HomeMy WebLinkAboutRES 23-163RESOLUTION NO. 23-163 BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF BEAUMONT: WHEREAS, on April 12, 2022, the City Council of the City of Beaumont, Texas passed Resolution No. 22-108 awarding a contract in the amount of $25,088,259.00 to Allco, LLC, of Beaumont, Texas, for the Collier's Ferry Pump Station Project; and, WHEREAS, Change Order No. 1, in the amount of $152,935.00, increased the contract price to $25,241,194.00; and, WHEREAS, proposed Change Order No. 2, in the amount of $18,900.00, is required to re-route a power pole along with an overhead electrical crossing over Pine Street; and, WHEREAS, Entergy has agreed to remove the overhead powerline, power pole, and bore an underground electrical line to power the Pine St. Lift Station; and, WHEREAS, Change Order No. 2 includes the cost of work by Allco's electrical subcontractor, ESI, to connect that underground electrical line to the existing Pine St. Lift Station; and, WHEREAS, if approved, Change Order No. 2 will result in a new contract amount of $25,260,094.00; and, NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL. OF THE CITY OF BEAUMONT: THAT the statements and findings set out in the preamble to this resolution are hereby, in all things, approved and adopted; and, THAT the City Manager be and he is hereby authorized to execute Change Order No. 2, in the amount of $18,900.00 for additional work described above, thereby increasing the total contract amount to $25,260,094.00 for Collier's Ferry Pump Station Project; and, The meeting at which this resolution was approved was in all things conducted in strict compliance with the Texas Open Meetings Act, Texas Government Code, Chapter 551. PASSED BY THE CITY COUNCIL. of the City of Beaumont this the 13th day of June, 2023. �s iy Mayor Roy West - i 11200 Broadway St., Sulte 2320 i Pearland, Texas 77584 * 832-456-4700 + FAX 817-735-7491 June 1, 2023 Evangeline Burkart, EIT Roadway Designer City of Beaumont 1350 Langham Road Beaumont, TX 77707 Re: Project WU0222-14 Collier's Ferry Pump Station; Change Order No. 002 Dear Ms. Burkart: www.f reesexonl Included with this letter Is Change Order No. 002 for the Collier's ferry Pump Station project. This letter is to serve as a narrative for the Item(s) Included in this Change Order with supporting documentation attached, Item No, 1: Electrical Work at Pine St, Lift Station Shortly after Allco mobilized to site a power pole, along with an overhead electrical line crossing over Pine St., was Installed to energize the Pine St. Lift Station. This project includes Improvements to Pine St. along with installing an access road to the Collier's Ferry PS that has a proposed road surface elevation of 18.90 FT MSL which is -14 FT higher than the existing surface elevation of Pine St. This means that the overhead electrical line must be removed, Entergy has agreed to remove the overhead line and power pole and bore an underground electrical line to power the Pine St, Lift Station. This change order covers the work required by Allco's electrical subcontractor ESI to connect that underground electrical line to the existing Pine St. lift Station. Allco submitted the attached CP-002 with a total cost of $18,900,00 and 14 additlonal calendar days, Freese & Nichols, Inc. has reviewed their proposal and agrees with their cost but at this tlme can't recommend the additional calendar days as this will be concurrent work and not Impede the project's critical path. Allco still has the right to submit a subsequent claim for additional clays if this Change Order causes any substantiated delays. Total Cost: $18,900.00 Additional Days: 0 Calendar Days To summarize, this Change Order has an overall cost Increase of $18,900,00 and 0 additional calendar d. ays to the contract time. I hope the above narrative, along with the Included supporting documentation, provides adequate Information to be able to process this Change Order In a timely fashion, Please don't hesitate to reach out to me If you need any further explanation or backup documentation. Sincerely, Raml Abushelkh, P.E. Constructlon Manager cc; Molly Villareal, Brent Schmitt, Sheldon Buck, Lindsey Reid BMT22198 T;\4,0 CONSTRUCTION\4.40 Contract Mod\4.43 Ch8 Orders\CO-002 - Pine SL LS Electrical Work Change Order No. 2 Project Collier's Forry Pump Station Project Numbor Owner City of Beaumont TX _. WU0222--14 Contractor Allco, LLC ----.. —_ _ TX 881 Construction Manager Rami Abushelkh, P.E. - BIAT221.98 Design Professional Sheldon Buck, P.E ___._...._ _. BMT22198 Change Order No, 002 Date 5/16/2023 Make the following modifications to the Contract DOCUrnentS; Item Description Change Amount 1 Electrical Work at Existing Pine St, Lift Station per CP-002 $ 18,900.00 2 --------------- .------------------------------------------------------------ .-------------- ..----------------- 5----------------------------------- -------------------------------------------------------- ..---------------- 4-----------_----------------------..-_________-----_--_----_-_____.---_-_..-------------------__---__- ..___ -------------------------------------------------------------------------------_-__-__-_---------------- 6---------..------------------------------------••---------------------- _----------------------- 7---------------------------------------------------------------------------------.._... ---I-_---------------- S 9--------------------------,____._--_-_-_-_____-___-_--__--_--___-____.___-_-----------------_-_-..-_-__-_.._ Net Change in Contract Price this Change order $1.8,900.00 Net Change In Contract Times this Change Order 0 Days The compensation in this Change Order is the full, complete, and final compensation for all costs Contractor may incur because of or relating to this change whethersold costs are known, unknown, foreseen, or unforeseen at this time, including without limitation, any costfor delay, extended overhead, ripple or impact cost, or any other effect on changed or unchanged Work because of this Change Order, The changes it) Contract Times are the complete and final adjustments for impacts to the ability of Contractor to complete the Work within the Contract Times and are the only adjustments to which Contractor is entitled. All terms and provisions of the Contract Documents remain it) effect except as specifically modified by this change Order. a. Original Contract Price $ 25,088,259.00 b. Previously Approved Change order/Contract Amendment Amounts $ 1.52,935.00 c, Adjusted Contract Price ( a + b) $25,241.,1.94.00 d, Contract Amendment Amount $18,900.00 e. Revised Contract Price (c + d ) $ 2.5,260,094.00 f. Percent Change in Contract Price to Date 0.69 Original PrevIOUS Current Suhstantial Completion Date 10/14/2024 10/14/2024 — 10/14/2024 Final Completion Date—12/13/2024 - 12/13/2024 12/18/2024 Change Order No. 2 Page 1 of 2 Prepared by Construction Manager; amiAbushelkh, P.L. Construction Manager Freese and Nichols, Inc. mutligu VIutu ]VV. G Reviewed by Resign Professional: 6/6/2023 , � / 6/6/2023 Date Sheldon Buck, P.F. Date Project Manager Freese and Nichols, Inc. Accepted bVIson tor: Reviewed by: Brandon Hair Date Evang lhie Burkart, EIT Date Vice -President Roadway Designer Allco, LLC City of Beaumont Reviewed by; Amalla Villarreal. P.F. City Engineer City of Beaumont Approved By; Kenneth R. Willia►ns City Manager City of Beaumont :Re7viYed; Date Bat Bartkowlak Date Director of Public Works City of Beaumont Attested By., Date Tina Broussard, TRMC City Clerk City of Beaumont Date Change order No. 2 Page 2 of 2 May 1.0, 2023 Freese & Nichols 10497 Town & Country Way, Sulte 500 Houston, TX 77024 Attn: Rand AhLishelldo Re: City of Beaumont Collier's Ferry Pump Station Change Proposal 2—Electrical Modifications @ Pine St Lift Station Dear Mr, Abushelkh: Allco proposes the following change order to perform electrical modifications at the pine Street Lift Station: DESCRIPTION COST SUMMARY See attached quote from ESI for details; Excludes any Entergy related work, saw cutting If needed, etc. Time Extension--14 Calendar Days ITEM LABOR MATERIALS SUBCONTRACTOR MARKUi'IOH TOTAL Electrical $0,00 $0.00 $18,000.00 $900.00 $1.8,900.00 Mods @ fine St Lift Station please contact the undersigned If you have questions or Issues regarding this matter. Respectfully, Alico, LLC Brandon Harrison PROPOSAUCONTRACT Date., � 31�1712023 � f�rnject W�.Y� Electrical Specialties, it-rc. 1660 L.atlgham Rd Beau rnwit, Texas 77707 Phone (409)860.6211 Fax (409)860.6861 TM.R V117109 Regulated by the Texas DLR P.O. Box 12157 Atlstin, Texas 78711 (800)803-92021(512)463="r5599 �vw�v,idealise.slale.fx.trs/campfaitlts CRMIT TERMS: NLT 30 DAYS involeos oro srrhSeat to R Irnarlcc ohnrac of 1,611, ;IV( MtrQt4, ormtin I rMe aria,,. on all �rainnccs aver 30 days. Any rd all rnlnrndlto will he pnld w111dn 3n r€ays from 0m oomplellm) of elea eat work. MW Will abide by the lloa provlolans of chapter 63 vrlhe pro party coda ottho State orTaxns. Via 4n3dersrgned l,archasor Hereby nproes to pay altornoy s fees Incurred by �61 to collect trnpald batances. Work por€ormed for: Tho City Of Beaumont Calliers Ferry This change order is to provide labor and materfalst❑ reconnect Entergy to the pine St, lift station due to the relocation of Fritergys poles. Rase bid. $18,000.00 -reakdowrl Labor! $9,000.00 Underground: $1,000.00 Materials, $8,0000,00 Includest I ibor,Cleartaps, J-box,condult, rnlsc rnateriMs. Excludes: Sawcutting road, Traffic control, backtlll, replacing concretes or asphalt, removal of spot€s from site. dumpster fees, Tax, Any fees from Elltergy TX,replacingwire to existing meter, temporary power. Scope of Work: Iasi will be fnstalling a )-box Inside the lift stalon and reworking the fain feed conduit to meet Entergy. Entergy will be providing boring, conduit and wire from the new pole to the d-box. Tem pony powert❑ the I)ft station will not be provided by hSl, but we will cordinate with the City of i3P�Urnollt, PRIM stls,ft~cr To Rr_ M APMR Stl DAYS S010S Tax InGlrfdOd D No Sales Tax 1] ACCEPTANCE, OF J31D I hove ilia authority to ardor (Ito above work anti do so order as oullhind abovo. Tho above slrpoltica(fcrns, fauns and rtilrtraat pro satlnfavlory, and (1)/(wa) hereby aathorixra the f orformance of this work, CUSTCIMER SIONATURC � T1TL Dale 31 '1tz1 9 10114 aUrn4 Pro)eot Illartagor- Sfentriafil Speclaltlhs, Inc, Date R e Beaullilol tj 'T en 9 77/707 Callier's CerrV C/O for tine St lift station service Relocation — Quoted By: Shane Burns Below is cost associated with the relocation of an existing Service feed at the Pine St. Lift Station. Price includes all conduit, shutdown and re -connect of existing service equipment (to he coordinated with the City of Beaumont and Allco), Installation and tie in to new J-box, re- work of existing conduit to meet the new J-box, hand digging to capture existing underground feed to Provide adequate cable length to facilitate the relocation, grounding of the new J-box to existing ground ring, and all labor associated, Base Bid: $18,00UG Breakdown: Labor:$9,000,00 Misr-, Electrical materials: $8,000.00 Underground- $1,000.00 Includes: 1-24"x24"x Ir hinged, lockable N813 J-1 ox (rntergy Standard) 4- Clear tap 8 port(for Connection to rntergy) 2�r� 18,r Uni-Strut S.S. 2-Uni-Strut base reet S.S. Misc nuts, bolts, spring nuts 4-bags sack concrete 8" Sauna tube 20'- #4 copper 20'-2" Al, Rigid conduit Excludes: tax, removal of existing duct Bank concrete and materials from site, and any dumpster fees or overtime work. 11200 Broadway St., SUIte 2320 + Pearland, Texas 77584 + 832-456-4700 + FAX 817-735-7491 Evangeline Burkart, EIT Roadway Designer City of Beaumont 1350 Langharn Road Beaumont, TX 77707 Re Project WU0222-14 Collier's Ferry Pump Station: Change Order No. 002 Dear Ms. Burkart: www.fi-eese.coni Included with this letter is Change Order No. 002 for the Collier's Ferry Pump, tation project. This letter is to serve as a narrative for the item(s) included in this Change Order with supporting documentation' attached, r Shortly after Allco mobilized to site a power pole, along with an overhead electrical line crossing over Pine St., was installed to energize the Pine St. Lift Station. This project includes improvements to Pine St. along with installing an access road to the Collier's Ferry PS that has a proposed road surface elevation of 18.90 FT MSL which is —14 FT higher than the existing surface elevation of Pine St. This means that the overhead electrical line must be removed. Entergy has agreed to remove the overhead line and power pole and bore an underground electrical line to power the Pine St. Lift Station. This change order covers the work required by Allco's electrical subcontractor ESI to connect that underground electrical line to the existing Pine St. Lift Station. Allco submitted the attached CP-002 with a total cost of $18,900.00 and 14 additional calendar days. Freese & Nichols, Inc. has reviewed their proposal and agrees with their cost but at this time can't recommend the additional calendar days as this will be concurrent work and not 'Impede the project's critical path. Allco still lias the right to submit a subsequent claim for additional days 'if this Change Order causes any substantiated delays. Total Cost: $18,900.00 Additional Days: 0 Calendar Days To summarize, this Change Order has an overall cost increase of $18,,900.00 and 0 additional calendar to the contract time. I hope the above narrative, along with the 'Included supporting documentation, provides adequate information to be able to process this Change Order in a timely fashion. Please don't hesitate to reach out to me if you need any further explanation or backup documentation. Sincerely, Rami Abusheikh, P.E. Construction Manager cc: Molly Villareal, Brent Schmitt, Sheldon Buck, Lindsey Reid BMT22198 T-A4.0 CONSTRUCTION\4.40 Conti -act Mod\4.43 Chg Orders\CO-002 - Pine St LS Electrical Work ChanRe Order No. 2 Project Collier's Ferry Pump Station Project Number Owner City of Beaumont TX WU0222-14 Change Order No. 002 Date 5/16/2023 Make the following modifications to the Contract Documents: Item Description Change Amount I Electrical Work at Existing Pine St. Lift Station per CP-002 $ 18.1900.00 Net Change in Contract Price this Change Order $187900.00 Net Change in Contract Times this Change Order 0 Days The compensation in this Change Order is the full, complete, and final compensation for all costs Contractor may incur because of or relating to this change whether said costs are known, unknown, foreseen, or unforeseen at this time, including without limitation, any costfor delay, extended overhead, ripple or impact cost, or any other effect on chonged or unchanged Work because of this Change Order. The changes in Contract Times are the complete and finol adjustmentsfor impacts to the ability of Contractor to complete the Work within the Contract Times and are the only adjustments to which Contractor is entitled. All terms ond provisions of the Contract Documents remain in effect except asspecifically modified by thi's Change Order. a. Original Contract Price $ 25,088,,259.00 b. PrevIously Approved Change Order/Contract Amendment Amounts $ 152�935.00 c. Adjusted Contract Price ( a + b $25,,241,194.00 d. Contract Amendment Amount $181Y900.00 e. Revised Contract Price ( c + d $ 25,260,094-00 f. Percent Change in Contract Price to Date 0.68 % Original Previous Current Substantial Completion Date 10/14/2024 10/14/2024 10/14/2024 Final Completion Date 12/13/2024 12/13/2024 12/13/2024 Change Order No. 2 Page 1of2 . .... ..... .. n "A it busheikh, P.E., Construction Manager Freese and Nichols, Inc. 7lLLcl ,7 llco Reviewed by,. Amalia Villarreal. P.E. City Engineer City of Beaumont 6/6/2023 1 . 'e".04, / IJ44ell 6/6/2023 Sheldon Buck, AL Project Manager Freese and Nichols, Inc. I Date Evang9fine Burkart, EIT Roadway Des" City of Beaumont 7 Date Date Change Order No. 2 Page 2 of 2 P.O. Bo)(3684, Beaumont, Texas 77704 Phone: 409-860-4459 Fax: 409-860-3857 11 Emall: allco@aHco.com ammus =0 Freese & Nichols 10497 Town & Country Way, Suite 500 Houston,, TX 77024 Attn: Rami Abushell(h Re: City of Beaumont Collier's Ferry Pump Station Change Proposal 2—Electrical Modifications @ Pine St Lift Station Allco proposes the following change order to perform electrical modifications at the Pine Street Lift Station,: See attached quote from ES1 for details- Excludes any Entergy related work, saw cutting if needed, etc. Electrical $0. 0 Mods @ Nine St Lift Station Please contact the undersigned if you have questions or issues regarding this matter. Respectfully, Allco, LLB: Brandon larrison Date 3117120 3 PROP OSALtCONTRACT Project #� Electrical Specialties, Inc,, 1560 Langham Rd Beaumont, Texas 77707 Phone (409)860-5211 Fax (409)860-5861 TDLR #17409 Regulated by the Texas oLR P.O. Box 121S7 Aajstln, Texas 78711 (800)803-9202 / (512)4616599 ,vvwwAicense.state.tx.us/comp taints CREDIT TERMS: NET 30 DAYS lnvolces are sub ect to a finance ebarge of 1,601oo, per month, annual rate 'of 10,116 on all ba a�nces over 3D days. A�r1y and all retalnage W11 be paid vrithin 30 days from the cc�rnpletiOn Of �leotrieat work. ESl 41 abide by the Hen provlslons otchapter 63 of the property Cade of the State of Texas. The undersigned purchaser hereby agrees to pay attorneyIs fees incurred by ESI to collect tmpatd balances. all Work performed for: The City Of Beaumont Calliers Ferry This charge order is to provide labor and materials to reconnect Entergy to the Pine St. lift station due to the relocation of Entergys poles. Base bid: $ 18,000.00 Breakdown Labor: $9,000.00 Underground' 1,000.00 Materials: $9,0000,00 Includes: Labor,Cleartaps, J-box,conduit, rntsc rnatenals. Excludes: Sawcutting road, Traffic control, backflll, replacing concreti� or asphalt, removal of spoils frorn site. du m pster f ees, Tax, Any fees from E nterg TX,repladbg wire to existing meter, temporary power. Scope of Work: Esj will be installing a i--box inside the lift stalon and reworking the main feed conduit to meet Entergy. Entergy will be providing boring, conduit and Wire from the. new pole to the J-box. Temporary powerto the lift station will not be provided by ESl, but we will cord'nate with The sty of Beaumont,, PRICE SUBJECT TO REVIEW ArTER 34 DAYS Sales TaX Included El No Sales Tax � ACC5PTANCE OF 131D i have the aut#parity to order the above work and do so order as outlined abovs. The above specification$, terMs and contract are sattsfactory, and (i)f(we) hereby authorize the performance of this work. CUSTOMER SIGNATURE TITLE Late 'D&Ut-'a'-J �U44'e' shano Burn Protect Manager-- r3ectricai Specialties, Inc. Date 11.1-lectrical Spenalfles hnc, 1550 Langham Md. Beraumont., Tex.,as 7"717(V 409,,-860-5211 Caliier's Ferry C/O for Pine St lift station service Relocation"- Quoted By: Shane Burns Belot is cost associated with the relocation of an existing Service feed at the Pine St. Lift Stat'[Qn. price includes all conduit, shutdown and re -connect of existing service equipment (to be coordinated with the City of Beaumont and Allco), installation and tie in to new J-box, re- work of existing conduit to meet the new J -box, hand digging to capture existing underground feed to provide adequate cable length to facilitate the relocation, grounding of the new J-1 ox to existing ground ring, and all labor associated. Base Mich: $18t000,400 krpnjtr n%Ajri 4 Labor.-9,000.00 Misc. Electrical materials; $8,000.00 Underground; 1,000-00 Includes: 1-2exM"x 12" hinged, lockable N3R. -box (Entergy Standard) 4- Clear tap 3 port(for Connection to Entergy) U n i- St rut S.S. 2-Uni-Strut base Feet S.S. Misc ruts, bolts, spring nuts 4-bags sack concrete 8" Sauna tube 20'_ #4 copper 20'4' Al. Rigid conduit Excludes: tax, removal of existing duct hank concrete and materials from site, and any dumpster fees or overtime work,