HomeMy WebLinkAboutRES 23-054RESOLUTION NO. 23-054
BE IT RESOLVED BY THE CITY COUNCIL
OF THE CITY OF BEAUMONT:
WHEREAS, on May 24, 2022, the City Council of the City of Beaumont, Texas
passed Resolution No. 22-137 awarding a contract in the amount of $945,290.02 to
Texas Drainage, Inc., of Waller, Texas, for the FY22 Citywide Ditching Program; and,
WHEREAS, Change Order Nos 1-2 in the amount of $30,350.30 are attached for
your review; and,
WHEREAS, Change Order No. 3, in the amount of $15,367.08, is required to
adjust the estimated quantities in the contract to reflect the actual quantities used in the
completion of the project, if approved the adjustment in quantities would request in a
final contract amount of $991,007.40; and,
WHEREAS, the project has been inspected by the Engineering Division and
found to be complete in accordance with the provisions and terms set forth in the
contract;
NOW, THEREFORE, BE IT RESOLVED BY THE
CITY COUNCIL OF THE CITY OF BEAUMONT:
THAT the statements and findings set out in the preamble to this resolution are
hereby, in all things, approved and adopted; and,
THAT the City Manager be and he is hereby authorized to execute Change
Order No. 3, in the amount of $15,367.08, for additional work described above, thereby
increasing the total contract amount to $991,007.40 for the FY22 Citywide Ditching
Program; and,
BE IT FURTHER RESOLVED THAT the FY22 Citywide Ditching Program be and
the same is hereby accepted; and,
BE IT ALSO RESOLVED THAT the City Manager is hereby authorized to make
final payment in the amount of $74,430.88 to Texas Drainage, Inc., of Waller, Texas.
The meeting at which this resolution was approved was in all things conducted in
strict compliance with the Texas Open Meetings Act, Texas Government Code, Chapter
551.
PASSED BY THE CITY COUNCIL of the City of Beaumont this the 14th day of
February, 2023.
- Mayor Robin Mouton -
RESOLUTION NO.22-281
BE IT RESOLVED BY THE CITY COUNCIL OF THE
CITY OF BEAUMONT:
WHEREAS, on May 24, 2022, the City Council of the City of Beaumont, Texas
passed Resolution No. 22-137 awarding a contract in the amount of $945,290.02 for the
Citywide Ditching Program Phase I and,
WHEREAS, Change Order No. 1, is required in the amount of $22,840.34, to
adjust three (3) additional driveway culverts that were found to be off in elevation, add
headwall replacement for a driveway, and an additional 3,243 linear feet of ditching to
reflect the work that was completed in Wards 2 and 3. No additional days will be added
to this contract for additional work; and,
WHEREAS, the project has been inspected by the Water Utilities Division and
found to be complete in accordance with the provisions and terms set forth in the
contract; and,
NOW, THEREFORE, BE IT RESOLVED BY THE
CITY COUNCIL OF THE CITY OF BEAUMONT:
THAT the statements and findings set out in the preamble to this resolution are
hereby, in all things, approved and adopted; and,
THAT the City Manager be and he is hereby authorized to execute Change
Order No. 1, in the amount of $22,840.34 for additional work described above thereby
increasing the total contract amount to $968,130.36 for the Citywide Ditching Program
Phase I; and,
EXHIBIT "A"
BE IT FURTHER RESOLVED THAT the Citywide Ditching Program Phase I; be
and the same is hereby accepted; and,
BE IT ALSO RESOLVED THAT the City Manager is hereby authorized to make
final payment in the amount of $22,840.34 to the Citywide Ditching Program Phase I.
The meeting at which this resolution was approved was in all things conducted in
strict compliance with the Texas Open Meetings Act, Texas Government Code, Chapter
551.
PASSED BY THE CITY COUNCIL of the City of Beaumont this the 25th day of
October, 2022.
- Mayor Robin Mouton -
Contract - 002.003
07-Feb-2023 09:13 AM CST
FY22 City Wide Ditching Program
801 Main Street Beaumont, Texas 77701
Project Number: PW0222-11
002.003:
Change Order No. 3 - Final
Grand Total: $15,367.08
For
002 FY22 Ditching Construction
Division
00000
Line Item
Unit price
Type
Group
3.0 Construction
Scope of
Additional 4,071 LF of ditching in Ward 3 and additional 5.63 SY of remove and replace concrete to to reflect the actual amount of work
Work
completed.
Notes
Awarded To
Texas Drainage, Inc.
Rosemary Selvidge
28345
Reason Quantity Adjustment
Code
Days 0
Changed
Attachments
Change Order Summary
Original Contract Sum
945,290.02
Substantial Completion Date
Net Cost by Previous Approved Cos
30,350.30
Net Time Change By Previous Cos 0 days
Contract Sum Before This CO
975,640.32
Substantial Completion before This CO
Contract Sum Changed By This CO
15,367.08
Time Changed By This CO 0 days
New Contract Sum
991,007.40
New Substantial Completion Date
All Change Orders make up 4.84% of the Original Contract
| uemw Account ooum
/ -----------------
mBo Section owavnvuvn
---------------''--'-- ------�-------
Quantity uoM Unit Price Total Amount
-- ---- —----'—
uomonatruouon
--------------'
------------ ---------- --' --'-----' '---
-----'-- ---- --' --
! a000z
01000 DITCH CLEANING AND RESHAPING (WARD n)
|
4.071.00 LF 3.48 14.167.08 |
| 6000'1
}
01000 REMOVE aREPLACE CONCRETE (Dvvv/SmsWALx)
5.63 SY 213.00 1.200.00 }
�
Total
|
15'367.08 |
�
�
�
Grand Total: 15,367.08 |
Approval Approved
Due: 13-Foo-2023
Name v,Role
---�-------------
Status
Actions ' `
| 1 extemal-GC
------ --------'---' ---- ' -~- --- ------'--
Approved
— '---'-- -- ~---'
!
novomaryaowuoo
�
06-m»-2023 08`44mwCST
! ----------------
� u Project Manager
---- -- ---------- --------------
*wpmvou
--- ----' ---~-- -------' |
/
�
Colby Anderson
n6-rob-202o08:s1mmCST
| o City Engineer
oo
|
Approved
!
!
Amalia^Molly^Villarreal
o*-Fou-2oeaoa:51*wCST
i * mmmo,
Approved
.
aouoartkowlak
/
os'Feu'uouno^:o1PMCST
|
| o *dmm
Annmvau
'
|
Crystal Garza
| -----� — ----
|
uo'p*u'uozno4:ooPmCST
-- ---'-- ------'---- -----' ----- -----'--
—- ---- --' |
|
Created by: Colby Anderson onm�ec-2022 Last Modified by: Crystal Garza on 06-Feb-2023
Contract # 002.002
02-Dec-2022 03:56 PM CST
FY22 City Wide Ditching Program
801 Main Street Beaumont, Texas 77701
Project Number: PW0222-11
002.002:
Change Order No. 2
i
Grand Total: $7,509.96
For
002 FY22 Ditching Construction
Division
00000
I
Line Item
Unit price
7Ype
Group
3.0 Construction
Scope of
Headwall for 4360 Berkley. 45 SY asphalt for 4360 Berkley driveway approach. 352 LF of Ditching to reflect amount done in Ward 3.
Work
Notes
Awarded To
Texas Drainage, Inc.
Rosemary Selvidge
28345
Reason
Quantity Adjustment
Code
Days
0
Changed
Attachments
Change Order Summary
Original Contract Sum
Net Cost by Previous Approved Cos
Contract Sum Before This CO
Contract Sum Changed By This CO
New Contract Sum
All Change Orders make up 3.21%0 of the Original Contract
945,290.02 '!Substantial Completion Date
j
22,840.34 1 Net Time Change By Previous Cos
968,130.36 !Substantial Completion before This CO
7,509.96 ; Time Changed By This CO
i
975,640.32 i New Substantial Completion Date
' Accounting and Status
Accounting Status
Item Id 324
0 days
0 days
PO Number 43129e pEMAmomuer `
Accounting Project Code oTCWDp Custom Accounting Field 04
----^---_�--'----^'—-- -| --- ——'--'--- ` - '—' - '
cuwmmuc.vnunonaFiat uummpt orn xpovunit ngFiat d na �
Custom Accounting Field 07
I Custom Accounting Field 08
Line Items
�
|
| uernw Avooun Cour
Woo aroupn
Description
Quantity UoM
onupnvv
�
zu�|xmn�� '
`
3.0 Construction
wm
mmm
Headwall Structure
1z0 sx
3,000.00
3,000.06
5000-2
01000
DITCH CLEANING AND RESHAPING (WARD 3)
useuo u`
x*o
11,224.96 �
6000-2
mmm
REMOVE mREPLACE ASPHALT (oywommsmALn)
*soo oY
73.00
3,285.00
Total
7,509.96
| Grand Total: r,5oo.90
Approval Appioved
ovwo-Dec-2ozu
Name or Role
Status Actions '
1
External -GC
Approved '
nosemaryselvidge
o1gen2Vouoo:1oPwCST
u
Project Manager
Approved
Colby Anderson
o1'o*u-2ouuou:11pmCST !
»
City Engineer
Approved .
*muUo'w«v|k,Villarreal
»1'o«»-2V»un4:3opMCST .
4
oonvm,
ApprovedBart
Bartkowiak
02-ooc-202202u2pmCST
5
Admnin
Crystal G°rz" �
n000PM CST �
Contract # 002.001
19-Oct-2022 08:56 AM CST
002.001:
Change Order No. 1
For
002 FY22 Ditching Construction
Division
00000
Line Item
Unit price
Type
FY22 City Wide Ditching Program
801 Main Street Beaumont, Texas 77701
Project Number: PW0222-11
Grand Total: $22,840.34
Group 3.0 Construction
Scope of Reset the driveway at 9680 Gross Street and 395 Norvell Street. Replace 24 in RCP pipe at empty lot next to 9755 Shepherd Drive with
Work an 18 in RCP pipe. Addition 1,927 LF of Ditching for Ward 3 on Duke Street, Texas Avenue, Delaware Street, and Pine Street. Addition of
headwall replacement for Driveway 31 (4365 Berkley Avenue). Driveway 52 will not be reset, so material from that will be used on the
driveways added Into the project.
Notes Additional 1,316 LF of ditching quantity to Ward 2 to reflect actual ditching done. Ditching in Ward 2 Is finished.
Awarded To Texas Drainage, Inc.
Rosemary Selvidge
28345
Reason Owner Requested
Code
Days 0
Changed
Attachments
Change Order Summary
Original Contract Sum 945,290.02
Net Cost by Previous Approved Cos 0.00
Contract Sum Before This CO 945,290.02
Contract Sum Changed By This CO 22,840.34
New Contract Sum 968,130.36
All Change Orders make up 2.42% of the Original Contract
Accounting and Status
Accounting Status
Substantial Completion Date
Net Time Change By Previous COs 0 days
Substantial Completion before This CO
Time Changed By This CO 0 days
New Substantial Completion Date
Item Id
305 i
PO Number
423913 I FEMA Number
Accounting Project Code
STCWDP j Custom Accounting Field 04
Custom Accounting Field 05
1 Custom Accounting Field 06
i
Custom Accounting Field 07
i Custom Accounting Field 08
Line Items
Item# Account Code WBS/Section Description
3.0 Construction
464-3
01000
RC PIPE (CL III) (18 IN)
464-4
01000
RC PIPE (CL III) (24 IN)
466
01000
Headwall Structure
496-4
01000
REMOVE STR (PIPE) (RCP) (24 IN)
5000-1
01000
DITCH CLEANING AND RESHAPING (WARD 2)
5000-2
01000
DITCH CLEANING AND RESHAPING (WARD 3)
500-1
01000
MOBILIZATION
6000-2
01000
REMOVE & REPLACE ASPHALT (DWY/SIDEWALK)
Total
Approval Approved
Name or Role
Status
1
External -GC
Approved
Rosemary Selvidge
11-Oct-2022 01:44 PM CST
2
Project Manager
Approved
Colby Anderson
11-Oct-2022 02:05 PM CST
3
City Engineer
Approved
Amalla "Molly" Villarreal
19-Oct-2022 08:50 AM CST
4
Director
Approved
Bart Bartkowiak
19-Oct-2022 08:52 AM CST
5
Admin
Approved
Crystal Garza
19-Oct-2022 08:56 AM CST
Quantity UoM Unit Price Total Amount
16.00
LF
126.00
2,016.00
21.00
LF
150.00
3,150.00
1.00
EA
3,000.00
3,000.00
37.00
LF
25.00
925.00
1,316.00
LF
3.48
4,579.68
1,927.00
LF
3.48
6,705.96
0.06
LS
8,000.00
500.00
26.90
SY
73.00
1,963.70
22,840.34
Grand Total: 22,840.34
Actions
Due: 26-Oct-2022
APPROVED BY:
KennethR. Williams Date
city Manager
ATTESTED BY:
-nW A AA Uwo aA � 10 • a
Tina Broussard Date
„,_City Clerk
i s�11ftU J ®�0�
nDO&O
UUU �
J, ,, F,
Invoice # 002.007- Final
07-Feb-2023 09:08 AM CST
FY22 City Wide Ditching Program
801 Main Street Beaumont, Texas 77701
Project Number: PW0222-11
002.007: Texas Drainage, Inc. - FY22 Ditching Construction
Amount Due: $74,430.88
For Contract Contract - 002 FY22 Ditching Construction
Date
06-Feb-2023
Line Item
Unit price
Type
Group
3.0 Construction
Pay Period
01-Dec-2022 to 06-Feb-2023
Retainage
WC 5.00 - MS 0.00
Payment To
Texas Drainage, Inc.
Rosemary Selvidge
28345
Date Due
Terms
Attachments
Line Items
Work
Materials
Account
WBS/
Unit Completed
Stored
% WC
%MS
Item # Code
Section
Description
Quantity
UoM
Price
(WC)
(MS) Retainage Retainage
3.0 Construction
4122-1
01000
THERMOPLASTIC PIPE (ADS
0.00
LF
102.00
0.00
0.00
0.00
0.00
HP STORM) (12 IN)
4122-2
01000
THERMOPLASTIC PIPE (ADS
0.00
LF
98.00
0.00
0.00
0.00
0.00
HP STORM) (15 IN)
4122-3
01000
THERMOPLASTIC PIPE (ADS
0.00
LF
140.00
0.00
0.00
0.00
0.00
HP STORM) (18 IN)
4122-4
01000
THERMOPLASTIC PIPE (ADS
0.00
LF
185.00
1,888.40
0.00
0.00
0.00
HP STORM) (30 IN)
464-1 GC
01000
RC PIPE (CL 111) (12 IN)
0.00
LF
107.00
0.00
0.00
0.00
0.00
Contract
464-2
01000
RC PIPE (CL 111) (15 IN)
0.00
LF
111.00
0.00
0.00
0.00
0.00
464-3
01000
RC PIPE (CL 111) (18 IN)
0.00
LF
126.00
0.00
0.00
0.00
0.00
464-4
W000
RC PIPE (CL 111) (24 IN)
0.00
LF
150.00
0.00
0.00
0.00
0.00
Work
Materials
Account WBS/
Unit Completed
Stored
% WC
% MS
Item #
Code Section
Description
Quantity
UoM
Price
(WC)
(MS) Retainage Retainage
496-1
01000
REMOVE STR (PIPE) (RCP) (12
0.00
LF
25.00
0.00
0.00
0.00
0.00
IN)
496-10
01000
REMOVE STR (PIPE) (STEEL)
0.00
LF
28.00
448.00
0.00
0.00
0.00
(30 IN)
496-2
01000
REMOVE STR (PIPE) (RCP) (15
0.00
LF
25.00
0.00
0.00
0.00
0.00
IN)
496-3
01000
REMOVE STR (PIPE) (RCP) (18
0.00
LF
25.00
0.00
0.00
0.00
0.00
IN)
496-4
01000
REMOVE STR (PIPE) (RCP) (24
0.00
LF
25.00
0.00
0.00
0.00
0.00
IN)
496-5
01000
REMOVE STR (PIPE) (CPP) (12
0.00
LF
25.00
0.00
0.00
0.00
0.00
IN)
496-6
01000
REMOVE STR (PIPE) (CPP) (15
0.00
LF
25.00
0.00
0.00
0.00
0.00
IN)
496-7
01000
REMOVE STR (PIPE) (CPP) (18
0.00
LF
25.00
0.00
0.00
0.00
0.00
IN)
496-8
01000
REMOVE STR (PIPE) (PVC) (8
0.00
LF
12.00
0.00
0.00
0.00
0.00
IN)
496-9
01000
REMOVE STR (PIPE) (STEEL)
0.00
LF
25.00
0.00
0.00
0.00
0.00
(15 IN)
5000-1
01000
DITCH CLEANING AND
0.00
LF
3.48
0.00
0.00
0.00
0.00
RESHAPING (WARD 2)
5000-2
01000
DITCH CLEANING AND
0.00
LF
3.48
0.00
0.00
0.00
0.00
RESHAPING (WARD 3)
500-1
01000
MOBILIZATION
0.00
LS
8,000.00
800.00
0.00
0.00
0.00
6000-1
01000
REMOVE & REPLACE
0.00
SY
213.00
0.00
0.00
0.00
0.00
CONCRETE (DWY/SIDEWALK)
6000-2
01000
REMOVE & REPLACE
0.00
SY
73.00
2,044.00
0.00
0.00
0.00
ASPHALT (DWY/SIDEWALK)
6000-3
01000
REMOVE & REPLACE GRAVEL
0.00
SY
560.00
0.00
0.00
0.00
0.00
(DWY/SIDEWALK)
6000-4
01000
REMOVE & REPLACE SOD
0.00
SY
23.00
0.00
0.00
0.00
0.00
(DWY/SIDEWALK)
Total
5,180.40
0.00
_ _
Change Order No. 1 - 3.0 Construction
464-3 01000 RC PIPE (CL III) (18 IN)
0.00 LF 126.00 0.00
0.00 0.00 0.00
464-4 01000 RC PIPE (CL III) (24 IN)
0.00 LF 150.00 0.00
0.00 0.00 0.00
466 01000 Headwall Structure
0.00 EA 3,000.00 0.00
0.00 0.00 0.00
Account WBS/
Item #
Code Section
Description
496-4
01000
REMOVE STR (PIPE) (RCP) (24
IN)
5000A
01000
DITCH CLEANING AND
RESHAPING (WARD 2)
5000-2
01000
DITCH CLEANING AND
RESHAPING (WARD 3)
500-1
01000
MOBILIZATION
6000-2
01000
REMOVE & REPLACE
ASPHALT (DWY/SIDEWALK)
Work
Materials
Unit Completed
Stored
% WC
% MS
Quantity
UoM
Price
(WC)
(MS) Retainage Retainage
0.00
LF
25.00
0.00
0.00
0.00
0.00
0.00
LF
3.48
0.00
0.00
0.00
0.00
0.00
LF
3.48
0.00
0.00
0.00
0.00
0.00
LS
8,000.00
20.00
0.00
0.00
0.00
0.00
SY
73.00
0.00
0.00
0.00
0.00
Total
20.00
0.00
Change Order No. 2 - 3.0 Construction
466 01000 Headwall Structure
0.00 EA 3,000.00 3,000.00
0.00 0.00 0.00
5000-2 01000 DITCH CLEANING AND
0.00 LF 3.48 0.00
0.00 0.00 0.00
RESHAPING (WARD 3)
6000-2 01000 REMOVE & REPLACE
0.00 SY 73.00 3,285.00
0.00 0.00 0.00
ASPHALT (DWY/SIDEWALK)
Total 6,285.00 0.00
Change Order No. 3 - Final - 3.0 Construction
5000-2 01000 DITCH CLEANING AND 0.00 LF 3.48 14,167.08 0.00 0.00 0.00
RESHAPING (WARD 3)
6000-1 01000 REMOVE & REPLACE 0.00 SY 213.00 1,200.00 0.00 0.00 0.00
CONCRETE (DWY/SIDEWALK)
Total
Summary
15,367.08 0.00
Grand Total: $26,852.48
1.
CONTRACT SUM +AMENDMENTS
945,290.02
2.
NET CHANGE BY Change Order
45,717.38
3.
CONTRACT SUM TO DATE (Line 1+ Line 2)
991,007.40
4.
TOTAL COMPLETED & STORED TO DATE
991,007.40
5.
RETAINAGE
5a.
5.00% Of Completed Work (Column I on Continuation Sheet)
0.00
_
5b.
_ ---- - _.-_.-
0.00% Of Stored Material (Column J on Continuation Sheet)
0.00
TOTAL RETAINAGE (5a + 5b)
0.00
6.
TOTAL EARNED LESS TOTAL RETAINAGE
991,007.40
7.
LESS PREVIOUS CERTIFICATES FOR PAYMENT
916,576.52
8.
CURRENT AMOUNT DUE
$74,430.88
9. BALANCE TO FINISH, INCLUDING RETAINAGE (Line 3 less Line 6) 0.00
TOTAL 45,717.38 0.00
Accounting and Payment Status
Invoice Id
534
Payment Status
Check #s
Paid Date
Paid Amount $0.00
PO Number
431292 FEMA Number
Accounting Project Code
STCWDP Custom Accounting Field 04
Custom Accounting Field 05
I Custom Accounting Field 06
............. .
Custom Accounting Field 07
Custom Accounting Field 08
Approval Approved
.. .. .. ...... . - .
Due: 14-Feb-2023
Name or Role
Status Actions
I Extemal-GC
Approved
Rosemary Selvidge
06-Feb-2023 04:17 PM CST
2 Project Manager
Approved
Colby Anderson
06-Feb-2023 04:20 PM CST
3 City Engineer
Approved
Arnalla "Molly" Villarreal
06-Feb-2023 05:08 PM CST
4 Director
...... ......... ....
Approved
Bart Bartkowiak
06-Feb-2023 05:17 PM CST
- -------
------------- -- --------- --
5 Admin
Approved
Crystal Garza
.... ... .. .
07-Feb-2023 09:09 AM CST
Created by: Colby Anderson on 06-Feb-2023 Last Modified by: Crystal Garza on 07-Feb-2023
Contract - 002.003
28-Mar-2023 03:30 PM CST
002.003: Change Order No. 3 - Final
FY22 City Wide Ditching Program
801 Main Street Beaumont, Texas 77701
Project Number: PW0222-11
Grand Total: $15,367.08
For 002 FY22 Ditching Construction
Division 00000
Line Item Unit price
Type
Group 3.0 Construction
Scope of Additional 4,071 LF of ditching in Ward 3 and additional 5.63 SY of remove and replace concrete to to reflect the actual amount of work
Work completed.
Notes Accepted by City Council on February 14, 2023 by Resolution No. 23-054.
Awarded To Texas Drainage, Inc.
Rosemary Selvidge
28345
Reason Quantity Adjustment
Code
Days 0
Changed
Attachments
RES 23-054.pdf
Change Order Summary
Original Contract Sum
Net Cost by Previous Approved COs
Contract Sum Before This CO
Contract Sum Changed By This CO
New Contract Sum
All Change Orders make up 4.84% of the Original Contract
Accounting and Status
Accounting Status
Item Id
945,290.02 Substantial Completion Date
30,350.30 Net Time Change By Previous COs
975,640.32 Substantial Completion before This CO
15,367.08 Time Changed By This CO
991,007.40 New Substantial Completion Date
330
0 days
0 days
PO Number
Accounting Project Code
Custom Accounting Field 05
Custom Accounting Field 07
Line Items
431292 FEMA Number
STCWDP Custom Accounting Field 04
Custom Accounting Field 06
Custom Accounting Field 08
Item # Account Code WBS/ Section Description
3.0 Construction
5000-2 01000 DITCH CLEANING AND RESHAPING (WARD 3)
6000-1 01000 REMOVE & REPLACE CONCRETE (DWY/SIDEWALK)
Total
Approval Approved
Name or Role
Status
1 External -GC
Approved
Rosemary Selvidge
16-Feb-2023 09:18 AM CST
2 Project Manager
Approved
Colby Anderson
16-Feb-2023 09:32 AM CST
3 City Engineer
Approved
Amalia "Molly" Villarreal
21-Feb-2023 01:09 PM CST
4 Director
Approved
Bart Bartkowiak
22-Feb-2023 09:21 AM CST
5 Admin
Approved
Crystal Garza
22-Feb-2023 09:32 AM CST
6 June Ellis
Approved
City of Beaumont
June Ellis
22-Mar-2023 04:41 PM CST
7 City Clerk
Approved
Tina Broussard
23-Mar-2023 09:45 AM CST
Created by: Colby Anderson on 07-Dec-2022 Last Modified by: Tina Broussard on 23-Mar-2023
Quantity UoM Unit Price Total Amount
4,071.00 LF 3.48 14,167.08
5.63 SY 213.00 15200.00
15,367.08
Grand Total: 15,367.08
Due: 30-Mar-2023
Actions