Loading...
HomeMy WebLinkAboutRES 23-146RESOLUTION NO. 23-146 BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF BEAUMONT: THAT the City Manager be, and he is hereby, authorized to award a contract to Allco, LTD, of Beaumont, Texas for the 23rd Street Emergency Cavity Repair Project in an amount not to exceed $145,000.00. The agreement is substantially in the form attached hereto as Exhibit 'A" and made a part hereof for all purposes. The meeting at which this resolution was approved was in all things conducted in strict compliance with the Texas Open Meetings Act, Texas Government Code, Chapter 551. PASSED BY THE CITY COUNCIL of the City of Be,4umont this the 23rd day of May, 2023. i � •• S c& `11 - Mayor Roy '(Nest - BEAUMONT TEXAS May 11, 2023 City of Beaumont Purchasing Department 801 Main Street, Suite 320 Beaumont, Texas 77701 Re: N 23rd Street Cavity Repair Emergency Repair This letter is to inform you that the City of Beaumont was notified about a cavity behind the back of curb at 1570 N 23rd Street. Upon visiting the site, we observed a cavity approximately 25 feet long that drops about 7 feet deep. This cavity extends several feet under the roadway, undermining the concrete pavement. It appears that a 42-inch pipe maintained by the City has failed where It ties in to the 7'x10' box culverts maintained by Drainage District 6. The immediate concern is stabilizing the cavity before it expands in size and undermines the roadway further. Additional exploratory excavation is needed to determine if there is a failure that cannot be seen from the surface on the 7'x10' box culvert before repair to the 42" storm sewer line. Once the extent of the damage is determined, then repairs can begin. We have secured a contractor to address this issue, ALLCO, who can begin the exploratory excavation tomorrow, which is the earliest they can mobilize the necessary equipment. They were selected based on their prior experience in storm sewer repair and construction. Due to the potential threat of this cavity expending in size and causing a major failure in the roadway, as well as the potential to impede drainage for this area, Public Works/Engineering has determined that the repair of this cavity, and storm sewer line, must be performed on an emergency basis. If you have any further questions, please feel free to contact me at (409) 880-3725. SincereI 41 Bart Bartkowiak Director of Public Works PUBLIC WORKS 0 T 409.880.3725 F 409.880.3732 PO Box 3827 Beaumont, TX 77704 801 Main St.1201 Floor I Beaumont, TX 77701 beaumonttexas.gov "Exhibit A" DESIGN BUILD CONSTRUCTION MANAGEMENT GENERAL CONTRACTOR P. O. Box 3684, Beaumont, Texas 77704 Phone: 409-860-4459 Fax: 409-860-3857 Email: alico@allco.com May 11, 2023 Attn: David Tingle City of Beaumont 801 Main Street Beaumont, Texas 77701 Re: Storm Sewer Repair — 1570 North 23`d Street Dear Mr. Tingle: Please find attached, our equipment and labor rates to perform the emergency repair at 1570 North 23`d Street. These rates will be marked up 15%, as will all material and other expenses needed to perform this repair. Completed Daily Field Work Orders will be submitted, along with any invoices, when we bill the city upon completion. We have estimated a Not To exceed Cost of One Hundred Forty -Five Thousand Dollars and No Cents ($145,000.00). This pricing is based on the scope of work, discussed during our site visit of May 10, 2023. Let me know if you have any questions. Sincerely, ALLCO LLC Keith Burrell