WHEREAS, on June 14, 2022, the City Council of the City of Beaumont, Texas
passed Resolution No. 22-152 awarding a contract in the amount of $1,664,700.00 to
Allco, LLC, of Beaumont, Texas, for the Pine Street SWTP Polymer System and
Chemical Storage Tank Improvements (REBID) Project; and,
WHEREAS, Change Order Nos. 1-2 in the amount of $13,862.00 increased the
contract price to $1,678,562.00; and,
WHEREAS, Change Order No. 3, in the amount of $10,217.00, is requested due
to changes to the polymer system that have been made during construction, a new
weight scale to replace the existing one that will be salvaged, and a new tank mixer.
The new scale will be used to measure the polymer dosage in replacement of the
flowmeter, and a new tank mixer is required as the existing tank mixer is undersized for
the new tank. The flowmeter and its installation will be removed from the project, as
there is no flowmeter that meets the required standards and project criteria.
WHEREAS, if approved Change Order No. 3 will increase the total contract
amount to $1,688,779.00;
NOW, THEREFORE, BE IT RESOLVED BY THE
CITY COUNCIL OF THE CITY OF BEAUMONT:
THAT the statements and findings set out in the preamble to this resolution are
hereby, in all things, approved and adopted; and,
THAT the City Manager be and he is hereby authorized to execute Change
Order No. 3, in the amount of $10,217.00 for additional work described above, thereby
increasing the total contract amount to $1,688,779.00 for the Pine Street SWTP
Polymer System and Chemical Storage Tank Improvements (REBID) Project; and,
The meeting at which this resolution was approved was in all things conducted in
strict compliance with the Texas Open Meetings Act, Texas Government Code, Chapter
551.
PASSED BY THE CITY COUNCIL of the City of Beaumont this the 1st day of
August, 2023.
RESOLUTION NO.22-152
WHEREAS, the City of Beaumont solicited bids for furnishing all labor, materials,
and equipment for the Pine Street SWTP Polymer System and Chemical Storage Tank
Improvements (REBID) Project; and,
WHEREAS, Allco, LLC, of Beaumont, Texas, submitted a qualified bid in the
amount of $1,664,700.00; and,
WHEREAS, the City Council is of the opinion that the bid submitted by Allco,
LLC, of Beaumont, Texas, is the lowest qualified bidder providing services at the best
value to the City and should be accepted;
NOW, THEREFORE, BE IT RESOLVED BY THE
CITY COUNCIL OF THE CITY OF BEAUMONT:
THAT the statements and findings set out in the preamble to this resolution are hereby,
in all things, approved and adopted; and,
THAT the City Council hereby approves the award of a contract to Allco, LLC, of
Beaumont, Texas, in the amount of $1,664,700.00 for the Pine Street SWTP Polymer
System and Chemical Storage Tank Improvements (REBID) Project; and,
BE IT FURTHER RESOLVED THAT the Interim City Manager be and he is
hereby authorized to execute a contract with Allco, LLC, of Beaumont, Texas, for the
purposes described herein.
The meeting at which this resolution was approved was in all things conducted in
strict compliance with the Texas Open Meetings Act, Texas Government Code, Chapter
551.
PASSED BY THE CITY COUNCIL of the City of Beaumont this the 14th day of
June, 2022.
- Mayor Robin Mouton
Contract # 002.003
24-Jul-2023 02:04 PM CST
PINE STREET SVVrP POLYMER SYSTEM AND CHEMICAL STORAGE TANK IMPROVEMENTS (REBID)
1360 Langham Rd Beaumont, TX 77707
Project Number: WU0422-19
002.003: CO#002.003; Furnish/Install Polymer Scale and Tank Mixer, Remove Flowmeter
Grand Total: $10,217.00
For 002 PINE STREETSWTP POLYMER SYSTEM AND CHEMICAL STORAGE TANK IMPROVEMENTS (REBID)
Division 99
Line Item Emit price
Type
Group 3.0 Construction
Scope of Proposed Change Order No. 3 is requested due to changes to the polymer system that have been made during construction. A new
Work weight scale will be added to the project to replace the existing one that will be salvaged. The new scale will be used to measure the
polymer dosage in replacement of the flowmeter. A new tank mixer will be added to the project, as the existing tank mixer that was
planned to be used was discovered to be too short for adequate mixing of the polymer. The flowmeter and its installation will be removed
from the project, as there is no flowmeter that meets the required standards and project criteria.
Notes
Awarded To Alice, LLC
Brandon Harrison
6854
Reason Drawing and Spec Clarification
Code
Days 30
Changed
Attachments CO 3 Combined,pdf
20230720150608965. pdf
CO4--Mixer @ Day Tank(1).pdf
Change Order Summary
Original Contract Sum 1,664,700.00 Substantial Completion Date
Net Cost by Previous Approved COs 13,862.00 Net Time Change By Previous COs 7 days
Contract Sum Before This CO 1,678,562.00 Substantial Completion before This CO
Contract Sum Changed By This CO 10,217.00 Time Changed By This Co 30 days
New Contract Sum 1,688,779,00 New Substantial Completion Date
Ali Change Orders make up 1.46% of the Original Contract
Accounting and Status
Accounting Status
Item Id 421
PO Number 431634 FEMA Number
Accounting Project Code WUP004 Custom Accounting Field 04
Custom Accounting Field 05 Custom Accounting Field 06
Custom Accounting Field 07 Custom Accounting Field 08
Line Items
Item # Account Code
WBS/ Section
Description
Quantity
UoM
Unit Price
Total Amount
Change Order Items
003
403323
liquid Chemical Weighing Equipment
1.00
LS
8,740.00
8,740.00
004
463333
Polymer Blending and Feed Equipment
1.00
LS
8,677.00
8.677.00
005
00000
Flow Meter
1.00
LS
-7,200.00
-7,200.00
Total
10,217.00
Approval Pending
Grand Total: 10,217,00
Due: 31-Jul-2023
Name or Role
1 External -GC
2 Project Manager
3 City Engineer
4 director
5 Admin
6 Assistant City Manager
7 City Clerk
-H— FI0
Approved
Brandon Harrison
20-Jul-2023 03:05 PM CST
Approved
Makenzie Watts
20-Jul-2023 03:30 PM CST
Approved
Amalia "Molly" Villarreal
24-Jul-2023 01:51 PM CST
Approved
Bart Bartkowiak
24-Jul-2023 01:54 PM CST
Pending
Actions
Waiting for previous approvals,
Waiting for previous approvals.
Created by: Brandon Harrison on 11-Jul-2023 Last Modified by: Bart Bartkowlak on 24-Jul-2023
Contract # 002.002
17-Jul-2023 07:03 AM CST
PINE STREET SWTP POLYMER SYSTEM AND CHEMICAL STORAGE TANK IMPROVEMENTS (REBID)
1360 Langham Rd Beaumont, TX 77707
Project Number: WU0422-19
002.002: CO#002.002: Instrument Blind Flange Mounting Assembly
Grand Total: $7,337.00
For 002 PINE STREET SWTP POLYMER SYSTEM AND CHEMICAL STORAGE TANK IMPROVEMENTS (REBID)
Division 99
Line Item Unit price
Type
Group 3.0 Construction
Scope of Change Order No. 2 will add ten (10) additional items not originally a part of the project, to be able to mount the called for new
Work Instrumentation to replace the old instrumentation. This change order Includes adding a blind flange assembly and the necessary labor
for installation of this new assembly at ten (10) chemical storage tanks at the Water Treatment Plant, This is necessary because the
current instrumentatlon being replaced is welded to it's mounting equipment, and said mounting equipment was planned to be used for
the new instrumentation. Additional mounting equipment must be introduced to mount the new Instrumentation.
Notes
Awarded To Allco, LLG
Brandon Harrison
6854
Reason Drawing and Spec Clarification
Code
Days 3
Changed
Attachments
COR-Instrument MouritingAssembly,pdf
Change Order Summary
Original Contract Sum 1,664,700.00 Substantial Completion Date
Net Cost by Previous Approved COs 6,525,00 Net Time Change By Previous COs 4 days
Contract Sum Before This CO 1,671,225.00 Substantial Completion before This CO
Contract Sum Changed By This CO 7,337.00 Time Changed By This CO 3 days
Now Contract Sum 1,678,562,00 New Substantial Completion Date
All Change Orders make up 0.83% of the Original Contract
Accounting and Status
Accounting Status
Item Id 413
PO Number 431834 FE=MA Number
Accounting Project Code WUP004 Custom Accounting Field 04
Custom Accounting Field 06 Custom Accounting Field 06
Custom Accounting Field 07 Custom Accounting Field 08
Line Items
Item # Account Code WBSI Section Description
Change order Items
001 400513A3 Steel Process Piping
Total
Approval Approved
Name or Role
t External -GC
2 Project Manager
3 City Engineer
4 Director
5 Admin
6 Assistant City Manager
7 City Clerk
Status
Approved
Brandon Harrison
12-Jun-2023 10:00AM CST
Approved
Makenzie Watts
12-Jun-202311:25AM CST
Approved
Amalla "Molly" Villarreal
12-Jun-2023 03:15 PM CST
Approved
Bart Bartkowiak
13-Jun-2023 08:48AM CST
Approved
Dara Woodruff
13-Jun-2023 09:44AM CST
Approved
June Ellis
13-Jun-2023 05:39 PM CST
Approved
Tina Broussard
14- J un-2023 09:16 AM CST
Quantity UOM Unit Price Total Amount
Created by: Brandon Harrison on 08-Jun-2023 Last Modified by: Tina Broussard on 14-Jun-2023
1.00 LS 7,337.00 7,337.00
7,337.00
Grand Total: 7,337.00
Due: 21-Jun-2023
Actions
4/21123, 9:42 AM Projectmates Contract
Contract # 00Z001
21-Apr-2023 09:42 AM CST
PINE STREET SWTP POLYMER SYSTEM AND CHEMICAL STORAGE TANK IMPROVEMENTS (REBID)
1350 Langham Rd Beaumont, TX 77707
Project Number: WU0422-19
002.001: CO#002.001: Bollards
Grand Total: $6,525.00
For 002 PINE STREET SWTP POLYMER SYSTEM AND CHEMICAL STORAGE TANK IMPROVEMENTS (REBID)
Division 99
Line Item Unit price
Type
Group 3.0 Construction
Scope of Change Order No. 1 will add two (2) additional items not originally a part of the project, to ensure safety of the now electrical work
Work Installed for this project. Two (2) bollards (a short post meant to divert traffic from a certain area) to be placed on either side of the new
electrical box on the containment wall for the chemical tanks at the sanitary water treatment plant. This box Juts Into the driveway next to
the containment area, more so than anything else the drivers are used to driving near in this area, and that's putting the box In possible
harms way.
Notes
Awarded To Allco, LLC
Brandon Harrison
6854
Reason Owner Requested
Code
Days 4
Changed
Attachments C01-Bollards.pdf
C01-Bollards - Comments.pdf
Change Order Summary
Original Contract Sum
1,664,700.00 Substantial Completion Date
Net Cost by Previous Approved COs
0.00 Net Time Change By Previous COs 0 days
Contract Sum Before This CO
1,664,700.00 Substantial Completion before This CO
Contract Sum changed By This Co
6,525.00 Time Changed By This CO 4 days
New Contract Sum
1,671,225.00 New Substantial Completion Hate
All Change Orders make up 0.39% of the Original Contract
Accounting and Status
httpsllcltyofbeaumorit.projectmates.com/Projectmates/ContractMgmt/oontractPrinterrriendly,aspx?enc=28878D01099DB758OF61 C4C8707E682578... 112
4121 /23. 9:42 AM Projectmates Contract
Accounting Status
Item Id 380
PO Number 431634 FEMA Number
Accounting Project Code WUP004 Custom Accounting Field 04
Custom Accounting Field 05 Custom Accounting Field 06
Custom Accounting Field 07 Custom Accounting Field 08
Line Items
Item # Account Code WBSI Section Description Quantity UoM
Change Order Items
001 030000 Bollards 1.00 LS
Total
/- pprOWII Approved
Name or Role
1 External -GC
2 Project Manager
3 City Engineer
4 Director
5 Admin
6 Assistant City Manager
7 City Clark
Status
Approved
Brandon Harrison
19-Apr-2023 09:43 AM CST
Approved
Makenzie Watts
19-Apr-2023 09:43 AM CST
Approved
Amalia "Molly" Villarreal
19-Apr-2023 05:58 PM CST
Approved
Bart Bartkowiak
20-Apr-2023 08:49 AM CST
Approved
Dara Woodruff
20-Apr-2023 08:53 AM CST
Approved
June Ellis
20-Apr-2023 02:48 PM CST
Approved
Tina Broussard
20-Apr-2023 02:59 PM CST
Unit Price Total Amount
6,525.00 6,526.00
6,525.00
Grand Total: 6,625.00
Due: 27-Apr-2023
Actions
Created by: Brandon Harrison on 30-Mar-2023 Last Modlfed by: Tina Broussard on 20-Apr-2023
https:/Icityoibeaumont.proleGimates.com/Projectmates/ContractMgmtlContractPrinterFrienclly.aspx?enc�28878DO1099DB7580F61 04C8707E682578... 212