HomeMy WebLinkAboutRES 23-216RESOLUTION NO. 23-216
BE IT RESOLVED BY THE CITY COUNCIL
OF THE CITY OF BEAUMONT:
WHEREAS, on January 24, 2023, the City Council of the City of Beaumont,
Texas passed Resolution No. 23-031 awarding a contract in the amount of
$6,079,536.28 to Gulf Coast, a CRH Company of Beaumont, Texas, for the 4th Street
Roadway Rehabilitation Project; and,
WHEREAS, proposed Change Order No. 1, in the amount of $441,552.00, is
required to address areas where other utilities conflict with the storm sewer system, or
to repair defects in the storm sewer system, thereby adding an additional thirty-five (35)
additional days, and increasing the total contract amount to $6,521,088.28;
NOW, THEREFORE, BE IT RESOLVED BY THE
CITY COUNCIL OF THE CITY OF BEAUMONT:
THAT the statements and findings set out in the preamble to this resolution are hereby,
in all things, approved and adopted; and,
THAT the City Manager be and he is hereby authorized to execute Change
Order No. 1, in the amount of $441,552.00 for additional wont described above, thereby
increasing the total contract amount to $6,521,088.28 for the 41h Street Roadway
Rehabilitation Project; and,
The meeting at which this resolution was approved was in all things conducted in
strict compliance with the Texas Open Meetings Act, Texas Government Code, Chapter
551.
PASSED BY THE CITY COUNCIL of the
August, 2023.
ity of Beaumont this the 8th day of
Mayor Roy
RESOLUTION NO, 23-031
BE IT RESOLVED BY THE CITY COUNCIL
OF THE CITY OF BEAUMONT:
WHEREAS, the City of Beaumont solicited bids for the 4th Street Roadway
Rehabilitation Project; and,
WHEREAS, Gulf Coast, a CRH Company, of Beaumont, Texas, submitted a bid
meeting specification in the amount of $6,079,536.28; and,
WHEREAS, the Public Works Engineering staff is of the opinion that Gulf Coast,
a' CRH Company, of Beaumont, Texas, is the lowest responsible bidder providing the
best value to the City and should be accepted;
NOW, THEREFORE, BE IT RESOLVED BY THE
CITY COUNCIL -OF THE CITY OF BEAUMONT:
THAT the statements and findings set out in the preamble to this resolution are
hereby, in all things, approved and adopted; and,
THAT the City Council hereby approves the award of a contract to Gulf Coast, a
CRH Company, of Beaumont, Texas, in the amount of $6,079,536.28, for the 4" Street
Roadway Rehabilitation Project; and,
BE IT FURTHER, RESOLVED THAT the City Manager be and he is hereby
authorized to execute a contract with Gulf Coast, a CRH Company, of Beaumont,
Texas, for the purposes described herein,
The meeting at which this resolution was approved was in all things conducted in
strict compliance with the Texas Open Meetings Act, Texas Government Code, Chapter
551. 1
PASSED BY THE CITY COUNCIL of the City of Beaumont this the 24th day of
January, 2023,
U�K�-
- Mayor Robin Mouton -
Contract # 003.001
31-Jul-2023 08:34 AM CST
4th Street Roadway Rehabilitation
4th Street Beaumont, Texas 77705
Project Number: PW1222-05
003.001: CO#003.001: Change Order 1
Grand Total: $441,552.00
For 003 4th Street Roadway Rehab Construction
Division 01
Line Itorn Unit price
Type
Group 3.0 Construction
Scope of This Owner requested change order is necessary to address areas where other utilities conflict with the storm sewer system, or to repair
Work defects in the storm sewer system. These conflicts can possibly impede drainage and the defects can potentially undermine the roadbed.
Making these repairs prior to the placement of the pavement will maximize the anticipated service life of the road.
Notes
Awarded To Gulf Coast a CRH Company
Erik Rodriguez
27695
Reason
Owner Requested
Code
Days
35
Changed
I
Attachments
Drainage Change order 1 City of Beaumont 4th street.pdf
PW1023-03 CO1(1).pdf
Change order _I.pdf
Change Order Summary
Original Contract Sum 6,079,536.28
Substantial Completion Date
Net Cost by Previous Approved COs 0.00
Net Time Change By Previous COs 0 days
Contract Sum Bofore This CO 6,079,536.28
i
Substantial Completion before This CO
Contract Sum Changed By This CO 441,552,00
Time Changed By This CO 35 days
New Contract Surn 6,521,088.28
New Substantial Completion Date
All Change Orders make up 7.26% of the Original Contract
Accounting and Status
Accounting Status
Item Id 432
PO Number 433541 FEMA Number
E
Accounting Project Code STASHL Custom Accounting Field 04
Custom Accounting Field 05 Custom Accounting Field 06
Custom Accounting Field 07 Custom Accounting Field 08
Line Items
Account
WB8I
Unit
Total
Item # Code
Section
Description
Quantity
UoM
Price
Amount
Contract Items
104-
001
REMOVING CONCRETE (CURB)
168.00
LF
6.50
1,092.00
6021
104-
001
REMOVING CONCRETE (CURB AND GUTTER)
20.00
LF
6.00
120.00
6022
247-
001
FLEX BASE (CMP IN PLACE) (TY A GR 2) (8")
932.00
SY
87.00
81,084.00
6001
361-
001
REPAIR CONCRETE PAVEMENT (8")
932.00
SY
184.00
171,488.00
6001
400-
001
CEMENT STABIL BKFL (2.0 SKICYSAND)
46,00
CY
106.00
4,876.00
6005
464-
001
RC PIPE (CL Ill) (15 IN)
88.00
LF
260.00
22,880.00
6002
464-
001
RC PIPE (CL III) (18 IN)
16.00
LF
325,00
5,200.00
6003
465-
001
INLET (COMPL) (INCLUDING BACKFILL)
3.00
EA
9,500.00
28,500,00
6001
465-
001
MANHOLE (COMPL) {SPECIAL) (INCLUDING BACKFILL)
2.00
EA
12,240.00
24,480.00
6002
465-
001
JUNCTION BOX (8'X8'X5' CONFLICT BOX) (MANHOLE ACCESS)
1.00
EA
22,200.00
22,200.00
6003
(INCLUDING BACKFILL)
465-
001
JUNCTION BOX (10'X8'X5' CONFLICT BOX) (MANHOLE ACCESS)
1.00
EA
25,830.00
25,830.00
6004
(INCLUDING BACKFILL)
496-
001
REMOVE STR (PIPE) (ALL SIZES) (ALL MATERIAL)
104.00
LF
15.00
1,560.00
6001
496-
001
REMOVE STR (INLET)
3.00
EA
2,000.00
6,000.00
6002
496-
001
REMOVE STR (MANHOLE)
2.00
EA
2,360.00
4,720.00
6003
Account
Wl3SI
Unit
Total
Itern -4 Code
Section
Description
Quantity UoM Price
Amount
529-
001
CONC CURB (TY I)
168.00 LF 36.50
6,132.00
6001
529-
001
CONC CURB & GUTTER (TY l)
20.00 LF 32.00
640.00
6007
999-
001
FURNISH AND INSTALL ALL PARTS AND MATERIAL TO
LOWER 8" 1.00 LS 18,750.00
18,750.00
6002
WATERLINE, COMPLETE IN PLACE, INCLUDING ALL
999-
001
FURNISH AND INSTALLALL PARTS AND MATERIAL TO
LOWER 6" 1.00 LS 16,000.00
16,000.00
6003
WATERLINE, COMPLETE IN PLACE, INCLUDING ALL
Total
441,552.00
Grand Total: 441,652.00
Approval Pending
Duo: 2-Aug-2023
Narne or Role
Status
Actions
1 External -GC
Approved
Erik Rodriguez
i
26-Jul-2023 11:01 AM CST
2 Project Manager
Approved
David Tingle
26-Jul-2023 11:04 AM CST
3 City Engineer
Approved
Amalia "Molly" Villarreal
26-Jul-2023 11:05 AM CST
4 Director
Approved
Bart Bartkowiak
26-Jul-2023 01:47 PM CST
5 Admin
Pending
6 Assistant City Manager
Waiting for previous approvals.
7 City Clerk
Waiting for previous approvals.
Created by: David Tingle on 25-Jul-2023 Last Modified by: Bari Bartkowiak on 26-Jul-2023
Contract - 003.001
10-Aug-2023 02:07 PM CST
003.001: CO#003.001: Change Order 1
4th Street Roadway Rehabilitation
4th Street Beaumont, Texas 77705
Project Number: PW1222-05
Grand Total: $441,552.00
For 003 4th Street Roadway Rehab Construction
Division 01
Line Item Unit price
Type
Group 3.0 Construction
Scope of This Owner requested change order is necessary to address areas where other utilities conflict with the storm sewer system, or to repair
Work defects in the storm sewer system. These conflicts can possibly impede drainage and the defects can potentially undermine the roadbed.
Making these repairs prior to the placement of the pavement will maximize the anticipated service life of the road.
Notes
Awarded To Gulf Coast a CRH Company
Erik Rodriguez
27695
Reason Owner Requested
Code
Days 35
Changed
Attachments
Drainage Change order 1 City of Beaumont 4th street.pdf
RES 23-216 4th Street CO1.pdf
PW 1023-03 CO 1(1). pdf
Change order _1.pdf
Change Order Summary
Original Contract Sum
Net Cost by Previous Approved COs
Contract Sum Before This CO
Contract Sum Changed By This CO
New Contract Sum
All Change Orders make up 7.26% of the Original Contract
6,079,536.28 Substantial Completion Date
0.00 Net Time Change By Previous COs
6,079,536.28 Substantial Completion before This CO
441,552.00 Time Changed By This CO
6,521,088.28 New Substantial Completion Date
0 days
35 days
Accounting and Status
Accounting Status
Item Id
PO Number
Accounting Project Code
Custom Accounting Field 05
Custom Accounting Field 07
Line Items
Account WBS/
Item # Code Section Description
Contract Items
432
433541 FEMA Number
STASHL Custom Accounting Field 04
Custom Accounting Field 06
Custom Accounting Field 08
104-
001
REMOVING CONCRETE (CURB)
6021
104-
001
REMOVING CONCRETE (CURB AND GUTTER)
6022
247-
001
FLEX BASE (CMP IN PLACE) (TY A GR 2) (811)
6001
361-
001
REPAIR CONCRETE PAVEMENT (811)
6001
400-
001
CEMENT STABIL BKFL (2.0 SK/CYSAND)
6005
464-
001
RC PIPE (CL III) (15 IN)
6002
464-
001
RC PIPE (CL III) (18 IN)
6003
465-
001
INLET (COMPL) (INCLUDING BACKFILL)
6001
465-
001
MANHOLE (COMPL) (SPECIAL) (INCLUDING BACKFILL)
6002
465-
001
JUNCTION BOX (8'X8'X5' CONFLICT BOX) (MANHOLE ACCESS)
6003
(INCLUDING BACKFILL)
465-
001
JUNCTION BOX (10'X8'X5' CONFLICT BOX) (MANHOLE ACCESS)
6004
(INCLUDING BACKFILL)
496-
001
REMOVE STR (PIPE) (ALL SIZES) (ALL MATERIAL)
6001
496-
001
REMOVE STR (INLET)
6002
Unit Total
Quantity UoM Price Amount
168.00 LF 6.50 1,092.00
20.00 LF 6.00 120.00
932.00 SY 87.00 81,084.00
932.00 SY 184.00 171,488.00
46.00 CY 106.00 4,876.00
88.00 LF 260.00 22,880.00
16.00 LF 325.00 5,200.00
3.00 EA 9,500.00 28,500.00
2.00 EA 127240.00 24,480.00
1.00 EA 22,200.00 223200.00
1.00 EA 257830.00 25,830.00
104.00 LF 15.00 1,560.00
3.00 EA 27000.00 65000.00
Account
WBS/
Unit
Total
Item # Code
Section
Description
Quantity
UoM
Price
Amount
496-
001
REMOVE STR (MANHOLE)
2.00
EA
27360.00
4,720.00
6003
529-
001
CONC CURB (TY 1)
168.00
LF
36.50
6,132.00
6001
529-
001
CONC CURB & GUTTER (TY 1)
20.00
LF
32.00
640.00
6007
999-
001
FURNISH AND INSTALL ALL PARTS AND MATERIAL TO LOWER 8"
1.00
LS
187750.00
18,750.00
6002
WATERLINE, COMPLETE IN PLACE, INCLUDING ALL
999-
001
FURNISH AND INSTALL ALL PARTS AND MATERIAL TO LOWER 6"
1.00
LS
167000.00
167000.00
6003
WATERLINE, COMPLETE IN PLACE, INCLUDING ALL
Total
4415552.00
Grand Total:
441,552.00
Approval Approved
Due: 16-Aug-2023
Name or Role
Status Actions
1 External -GC
Approved
Erik Rodriguez
26-J u I-2023 11:01 AM CST
2 Project Manager
Approved
David Tingle
26-J u I-2023 11:04 AM CST
3 City Engineer
Approved
Amalia "Molly" Villarreal
26-J u 1-2023 11:05 AM CST
4 Director
Approved
Bart Bartkowiak
26-Jul-2023 01:17 PM CST
5 Admin
Approved Comments: Approved by Res No. 23-216
Crystal Garza
09-Aug-2023 10:57 AM CST
6 Assistant City Manager
Approved
June Ellis
09-Aug-2023 01:33 PM CST
7 City Clerk
Approved
Tina Broussard
09-Aug-2023 01:37 PM CST
Created by: David Tingle on 25-Jul-2023 Last Modified by: Tina Broussard on 09-Aug-2023