RESOLUTION NO. 23-046
BE IT RESOLVED BY THE CITY COUNCIL
OF THE CITY OF BEAUMONT:
WHEREAS, at 2145 Chevy Chase and 6365 Daisy Street, a sinkhole formed on: .
the storm sewer line in the back yards at each of these addresses; and,
WHEREAS, these concrete storm- sewer lines each connect the City's road
drainage to a Jefferson County Drainage District No. 6 (DD6) ditch by running along the
side of residential homes; and,
i
WHEREAS, the City's line become DD6's line, the pipe material transitions from
concrete to corrugated metal, a video inspection of the lines revealed that the sinkholes
in the back yards were causes by the failure of the transition of the concrete pipe to the
corrugated metal pipe; and,
WHEREAS, further inspection of the concrete pipe revealed that the entirety of
the concrete storm sewer lines are in need of repair; and,
WHEREAS, DD6 has replaced their, corrugated metal pipe and repaired the
sinkhole as well as the surrounding embankment, now the City will contract to repair the
concrete line utilizing a trenchless relining process.
NOW, THEREFORE, BE IT RESOLVED BY.THE
i
CITY COUNCIL OF THE CITY OF.BEAUMONT:
THAT the statements and findings set out in the preamble to this resolution are
hereby, in all things, approved and adopted; and,
THAT the City Manager be and he is hereby authorized to execute a contract
with PM Construction & Rehab, LLC, of Pasadena, Texas for the rehabilitation of the
storm sewer lines in the amount of $102,840.00, and a total of one (1) week will be
allocated for the completion of this repair project.
The meeting at which this resolution was approved was in all things conducted in
strict compliance with the Texas Open Meetings Act, Texas Government Code, Chapter
551.
PASSED BY THE CITY COUNCIL of the City of Beaumont this the 31st day of
January, 2023.
- Mayor Robin Mouton -
.p
i gooC
A PURIS COMPANY
January 23, 2023
City of Beaumont, Texas
Public Works -Engineering
Attn: Evangeline Burkart, EIT
801 Main Street -
Beaumont, Texas 77701
Bid Proposal: City of Houston Main Street Sewer Rehab
Houston, Texas
Cured -In -Place Rehabilitation
Dear Evangeline,
PM Construction & Rehab, LLC
131 N-Richey St
Pasadena; TX 77506
H GAC #TP07-18
PM Construction & Rehab, LLC (PMC) is pleased to offer the following proposal pricing to provide
cured in place rehabilitation services of the 24 & 30-Inch storm sewer lines for the.above referenced
project. Our_proposal is based on the documents provided by your office via email, dated October
20, 2022. This pricing includes providing all labor, material, supervision, and equipment necessary
to complete the scope of work as listed below.
Scope of work performed by PM Construction& Rehab, LLC:'
1. Provide pre -work submittals.
2. PMC will perform pre -rehab CCTV &cleaning (normal only). Two -wheel drive vehicle access
to.manholes.is required for this work.
3. CIPP rehabilitation to be completed per ASTM 1216 standards utilizing air inversion & steam
. curing methods.
4. Reinstatement of service laterals is via internal robotic cutter only (if required).
5. PMC will perform post lining CCTV inspection upon completion of our CIPP to confirm rehab
work.
6. CIP.P rehabilitation pricing is based on completing diameters & associated quantities as, listed
in this proposal's schedule of values. Any. change in overall or segmental length, diameters,
liner thickness, or splitting of scope could result in pricing changes.
7.. Demobilize all construction equipment and clean-up of all identifiable debris generated by.
PMC crew(s).
8. _Proposal includes costs for one mobilization. Additional mobilizations could result in
additional charges.
Exhibit "A"
PM Construction & Rehab, LLC proposes to complete the above scope of services for the
prices listed below:
Item No.
Description
Qty
Unit
Unit Price
Total
P15
Travel and Mobilization-TML Region
16 (Golden Pine & Oil -Beaumont)
1
LS
$ 10,000.00
$ 10,000.00
P25
Travel and Mobilization -Rehab of 301
ft to 500 ft
1
EA
$ 15,000.00
$ 15,000.00
P25-Alt
Discount
1
EA
$...(13,170.72)
$ (13,170.72)
A32
24" Clean and Tv strom sewer
296
LF
$ 19.32
$ 5,718.72
A34
30" Clean and Tv strom sewer
180
LF
$ 27.60
. $ 4,968.00
A53.
21"-36" Post TV Inspection After
rehab
4.76
LF
$ 9.00
$ 4,284.00
C8
24" x 10.5mm CIPP
296
LF
$ 140.00
$ 41,440.00
C10
30" x 12.Omm CIPP
180
LF
$ 185.00
$ 33,300.06
C29-Alt
Internal reconnects on CIPP Man
Entry
2
EA
$ 650.00
$ 1,300.00
$ 102,840.00
This pricing does not include the cost for the following:
1. Furnishing Bid, Performance, or Payment Bonds.
2. Prevailing wages (none provided).
3. Heavy pipe cleaning, including but not limited to grease, roots, tuberculation removal;
mechanical cleaning, debris disposal, dump site, etc.
4. The Owner is responsible for providing adequate'upstream & downstream access to
proposed lines, including but not limited to precast removal/replacement, access/easement
clearing, roads, staging, & inversion areas, etc. (should it be required).. PMC and/or its
subcontractors must be able to set up over each manhole.
5. Erosion or site control including plans, permits, implementation, inspection, etc.
6. Reinstatement of service laterals (other than by internal means only) or lateral rehabilitation
or service reconnections of any kind; including but not limited to pipe bursting or open cut
replacement. Dewatering, grouting, monitoring, point repairs (internal or open cut), new
installation, structure modification, etc. to be handled by Others if required.
7.. PMC anticipates completing this storm CIPP work in dry weather conditions only. Therefore,
we have not included the costs to perform bypass for this project, should that be required;
PMC.will need to price separately.
8. Traffic control outside of temporary signs& cones.
9. Testing of any kind.
10. Site restoration of any kind including but not limited to grading, grassing, concrete, or
asphalt work.
11. Any permits or fees, including fees for water source for pipe cleaning or CIPP. Source and
any associated fees to be provided by Others.
12._ Changes in pipe diameter, quantities, liner thickness, or lengths (overall or segmental) could
result in pricing changes. Pricing is based on completing all listed quantities in one
mobilization.
13. Costs for site specific training/badging (safety, security, or otherwise).
14. Any work not specifically detailed in this proposal.
1.5. Final payment will be based upon actual installed quantities.
16. Pricing firm for 30 days from the date of this proposal. This proposal shall become an
exhibit or.attachment to any contractual agreement. After expiration, this proposal is
deemed invalid or subject to adjustment and reissued accordingly.
17. Proposal pricing based on net 45-day net payment terms from the date of invoice.
Thank you for the opportunity to offer you this proposal. Should you have any questions or require
additional information,, please do nothesitate to contact me.
-Sincerely,
PM Construction & Rehab, LLC
Justin Mouton
Business Development
Cc: Alam Quintero, Bid File