Loading...
HomeMy WebLinkAboutRES 23-195RESOLUTION NO. 23-195 BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF BEAUMONT: WHEREAS, on June 14, 2022, the City Council of the City of Beaumont, Texas passed Resolution No. 22-153 awarding a contract in the amount of $3,670,700.00 to King Solution Services, Inc., of Houston, Texas, for the City -Wide Pipe Bursting Contract- Phase I Project; and, WHEREAS, Change Orders Nos. 1-4, in the amount of $488,825.00, are attached for your review; and, WHEREAS, Change Order No. 5, in the amount of $17,500.00, is requested to add one (1) additional bid item to install 56" x 56" square concrete tops at a minimum of 6" higher than the right of way elevation and concrete encasement for five (5) manholes along Jefferson County Drainage District No. 6 (JCDD6) ditch bank in the Piney Point area, Map 1 of the contact plan set, thereby if approved increasing the total contract amount to $4,177,025.00; NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF BEAUMONT: THAT the statements and findings set out in the preamble to this resolution are hereby, in all things, approved and adopted; and, THAT the City Manager be and he is hereby authorized to execute Change Order No. 5, in the amount of $17,500.00 for additional work described above, thereby increasing the total contract amount to $4,177,025.00 for the City -Wide Pipe Bursting Contract- Phase I Project; and, The meeting at which this resolution was approved was in all things conducted in strict compliance with the Texas Open Meetings Act, Texas Government Code, Chapter 551. PASSED BY THE CITY COUNCIL of the City of Beaumont this the 25th day of July, 2023. Contract - 001.005 18-.1ut-2023 07:20 AM CST 001.005: CO # 5: Manhole Top/Encasement Addition For 001 WU1022-02 City Wide Pipe Bursting Contract - Phase I Division 33 Line Item Unit price Type CITY WIDE PIPE BURSTING CONTRACT - PHASE 1 1350 Langham Rd Beaumont, Texas 77707 Project Number: WU4022-02 Grand Total: $17,500.00 Group 3.0 Construction Scope of Change Order No. 5 will add one (1) additional bid item to install 56" x 56" square concrete tops at a minimum of 6" higher than the right - Work of -way elevation and concrete encasement for five (5) manholes along the DD6 ditch bank in the Piney Point area, Map 1 of the plan set. Notes Awarded To King Solution Services LLC Allan Negrete 27738 Reason Owner Requested Code Days 5 Changed Attachments Quote - Concrete encasement and square tops for new manholes.pdf Change Order Summary Original Contract Sum 3,670,700.00 i Substantial Completion Date Net Cost by Previous Approved Cos 488,825.00 j Net Time Change By Previous Cos 60 days Contract Sum Before This CO 4,159,525.00 Substantial Completion before This CO Contract Sum Changed By This CO 17,500,001 Time Changed By This CO 5 days New Contract Sum 4,177,025.00 New Substantial Completion bate All Change Orders make up 13.79% of the Original Contract Accounting and Status Accounting Status Item Id 423 PO Numbor Accounting Project Code Custom Accounting Field 05 Custom Accounting Field 07 Line Items 430946 FEMA Number Custom Accounting Field 04 Custom Accounting Field 06 Custom Accounting Field 08 Item Account WBSI i} Code Section Description 3.0 Construction i 025 GC Contract 00000 Concrete Encasement & Square Concrete Tops for 5 Manholes along DD6 Ditch Bank on Map 1 Total Approval Pending Unit Total Quantity UoM Price Amount 1,00 LS 17,50U0 17,500,00 17,500.00 Grand Total• 17,500.00 Due: 24-Jul-2023 Name or Role Status Actions 1 External -GC Approved Allan Negrete 14-Jul-2023 05:26 PM CST 2 Project Manager Approved John Pippins 17-Jul-2023 01:19 PM CST 3 City Engineer Approved Aim lia "Molly" Villarreal 17-Jul-2023 01:40 PM CST 4 Director Approved Bart Barlkowiak 17-Jul-2023 06:00 PM CST 5 Admin Pending 6 Assistant City Manager Waiting for previous approvals. 7 City Clerk Wailing for previous approvals. Created by: Kevin Young on 14-Jul-2023 Last Modified by: Bart Bartkowiak on 17-Jul-2023