Loading...
HomeMy WebLinkAboutRES 23-174RESOLUTION NO. 23-174 BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF BEAUMONT: WHEREAS, on December 12, 2022, the City Council of the City of Beaumont, Texas, passed Resolution No. 22-339 awarding an emergency contract in the amount of $126,950.00 to To-Mex Construction, LLC, of Houston, Texas, for the Calder Place from Wheat Drive to Brentwood Drive Emergency Repair Project; and, WHEREAS, the project has been inspected by the Water Utilities and found to be complete in accordance with the provisions and terms set forth in the contract; NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF BEAUMONT: THAT the statements and findings set out in the preamble to this resolution are hereby, in all things, approved and adopted; and, THAT the construction of the Calder Place from Wheat Drive to Brentwood Drive Emergency Repair Project be and the same is hereby accepted; and, BE IT FURTHER RESOLVED THAT the City Manager is hereby authorized to make final payment in the amount of $63,200.00 to To-Mex Construction, LLC, of Houston, Texas. The meeting at which this resolution was approved was in all things conducted in strict compliance with the Texas Open Meetings Act, Texas Government Code, Chapter 551. PASSED BY THE CITY COUNCIL of the City of Beaumont this the 27th day of June, 2423. a 71, ayor Roy West - 1/18123, 3:69 PM Projectmates Contract Contract # 001,002 18-Jan-2023 03:59 PM CST 001,002: Change Order No. 2 CALLER PLACE EMERGENCY PIPE BURSTIN' 1350 Langham Rd Beaumont, Texas 7770 Project Number. PO-43203 Grand Total: $68,200.00 For 001 Calder glace Emergency Pipe Bursting Division 33 Lino [tam Lump sum �Pe Group 3.0 Construction Scope of To add additional work to directlona0y bore and replace approximately 150 LF section of 8-Inch sanitary sewer Ilne between manholes Work 435 and 434 on the Calder Place Emergency Pipe Bursting Plan Sheets. Notes This additlonal work Is required to correct the grade of the line that has dropped approximately 2 VF and has caused a reverse Now of thi sewer line. Awarded To To-Mex Construatton LLC Marlbel Torres Reason Unforsaan Site Conditions Code Days 40 Changed Attachments Calder Emergency Job CO 2 Quote.pdf Calder Place Emergency Pipe Bursting Plans (Executed).pdf Change Order Summary Original Contract Sum Net Cost by Previous Approved Cps Contract Sum Before This CO ContractSum Changed By This CO New Contract Sum At Change Orders make up 49.78% of the Original Contract Accounting and Status Accounting Status s 12G,950.00 jSubstantial Completion Date 6,000,00 Net Time Change By Previous COS 7 days 131,060.00 (Substantial Completion before This CO f 58,200.00 Time Changed By Tills Co 40 days 190,160.00 ( New Substantial Completion Date https:llcttyofbeaumoat.prajeolmotes.comlprojoolmateslContractmgD tfcontractPrinterFriondly.aspx?eno=28878DO1089DB7580F61C400707E682578... Exhibit «A„ 1/18123, 3:50 PM Projectmates Contract Item ld 343 PO Number 432030 1 FEMANurnbor Accounting Project Code i Custom Accounting Field 04 Custom Accounting Field 06 1 Custom Accounting Field 06 Custom Accounting Field 07 .-.Custom Accounting Field 08 Line {teats Item N Account Code WB51 Section Description Change Order No. 2 004 GC CONTRACT 004 Dlroctlonaily bore and Install approximately 160 LF of 8.625" HDPE Sewer Line 006 GC CONTRACT 005 Point Repair Between MH 437-436 006 GC CONTRACT 006 Well Polnftng i' Dowatering System 007 t30 CONTRACT 007 install New Manhole - MH 794A Total Approval Approved Name or Role Status 1 External -GC Approved Marlbel Torras 18-Jan-202311:16 AM CST 2 Project Manager Approved John Pippins Ie-Jan-2023 01:24 PM CST 3 City Engineer Approved Amalla "Molly" Villarreal I6-Jan-2023 03:04 PM CST 4 Director Approved Bart eertkowlak I8-Jan-2023 03:36 PM CST 6 Admin Approved tiara Woodruff 10-Jan•2023 03:69 AM CST Created by: Kevin Young on 18-Jatt-2023 Fast Modred by: Darn Woodruffon 18-Jan-2023 Total Amount 33,000.00 4,200.00 12,000.00 9,000.00 68,200.00 Grand Total: 68,200.00 Due: 26-Jan-202 Actions APPROVED 13Y: ATTESTED BY: Kenneth R. Williams Date Tina Broussard Date City Manager City Clark Contract # 001.001 18-Jan 2023 09.56 AM CST CALDER PLACE EMERGENCY PIPE BURSTU 1350 Langham Rd Beaumont, Texas 7770; Project Number: PO-43203t 001,001; CHANGE ORDER NO. 1 Grand Total, $5,000.00 For 001 Calder place Emergency Pipe Bursting Division 33 Line Rom Lump sum Type Group 3.0 Construction scope of To Mobilize and CCTV approximately 385 LF of sanitary sewer main between manholes 436 and 434 to determine where the elevation of Work the sewer line begins to drop. Notes Awarded To To-Mex Construction LLG Marlbei Torres Reason Owner Requested Code Days 7 Changed Attachments Quote for CCTV from MI-{436 - MH434.pdt Change Order Summary Original Contract Sum Net Cost by Previous Approved COB Contract Sum Before This GO Contract Sum Changed By'rhis GO Now Contract Sum Ati Change Orders make up 3,94% of the Original Contract Accounting and Status 126,950.001Substantial Completlon Date 0.001 Net Time Change Sy Previous COB 0 days 126.950.00 Substantial Completion before This CO 5,000.00 Time Changed Ry This CO 7 days 131,960.00 Now Substantial Completion pate Accounring Status r Item Id PO Number Accounting Project Cade Custom Accounting Field 05 Custom Accounting field 07 341 ] 432036 FEMANumber 1CustomAccounting Field 04 �CustomAacounting Field 08 (Custom Accounting Field 08 LIne Items Item # Account Code WBSI Section Description Contract Items 002 GC CONTRACT 002 003 GC CONTRACT 003 Total ApproVa! Approved Name or (tole A External -GC ' 2 Project Manager 3 City Engineer 4 Director 5 Adman Change Order No. 1 Mobilization CCTV approximately 384 LF between MH436 to MH434 Status Approved Marlbel Torres 18-Jan2023 09:26 AM CST Approved Kevin Young 18-,tan-2023 09:45 AM CST Approved Amapa "Nally" Villarreal • I8-Jan-2023 09:61 AM CST Approved Bart Hartkowlak 18-Jan 2023 08:67 AM CST Approved Para Woodrutr 18-Jan 2023 09:50 AM CST Total Amount 3,000A0 i 'i,500.00 6,000,00 Grand Total: 6,000.00 Due. 25-Jan 2023 Actions Created by: Kevin Young on 04-Jan-2023 Last Modified by: Dara Woodruff on.78-Jan 2023 . APPROVED BY: EST%D RM r- l�enneth R, Williams Date Tina Broussard Date City Manager City Clekk