Breaker $ 1,190.00 Standard Track Dozer Weight up to 17,000 $ 767.00 Weight 17,001 - 20,000 $ 944.00 Weight 20,001 - 3 0,4 99 $ 1,307.00 Weight 30,500 - 35,000 $ 1,692.00 Weight 35,001 - 45,000 $ 2,220.00 Wide Tracy Dozers Weight up to 19,999 $ 778.00 Weight 20,000 - 29,999 $ 1,007.00 Weight 30,000 - 33,999 $ 1,485.00 Weight 30,000 - 33,999 w/ Smartgrade $ 2,506.00 Weight 34,000 - 39,999 $ 1,809.00 Weight 34,000 - 39,999 w/ Smartgrade $ 2,898.00 Weight 40,000 - 47,999 $ 2,287.00 Wheel Loaders 2.0 CU. YD. $ 824.00 2.5 CU. YD. $ 938.00 2.75 CU. YD. $ 1,007.00 3.0 CU. YD. $ 1,236.00 3.5 CU. YD. $ 1,373.00 Brystar Contracting, Inc. Equipinent Rental Rates Equipment rates include all fuel, oil and maintenance - 3rd party equipment NOT i►lcluded Daily Rate Articulated D►►►np Trucks 30 Ton 22.9 CU YD Heaped $ 2,631.00 Motorgraders 120HP 12' blade $ 981.00 220HP Tandem Drive $ 1,762,00 Asphalt Rollers 48" Double Drum Smooth $ 412.00 Smooth Drum Rollers 66" Smooth Drum. $ 732.00 84" Smooth Drum $ 915.00 Pad Drtnn Rollers 54" Pad Drum $ 618.00 66" Pad Drum $ 801.00 84" Pad Drum $ 1,007.00 84" Pad DrLim $ 1,047.00 Sweepe►s Brace 8' Brooni $ 463.00 Water Truck 2000 gallon $ 584.00 Tractor & I►nplements 5001-1P $ 3,050.00 1812 Pau $ 981.00 Ktee Pan $ 1,310.00 90 HP Tractor $ 470.00 15' Batwing Mower $ 322.00 Rone 12' Disc $ 412.00 Mixer Raygo Soil Stabilizer $ 1,977,00 CAT RM 300 $ 2,472.00 Walk Behind Concrete Saw 20 - 49 HP $ 371.00 50 - 75 HP $ 478.00 Pumps 2" Gas Centrifical w/ Suction & Discharge $ 132.00 6" Gas Centrifieal w/ Suction & Discharge $ 602.00 12" Low Lift w/ Power Pack (Pump Only) $ 824.00 Brystar Contracting, Inc. Equipment Rental Rates Equipment Fates include all fiiel, oil and maintenance 3rd party equipment NOT included Daily Rate Generator 2000 - 4000 Watt $ 83.00 Air Comressor Fusion Mats & Skids Torque Wrenches Trailers Power Tools Mise Small Tools 185 CFM Compressor Friatech Fusion with Generator $ 305.00 $ 285.00 Truck Mat $ 20.00 Skids $ 1.00 Dragline Mats $ 22.00 Slings / Cable Spreaders $ 25.00 1/2" Drive $ 45.00 3/4" Drive $ 95.00 1" Drive $ 150.00 Sockets (Each per Day) $ 5.00 Lowboy Trailer $ 40.00 Drill $ 20.00 Skill Saw $ 20.00 Side Grinder / Porta Band Saw $ 25.00 Weedwater $ 65.00 Chainsaw $ 90.00 Tripod $ 54.00 Rotary Hammer $ 40.00 Extension Ladder $ 20.00 Concrete Mixer $ 100.00 3" Air Hoses $ 35.00 3/4" Air Hose $ 15.00 H2S Monitors $ 10.00 Safety Harness $ 20.00 Tyvek Suit $ 10.00 Brystar Contracting, Inc. Equipment Rental Rates Equipment rates include all fuel, oil and maintenance - 3rd party equipment NOT included Daily hate 3rd Party Purchases / Subcontractors 1) All material and consubable 3rd party purchase will be billed at cost plus 15% 2) All 3rd party equipment will be billed at cost plus 15% 3) All fuel usage in 3rd party equipment will be billed at cost plus 15% 4) All repairs to 3rd party equipment will be billed at cost plus 15%