Loading...
HomeMy WebLinkAboutRES 23-148RESOLUTION NO. 23-148 BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF BEAUMONT: THAT the City Manager be, and he is hereby, authorized to award a contract to Vortex Companies, of Houston, Texas for the Long Street Grouting Repairs Project in the amount of $2,444,071.28. The agreement is substantially in the form attached hereto as Exhibit "A," and made a part hereof for all purposes. The meeting at which this resolution was approved was in all things conducted in strict compliance with the Texas Open Meetings Act, Texas Government Code, Chapter 551. PASSED BY THE CITY COUNCIL of the City of Beaumont this the 23rd day of May, 2023. 1MOVyj.%1�111 iMayor Roy est - linin systems To: City Of Beaumont Contact: Evangeline Burkart, EIT Address: 801 Main Street Phone: 409.880.3720 Room 315 Email: Evangeline. Burkart@beaumonttexas.gov Project Name: TX - Beaumont - 7.5'Hx5'W Storm Rehab Grouting Bid Number: I 2212787-4 Project Location: Beaumont, TX Bid Date: 5/9/2023 Proposal is based on HGAC Contract # TP07-18 Item # Item Description Estimated Quantity Unit Unit Price Total Price PIS Travel And Mobilization- TML Region 16 (Golden Pine & 1.00 EACH $4,784.00 $4,784.00 Oil -Beaumont) F51 High Density Urethane For Grouting, Slab Lifting, Void 200,264.00 LB $12.00 $2,403,168.00 Filling, Pipe Sealing Etc.(5001b.min) - Chemical Grouting 73x5' Storm Sewer Based On GPR Study Bid Price Subtotal: $2,407,952.00 Total Performance & Payment Bond 1.50%: $36,119.28 Total Bid Price: $2,444,071.28 Notes: • If necessary, Owner will provide Permits & Fees. Vortex will provide our standard insurance coverage. Longshoreman and / or railroad insurance is not Included. • Our Bid Proposal is valid for 30 days from the date listed on the proposal. • Standard wages are included. Therefore, Prevailing wages and or Union Wage Rates are not included in this bid proposal. • Our bid proposal as submitted reflects the current material pricing established on or before the bid date listed within our proposal. In the event of unforeseen price increases of our raw materials, Vortex reserves the right to adjust our unit rate or overall bid proposal accordingly to account for such price increases. • Payment terms: Net 30 days. Interest will be added to balances outstanding after 30 days • Vortex's bid proposal shall be Incorporated into the subcontract agreements. Vortex will initiate this project upon an agreement or receipt of a subcontract or purchase order. Copies of payment and performance bonds must be provided to Vortex. • • Proposal does NOT include following: • obstruction removal • Heavy infiltration control (see note below) • Point repairs or pipe jacking • Well point/dewatering to lower water table • Site clearing or excavation • Vortex is not responsible for any liquidated/consequential damages due to scheduling conflicts. • Owner will provide Railway permits and / or Railroad Flaggers (if required). • 200,264 LBS is our anticipated quantities but we will invoice based on actual LBS installed. ACCEPTED: CONFIRMED: The above prices, specifications and conditions are satisfactory and Vortex Lining Systems are hereby accepted. Buyer: Signature: Date of Acceptance: Authorized Signature: Estimator: Brandon Gerber (813) 326-8928 Bgerber@vortexcompanies.com Page 1 of 1 "Exhibit A"