HomeMy WebLinkAboutRES 23-022RESOLUTION NO. 23-022 BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF BEAUMONT: WHEREAS, on March 9, 2021, the City Council of the City of Beaumont, Texas passed Resolution No. 21-055 awarding a contract in the amount of $1,320,000.00 to Brystar Contracting, Inc., of Beaumont, Texas, for the Lift Station & WWTP Repairs Tropical Storm Harvey Group 4 Lift Stations Project; and, WHEREAS, Change Order Nos. 1-6, in the amount of $53,970.70, are attached for your review; and, WHEREAS, Change Order No. 7, in the amount of, ($50,000.000) is required to adjust the estimated quantities in the contract to reflect the actual quantities used in completion of the project; and, WHEREAS, the project has been inspected by the Water Utilities Division and found to be complete in accordance with the provisions and terms set forth in the contract; and, NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF BEAUMONT: THAT the statements and findings set out in the preamble to this resolution are hereby, in all things, approved and adopted; and, THAT the City Manager be and he is hereby authorized to execute Change Order No. 7, in the amount of ($50,000.00), for additional work described above, thereby increasing the total contract amount to $1,323,970.00 for the Lift Station & WWTP Repairs Tropical Storm Harvey Group 4 Lift Stations Project; and, BE IT FURTHER RESOLVED THAT the City Manager is hereby authorized to make final payment in the amount of $66,198.54 to Brystar Contracting, Inc., of Beaumont, Texas. The meeting at which this resolution was approved was in all things conducted in strict compliance with the Texas Open Meetings Act, Texas Government Code, Chapter 551. PASSED BY THE CITY COUNCIL of the City of Beaumont this the 24th day of January, 2023. - Mayor Robin Mouton - APPROVAL OF CONTRACT CHANGE CHANGE ORDER No. Six (6) DATE: `Sep CMIIBr:i%2022 PROJECT: City of RoaOmont, Texas Lift Station & wMP Repalrs Tiop)cal storm Harvey Group h.lift,Stations 01d No. WUDS21-10 OWNER: r City of Reaumontjexas t 801 Malh Street 0 caumont, Texas 77704 CONTRACTOR: orystal.Ontracting+ Inc, 0385 Chemical Road iledumont, Texas 71705 TO THE OWNER: Approval of the fallowing contract change Is requested. REASON FOR CHANGE: ro Install a Customet-owned100A disconnect s►+:ltch betweeh the MTS and Entergy meter; pRd,to relocate the sorv)ce panel to ap afavatlon of 36" stiove the existing grade at the Pine Haven and Forest Glen Ilft statlah. ORI6IN,ALCONTRACTAMOUNi: $ 1.320.000.00 REVISED CONTIiACi AMOU.tVfi PJ R CHANGE ORDER No, S $ 1,364,784.70 THIS CHANGE ORDER 7 Forest Glen LI(t Statloq.(FEMA Pro)ect-019g94). Install a Customerotwed 400A disconnect switch >; 4,593,00 between the MTS and Entergy, meter, and to relocate the service panel to an elevation of 36" above the existlneBrada, PiDp $4,593.00/lS la Pine HaVen Litt Statlon (FEMA Projact II13502). Install a Cus(amer-owned 3011A dfsconnectswltch $ 4,593.00 batwean the MTS and Entergy meter, and to relocate theservice panel to an elevatign of 36" above the 94stinggiade, ADp $4,593.00%IS TOTALAMOUNTOFTHISCHANGE ORDER: $ 0,185.00 TOTALIREVISEDCONTRACTAMCILINTINCLUDINGUISCHANGE ORDER. S 1,373:9ti0 0 PERCENT OFTHIS CHANCE QRDER 017096 "f01 AL PERCENT CHANGE ORDER TO DATE 4,6$ ' CONTlIA77IME D�fglnhlCoo}'rattThnel. 210 calenddrday3 geylsed_CantractftriteperpraVlousChenge.Qrdefi 507 caleddardays Additlorialtimerequltedthis' hbhgeONO: O:colenderdays RAvlsodCdntiactTlmopoibb!Change Order Sul talen¢ari(ays CONDITION OF CHAMP "Coilt(actar acknd- Viedges and agrees that the adjustments in contract price and contracttinte stipulated in this Chah& 6rder iepresahts'110 camperlsatlon fer up increases and decreases In the cost of, and the time tequired t0 perratin.the entire wo, under.the Contract arising directly orindirectly from this Chhngo Order end,allprovious Change Orders; Atceptance of this waiver constitutes an agWement 6btwded owner and cogtractor diet the Change order repraserits on all Inclusive, mutually agreed upon tment-to'the Contract, and that CoqEpactorw111walvaallrightstofileAitOrn' nthlsehangaoraeretianftlspropnilyexecdted" AccRovlewgd.by- RnVlet' ,y: 0 starCogtrdcting;lnc•' Amalla31111aireal;P.E, rt._ttkaWlik Contractor City Englnedr Dltoctorof PublicW c� and Tecimolojry" Seen [fate: - . 04 �ippioy d,b : e ted by: Exhibit "A" APPROVAL OF CONTRACT CHANGE CHANGE ORDER No, Five (5) DATE; tune 14, 2022 PRO)ECfI City of Daaumont, Texas Lift Station 8s WWTP Repairs Tropical Storm Harvey Group 4I tSiatlons Old No, WU0121-20 ; OWNERI City of OoaUmont, Texas 801 Main Street Deaumont, Texas 77704 CONTRACfOOI Orystar Contractipg, Inc, 0385 Chamlcal (load Beaumont, Texas 77705 TO THE OWNEIII Approval of the following contract change is requested, REASON FORCHANGEI To supplement the eeisltng eloctrcal polo with an additional post and Unistrut supports to Install tho electrical equipment at the Pine Haven and Forest Glen Lift Stailons i ORIGINAL CONTRACTAMOUNT; REVISED CONTRACFAMOUNT PER CHANGEQRDER No.4 THIS CHANGE ORDER 7 ;Forest Glen Lift Station (FEMA Project 013484). Provide aditlonal support for Installation of tho'olectrical .equipment, including a ga1V_anlzod 4" dia, post, a concrete footing and Unlstruts, ADD $4,017.35/LS 13 Thie Haven Lift Station (FEMA Project 1113502). Provide additional support for Installation of thI ;electrical equipment, Including o galvanized 4" dle, post, a concrete footing and Unlitruts, ADP ?$4,g17,3$/LS TOTAL AMOUNT OF THIS CHANGE ORDERI TOTAL R.EVISED,CONTRACTAMOUNT INCLUDING THIS CHANGE ORDERI PERCENT OF THIS CHANGE ORDER TOTALt'E 1TI OADERTO DATE . .. 64t:HANti I CONTRA97IME Original ContrktTlme: Revised Contract time pad previous Chapge Orders Addillonai 7ilne required this Change ardor. ROVlied Centr04TIrhR por this Chen Bo Ordar CONDITION OO,GHANG111 "contI.ractor srcknoviledges crtd agrees that the adjustments In contract price and contract time ;am pensitloa fsir a)i"lncraesos and docransail n the cost of, and the time rerjulretl to pgrfol diroctlyor Indirectly'from this Change order and.all preVlous Chento orders. Acceptance oh Owner and contractor that the Chance Order roprosonis an ellanclusive, mutually ogreed Contractor will aIva all riglits to file a claim an this Change order efterit Is propetiy oxecuted," Ac adh' ReyloW``edby`\ soviet 0 iYT a trectln Ipc Amalie Vlllnrroal; P,E, Bart O Contract city Engineer Direct 1 - aandT( R am e' $y: Approvedbyl A(t s4 Schpoinbur } Polk, Inc, Wris O.00ne TI , Enainear //� }� Interim City n.6 Mz / �B%�qG- (� solo, !✓YJ�iy7F //� / �U'V'�iMi. LU upon S 1,320.000,00 ,$ 1,355,150.00 t $ 4,817.35 $ 4,817.35 ' $ 9,634,70 S 2,364,784.70 0.73% 8,99% 210 colendat:days 4R caliinda!"'J Y5 i AS.colandardoys I 50Teuigittlarilayp tes an I to the" i PROIECTI OWNER: APPROVAL Of CONTRACT CHANGE City of Beaumont, Texas UftStation A WWTP Repairs Tropical storm Harvey Group 9 IIR Stations Old No, WU0121-10 City of Beaumont, Texas 801 Main Street Beaumont, Texas 77704 CHANGE ORDER No. Four (9) ' DATE: May 16, 2022 _ i • i CONTRACTOR: Brystar Contracting, inc. 838SCliamleal Road ' Beaumont, Texas 77705 TO THE OWNEftt Approval of the rollowing contract change Is requested. REASON FOR CHANG01 To Increase the contractilme to provide far consiruction of the Walker Rood LIR Slatlo�following the Clty obtaining an easement from the property owner. ORIGINAL CONTRACT AMOUNT: REVISED CONTRACT AMOUNT PER CHANGE ORDER No, 8 THIS CHANGE ORDER TOTAL AMOUNT OF THIS.CHANGE ORDERI TOTAL REVISED CONTI!ACTAMOUNT INCLUDINGTHIS CHANGE ORDER: PERCENT OFTHIS.CHANGE ORDER TOTAL.06004CHA06E ORDERTO DATE CONTRA,CTTIME Original ContractTimel Revised Conlrect time •per•provious Change Orders Addll.0 al Tlme required this Chapae Order: Revised conir$ct Time per this Chango order -CONDITION OF, CHAN99i "contractor acknowletiees eno aprges that the adJustmants in contract pflca and contract time stipulated compeniatlon,for ill Iwreases and decreases In the cost of, and the*tlroe required to perform the enil tlltect(y or.IhdljecllY from this Change order and all.preylous,Chinec Orders. Acceptance of•this Wainer Owner and Contractor that;the CljanBo.ordor represcrits on all Inclusive, mutually'agreed upon poll Contractor wIli w- ve all lights to file a cialm an this Change Orderafter it property exetuted.9 cce ed h Revlewod hyi Re w Bryst rCuntr' `In$, Iltc AmehaVRlarreaGV\P.E. O. rt, artkowlali Contractor , City Engineer Olrectoraf.Pu61Ii andTechriologyi7 Dotal .. ntt!L 71n6'B foussard ' CILyClerjc- , , � I.o2o.000.ao i I , 3 I,g55.150,0a D.tin>6 ' 4,6616 I 210 calendardeys j 417, celondardiiys I .A9.caleridardaVs 452 cale'iidardays """o OrOer,represents full and the Centraia irisg in tis an oareeriegtbatwean to the Contract, erid.thaf EPA a APPlJOVAL Ol"WATRACT CHANOE CHANg ORDER Wo.lfliraq (8) DATU". Lift Stallifi k1h WTPJlgphlri TroplcalStorm Harvey 6rdup4llhSiollons Did fib. WUDAI-ib OWNERI i CIW PIPPYAQ111, TRNPJ ONTWTOH? D(yslAt:Cp)J4A4I1DgF Inc. 0 0 amigpi) .�ipj W705 Approval of ilia foII4V?1n&0nt(ac1 clighlo is requested, REASON FOJ0q 1A rel 0'a 6 t a the s,16 d-lij ge 11 ii T410 r. rd@qp.l i 6W16 a 19 it yb 6yi evil 4 PA Vai Hotlday, Major D&P; MOT ORIAI L TMCTAM90TI '(HfSCRAff;3t DO PA. . . 2 H!l stQ1100. RRIA"Old 1hp 4186(1-jby gq6artitor. rg;qploA(pJp, a location *#oVe H(QUO $ 14.41. 0 0, s E;4 10, I 6 QrCIUR011ft stalipp, to avotbizoo ADD. ; above. ropad 0,00"06/IS 8 9 10 U 12 .15 10 410 up 41 T" M VAQ1 Rod. pitAt-41uh.. liatoplia fpc 00 ip 1!0� CONPITION bF GHANPRI "contractor ocltttawladlgas and oprgas that Ilia p4justmants in pilltact price Pttd conlroot time altp paled In ails Change order mprosums.tuil coptltapsaliop for nil inctouses and decransas In Ilia costpfr and Ilia time required to,perform tha;antlro'wafk wider Old eontfait arlsina dlroelly or Inill{ocilyYroln Ihls ehahha order and oil pfiVjoos ettuht4eXkdors, AcceplOoto ql this V olvef -constitule pjt ograenloitt halWcon •oyinor anti co dmdtar that the chow order represents on all hiciusivo, Inutunlly brood it adjustment the cautrnct, `nd •flint, contractor wlll,Valiiaoil rights to file a clalmon thischsnge older after It Is property execoldV A :plat! hm i{evlatyadby; Re41 .uy grystnrcontrapttnq,h a llmplln afteel, PGg rt .alltiot4lok contractor city Eaagteer nUactdr00,0llaytrnrks andlTecUtwlag salveiices oalot ��'7 /.Z Patot� C�.,.'� - potoi " �✓3 "�'� R op s (tct Approved by, tettby: SchoumIA,Im , o lr, Id6. : Kylo Naygs Tina PrOUSSQtd Epaltlaer city Monger Cltytierk eclat ` v`d Polm S " 2� psdat �CSt OC- ' �,00as`SS�agps�q� 0 APPROVAL OF CONTRACT CHANGE I� CHANGE ORDER No,1v/oJ1 DATE; PROJECT: i City of eeaumoot,Texas DecumbarD,20,21 t'( Lift Station&WWTPRcpaifs 1 { I ,r Tropical StarmHarvey � Group 411lt Stations '� Old No; WUD121-10 ;�• OWNER; Oval`,Deaomont,Texas OOL Maln Street oeaumant,Tonas 77704 CONTRACTORI DrystarContracting, Inc, j l i 0305 Chemical Raid l MlM Daaumont, TeX05 77105 TO THE OINNERI I , i Approval of the following contract Is raquostod, �i 9cisanlle REASON FR eHANGEITd remove and replace the control panels and all electrical appurtenances on the existing service pole at the Pine Havon .j oild Forest lion Ilit stollons, Including dciat:ni tho lnsloliation of llie proposed elevated pfelrorm and foundatiod guard fanco oqd 18"• die, HDP�; tirivew P)po, ; I TRACTAIyID ORIGIN(tL ONUNI Tr Y 1,3TO,OOp.O�. REVISED C NTRACTAMOUNTPARCHANGEORDERNo.1 S 1.922,337:OI0+ THIS CHANGE ORDER i !l Ift Desc(intlbn l 7 Forest 6 ondfeunhation n Lift Station (FEMA Project 013484). Delete the Installation of the proposed elovated jilatforM g:iardfencea d18"dl HD Ed 1• d d $ J782AD) ,. . n a F r vet— pipe, on provi .o ferrurn:shIDS Dnd Installing kilo , •, newslto ¢leclrtcol lrhpra'vemdnts on rho oidsling servfca pore, oEDUCT $702,00JLS ti 18 i Finetiavbn,llltstationlFEMAPro)ectll135Q2),Delglelhelnstollaliono(thepruposedolevatedpigtrorrit and rounoatlon, guard fanceii:d 18"dla HDPEdriveweypipe, ond•provldg forfurnlsh:ngond installing the i new site electrical improvements on the existing se!vlck paIo:,DEDU1Ct$6%06!LS TOTALAMjQUNTOFTHitbHANOEORDERI $ (119710A TOTALBEV�#DCQNTRACrAMOUNT INC 11 GTHISCHANGEOttDEnr ¢ 3,9T0,9ADAo(' tONTHI(•CTiTIME. oitef ial cohirectTtmar l 210`,eotendef days Addltlondl antraciifineFier PievlousChange0rders: '•Ocblandarddys AddlI1461 �6hifactTlme!erthI ChpngaOf ars: Time spspe�:ded froth Mo� 9, Z02 to August 1;111Ti Qls talendordays Additional ImeduedalaylnplalfuinidoWiv '27t01endarda s i ;.. l y, Addlllopal. jpetoeompletawOliutPingHaiinandForestGlan ' BDeataAslgrdoys AORM.at 77Ilnia required, ills Chonge,orddrr ' 177 calandn'eddVs ft..vlddtoltroctTl o 6:thisC►taripeordcr s .. m P. 9p7 calends dsy ' CONDITION OFCHANGEt.' "Eontrpctof ackOowladeQ} and agrees that the adjustments In contractprlce and contract time;lipglated In �f)Is Charge order ropresW , compensallon for ell Incrcose4 and deereasos In th'e toff of, and the Ilma roquired.ty pjkfirm the antife Sy4:k under kilo Coht)aet adsing dirt Jar Indl(ectlly from this i hngd order and all pre4lous change.Ordars Acceptogce of thjs tvalvhr constitutes. ep agreettleiit bot}voen Owntir Controefor da! the Chan o order repre3lnls art ulllndullsre; mutually, greed eAPn_pdjustrnpnE;to the lra�t, end th ntraptori ill1#11 tishlstoill nc�d bnitil�"ChanBaiirderpfteritJspropeilyeitacu1, rodb t Ravlowerlby: nn govl by- 46, 0' ftdrC ptractI i 4 Ame1la,Vlllorraol, P,E, a 6rtkoWlak ; ConiracIOrI1 ` CItyEg6lneer` Plraet4refPulflcWd}Ns - ® ' 11 ��nr��'��� �� ondTgchh'olo' 7Saiylces f ' �'1 i D81a:.: :;146 Oal•:I�I''i�c�.ar.�l_ Orin• Zr. '® i! -.Q�� at 'en AQprovadby — Alt`s dhy.1 ®' sehaumbur�� ,Ipc, KyleHayas 7 f ussar , Edglnear 2 j CIOWnoger City, clerk Data: l `( NO: , !z- 2y— 6.1 Drio: ' V• • O'411., t% I �%q i i APPpOVALQFCONTRACT CHANGE CHANGE ORDER No. .O e 1 DATE, .Octolar7,2021 PROJECT', City of Deaumont, Texas LJO Statlo►t A WWTP Rapairs -TropI0I.storrn Harvey Gropp 4lilt Ststions Did, No, MIU0121-10 OWJyERs Clty of Beaumont, Texas 801 Main Street i Beaumoill, Texas 777oq CONTiAC(Opt grystar.Contracling, Inc. .8385 Cwtilcal Road Beaumont, TOas 77705 TOTHE OtNNI?R: Approval of the fallowing contract change Is requested, Reason forChanga: To deleig four 101 dis. X Oft.RC footings and Install a 91044" spread fooling for the Ffre Traidigg Grounds lift station I platform ORIGINAL CONTRACT AMOIiNT, 1.320.000.00 THIS CHANGE ORDER jcQm Oescriptionj 8 Fire 7rabiind Gounds CS. Delete four 10' dig, X Oft RC fo4tigs and Install a 91x7'x14" .spread footing. ADD $ 2,937.00 $2,337.00/Lump Sulu TOTAL AMOUNT OF THIS c4m NOEORDERI $ 2,337.00 TOTAL gEVISEOcONTitACTI�MOUNTINCLUDINGTHIS CHANGEORDElt: $ 4.322;337.00 CONTRACTTIME Original Contract Time, 210 calendar days AddltlonWinia required this Change order 0 Calendar days Revised CoatraetTlmo per llils Change Order zio eatend4rdeys CONDITION OP CHANGE, "Contractor acknowledge compensation forell Ilicri or (ndlroctly from Aid? Ch: contractor that the Chani PH rights 6 file a ilalm on 1 agrees that the adjustments in contract price and.coniract Alma stipulated in. this Change order represents full and.decreases In the costoi, and the time required to perform the entlre.work uadar tin cotiCtact silting dirac► y Order and phi provlaus Change Orders, Accaple-pee of ibisvtsiver constitutes an aJ!(conignt between Owner and der represents an all'Inclusiva, mutualivenreed upon adjustment to the Contract, andihat Contractor will waWo la„ge Order a fterit is properly executed." Hevie%vad bby- \\ - C��'�1l.A�D�A D e Ama11a Ulllareal; P.E. City Insitccr Dote: I DhW)'Q f Apjircivad b►i. C' .Kyle Hayti; • City maoagar j CITY OF BEAUMONT LIFT STATION & WWTP REPAIRS TROPICAL STORM HARVEY GROUP 4 LIFT STATIONS WU0121-010 PROGRESS PAYMENT No. 12 - Retains a PROGRESS DATE November 30, 2022 CONTRACT TIME BEGAN: , May.3 2021,,; ORIGINAL CONTRACT AMOUNT $ 1;320;000:00 CALENDAR DAYS ALLOWED:, 5 a:S ' CONTRACT AMOUNT INCLUDING CHANGE ORDERS $ 1,323,970.70 CALENDAR DAYS USED: 458 TOTAL AMOUNT OF WORK PERFORMED TO DATE $ 1,323,970.70 CALENDAR DAYS OVER: ChannP r)rrirar iRr immnry Approved Change Orders Number Additions Deductions 1 $ 2,337.00 2 $ 1,377.00 3 $ 34,190.00 4 $ 5 .$.-. ... 9,634.70 6 $ 9,186.00 7 1 $ 50,000.00 TOTALS $ 55,347.70 1 $ 51,377.00 $ 3,970.70 NET CHANGE BY CHANGE ORDERS Contractor's Certification The undersigned Contractor certifies that to the best of its knowledge: (1) all previous progress payments received from Owner on account of Work done under the Contract have been applied on account to discharge Contractor's legitimate obligations incurred in connection with Work covered by prior Progress Payments; (2) title of all Work, materials and equipment incorporated in said Work or otherwise listed in or covered by this Progress Payment will pass to Owner at time of payment free and clear of all Liens, security interests and encumbrances (except such as are covered by a Bond acceptable to Owner indemnifying Owner against any such Liens, security interest or encumbrances); and (3) all Work covered by this Progress Payment is in accordance with the Contract Documents and is not defective. Date: November30, 2022 Name: Title: Brent Simmons Vice President Contractor. •.B . rzCOntI2Ctlr1 .:.InC.:, — -- — ^.. STORED MATERIALS TO DATE TOTAL WORK PERFORMED PLUS STORED MATERIALS $ 1,323,970.70 LESS:'RETAINAGE 5% .:-` PREVIOUS BILLINGS / PAYMENTS $ 1,257,772.16 TOTAL DEDUCTIONS $ 1,257,772.16 AMOUNT DUE CONTRACTOR $ 66,198.54 Percent Complete 100.00% Payment of: is recommended by: G (E neer) SCHAPLJRG & POLK, INC. (D e) Payment of $ 66,198.54 is approved by: �— // 7 /Z3 (Owner) ,GIQ_OFBEAUNIONT^"`<"<;__T_ (Date) Payment of $ 66,198.54 is approved by: (Owner) t_CITYOF BEAAUMONT::"'s_! (Date) Page 1 of 1 CITY OF BEAUMONT LIFT STATION 6 WWfP REPAIRS TROPICAL STORM HARVEY GROUP 4 LIFT STATIONS WU012"10 PROGRESS PAYMENT No. 12-Retsina e - PROGRESS DATE I November30,2022 BID ITEM DESCRIPTION CONTRACT ,QUANTiT,y THIS ' ` ESTIMATE. •'- COSTTHIS ESTIMATE QUANTITY TO DATE TOTAL COST TO DATE REPAIR WORK HMP QUANTITY UNIT UNIT PRICE 1 Mobilization - a Movinacqviomerittoshe 1 LS S10 000.00 S 1 S 10 000.00 S 5 66&00 S 4.332.00 b Insumnx 1 LS S11380.00 I S 1 S 11380.00 S 6,45D.16 S 4929.82 C Performance Bond 1 LS I S8310.DD 1 S 1 S 8.310.00 S 4,710.11 S 3.599.89 d Payment Bond 1 I LS .319.G0 1S 1 S 0.310.00 S 4.710.11 S 3.599,89 ;SU81pTAL LESS;SY. RFMAtNAGE S SUBTOTAL LESS 5% RETAINAGE S 38.000.00 S 21.538.40 S 16.451.60 S S S 1.900.00 S 1,076,92 S 823,08 Is 36,1a0.00 I S 20,461.48 1 S 15,638.S2 BID ITEM DESCRIPTION CONTRACT -=AhTTIIYTHIS' ESTIMATE^- COSTTHIS ESTIMATE QUANTITY TO DATE TOTAL COST TO DATE REPAIRWORK HMP QUANTITY I UNIT UNIT PRICE 2 a Ccordlnat WI r an a ids I r1l I 1 LS $6000.00 S 1 S 6.000.00 S 6400.00 b Disconnect re," and saM . .11esisll electrical equipment for Owner 1 LS S1000.D0 S 1 S 1.000.00 S 1.D00.00 c Furnish and install a new 241 diameter HOPE driveway pipe, including backfill.and gmdin 1 LS S350 W S - 1 S 3,50D.00 S 3,500.00 d Constructa new galvanized steel platform, complete In place including electrical rack, ladder, aluminum handrd0, four(4)16' dia. X Bft RC footings, RC ladder pad 1 LS S16.500.00 - S - 1 S 16.500.00 S 16,500,00 e Furnish and Install new electrical equipment, Including pump control panel, transfer switch, stand-by generator receptacle, miscellaneous geld boxes and seals, service meter and disconnect, grounding, and conduits and conductors 1 LS S30,DD0.00 _ S - .. . 1 S 30.000.00 S 30,000.00 f Reinstall ancorm [ emisting.Fleet Zut m t 1 LS 5 000.00 S 1 S 2.000.00 S 2000.00 Remove and re lace 0­0 cooler (pump no. 2 1 LS S3 900.DD 5 1 S 3.900.60 S 3.200.00 h Removeand replace -pump motor power leads 2 EA 317.00D.00 - S 2 S 34.000.00 S 34.000.00 i Remove andre Iaeo it switches and leads 1 LS $1.800.D0 S 1 5 1.800.00 S 1.800A0 um in 1 LS S500.00 S 1 S 500.00 S 500.00 k SurfaceRestoration 400 SF 50.25 -- S 400 100.00 S 100.00 I T andStart-up 'n 1 LS S700.00 r. S 1 1 S 700.00 S 700.00 re ICOS 3 RelocoteGeneratorR ee tad 1 LS ,419.00 S 1 5 3A19.00 S 3.419.00 ' ' 'SUBTOTAL LESS 58'RETAINAGE S SUBTOTAL LESS 5% RETAINAGE S 103,419.00 S 45,619.00 S S7,800,00 S S S 5.170.95 S 2,280.95 S 2.890.00 S 98.248.05 S 43.338.05 I S 54310.00 BID ITEM ' DESCRIPTION CONTRACT ;'QUAN ITY.THIS ESTIMATE COSTTHIS ESTIMATE QUANTr YTO DATE TOTALCOSTTO DATE REPAIR WORK HMP QUANTITY UNIT UNIT PRICE 3 Char es Street Ltf Station a Coordinate with pavver coirnparry and provide.electrial service 1 LS $6.000.00 S 1 S 6.000.00 S 610D0.00 b Disconnect remove and salve e, all existing electrical equipment for Owner 1 LS S1 000.00 S 1 S 1.000.00 3 1.000.00 c Construct a new galvanized steel platform. complete In place Including 1 LS $16.500.00 S 1 S 16.500.00 S 16.50D.00 of Furnish and Install newelectrical equipment, including pump control panel, - transferswiteh,stand-by generator receptacle, mscollaneous field boxes and seals, service meter anddsconreet, grounding, and conduits and conductors 1 LS 527,90D.00 - - S - 1 S 27,900.00 S 27,900.00 e Reinstall and reeonneet existing Meet Zoom equipment 1 LS S2.000.00 .,. S 1 S 2.000.00 S 2.000.00 f Remove and replace pump motor over leads 2 58.500.00- - S 2 S 17.000.00 S 17.000,00 Remove and re lace float switches and leads 1 LS St 600.D0 - S 1 S 1.800.00 S 1.800.00 h Remove ezistin uard fence 1 LS 52.500.OD - S 1 S 2,500.00 S 2.500.00 I Furnish and Install new Metal Beam Guard Fence 50 LF S80.00 - - S 50 S 4,000.00 S 4,000.00 ss pumping 1 LS S500.00 S 1 S 500.00 S SD0.00 k Surface Res oration 400 SF SM2S S 400 S 100.00 S 100.00 I Testingand Start-up 1 IR S700.00 - S 1 S 700.00 S 700.00 m CO-_ 3 Relocate Gen mtorR tad 1 LS 53.419.00 -- S 1 S 3.419.00 S 3.419.00 SUHTOTAL�,", LESS Sb.RETAtNAGE S SUBTOTAL LESS 61%RETAINAGE S 83,419.00 S 39.619.00 S 43.800.00 S S 4,170.95 S 1,98D.95 S 2,190.00 S 79,248.05 S 37.53&05 S 41,610.00 Page 1 of e CRY OF BEAUMONT LIFT STATION 8. W WPP REPAII S TROPICAL STORM HARVEY GROUP a LIFT STATIONS WU0121-010 PROGRESS PAYMENT No. 12-Retain: a PROGRESS DATE I November30. 2022 COLLIER PGQK IA fEEMA Prntn'1 1544 all Pr1PCYneC nonce Y,. BID REM DESCRIPTION CONTRACT QUANTTTYTHIS ESTIMATE COSTTHIS ESTIMATE- QUANTITY TO DATE TOTALCOSTTO DATE REPAIRWORK HMP QUANTITY I UNR UNIT PRICE a Callier Park Uft Station Coordinate wi. d D de electrical verAce a 1 LS SB 000.00 S 1 S -6.000.00 S 6,000.00 b remove mid salmce on eywing1 LS S7 000.00 S 1 S 1 000.00 S 1 0DO.00 e Furnish and install new electdeal equlpmarlt including pump control panel, transfer switch,standby generator receplad0. remote terminal unit (RTU), service meter and,d'aconnect grounding, and conduits and conductors 1 LS S38,700.00 S - - 1 S 38,700.6 S 38.700.00 d and reconnect existing FleetZoom equipment 1 LS S600.00 S f S 600.00 S 600.00 e TRMII estilg and Start-up 1 LS S700.0D S 1 Is 7D0.00 S 700.00 SUBTOTAL LESS. RETAINAGE COUNTRY CLUB. LS tAA Pro eat-RH15482" - PURCHASE ORDER No. 421245 S SUBTOTAL LESS SSG RETAINAGE S 47,000:00 S 47,000.00 S S S 2,350:00 1 S 2,SSO.00 S S s 44,0.00 650.00 1 S 44.65 S BID ITEM DESCRIPTION CONTRACT QUANTRYTHIS ESTIMATE COSTTHIS ESTIMATE QUANTTTYTO DATE TOTALCOSTTO DATE REPAIR WORK HMP QUANTITY UNIT UNIT.PRICE s C4VntrV ClubU a Coordinate with power compan ,and mWdeNeelricalsemice 1 LS S6000.00 3 - 7 S 6.000.00 S 6.000.DD b Disconnect remove and sahra-e an existing eiaefical eaffemant for Owner 1 LS S1.ODD.00 S 1 S 1.000.00 S 1.000.00 C Consbuet.a new galv2naed steel platform, complete In place including electrical rack, ladder, aluminum handrail, six (6)16' dia.X 8fl RC.footings, and RC ladder pad 1 LS $15.000.00 S - 1 S 15,000.00 S 15,000.00 d Furnish and install now electrical equipment, Including pump control panel, transferswiteh, stand-bygenoratDrreceptacle, miscellaneous fold boxes and seals, 31NVICS meter and disconnect grounding, and conduits and conductors 1 LS MS,34&62 S - 1 S 29,348.62 S 79,34162 d4 Materials on Eland 1 LS s8,851.38 S 1 S 8.851.38 S 8,85138 e Reinstall and reconnect existing Fleet.Zoorn equipment i LS S2,WO.60 S - 1 S 2003000 $ 2,000,00 r Remove - I - m 1 leads 2 EA 510:000.00 S 2 S 20.000.00 S 20.000.00 Remove and replace eaatswltehas and leads 1 LS SI.800:00 S 1 S 1,80D.00 S 1.800.00 h Remove and Install hew chain link fence 1 LS S7 700.00 S 1 $ 1 700.DD S 1,700,01) 1 8 um in 1 LS S500.00 S 1 S 500.00 S 500.00 Su R le on 400 3F I S0.25 5 400 S 100.00 S 100.00 k Test and Start-u 1 LS I W00.00 .. . 1 . 1 S 700.00 S 700.00 SUBTOTAL LESS SY. RETA04AGE FIRETRAINING GROUNDS LS Proeet#HI3483 PURCHASE ORDER No. 421247 S SUBTOTAL LESS 5%RETAINAGE S 87,000.00 S 461500.00 S 40,6D100 S S 4,350.00 $ $325,00 S 2,025.00 S S 82,65000 S 44,175.00 S 38,475.00 BID ITEM DESCRIPTION CONTRACT QUANTTTYTHIS ESTIMATE COSTTHIS ESTIMATE QUANTTIYTO DATE TOTALCOSTTO DATE REPAIR WORK HMP QUANTITY UNIT UNIT PRICE 6 a Coordhate with prewer- and pmide electrical servtee 1 LS $B000.00 S 1 S 6.0o0.0D S 6000.0D b 1 n I tin I r r 1 LS $1000.00 S 1 S 1000.00 S 1000.05 C Constructa new gaWantzed steel platform, complete In place including electrical rack, ladder,aluminum handrail, Install a S50X14' spread fooling, RC ladder pad 1 LS S18,237.00 S 1 - - S 18,237.00 S 18.237.00 d Furnish and Install new electrical equipment Including pumpcontrol panel, transfer switch, atandbygenerator receptacle, miscellaneous 5eldboxes and reels. service melon and disconnect, grounding, and conduits and conductor: 1 LS 529,000.00 S - 1 S 29.000.00 S 29,000.00 , e Reinstall and reconnect existin Fleet Zoom equipment 1 LS S2 000.00 S 1 $ 2.000.00 S 2,D00.00 1 Remove and reolace rumopolor paisyl aft 2 EA SB 500.00 S 2 S 17 000.00 S 1176000.00 RemoveC 1 51.800.OD S 1 S 1.300.00 S 1.e0D.00 h um i 1 LS S500.00 S 1 S 500.00 S 500.00 ISurface Restoration 400 SF SD.25 S 400 S 100.00 S 1DO.00 Te,sting arid Staft 1 LS S700:00 S 1 S 700.00 S 70MOO k C=!! Relocale Generator Rex tade 1 L.S 53.419.00 S 1 S 3.419.00 S 3.419.00 SUBTOTAL LESS.71;.REI'AINAGE „-- •.-. _ S SUBTOTAL LESS SY. RETAINAGE S 79,756.00 S 40.719.00 S 39,037.00 S s $ 3,98TAD S Z03S.95 S 11951.85 s 7S,768.20 I S 38,683.05 s 37,03SAS Pap 2.f 8 CITYOFBEAUMONT LIFT STATION 5 W WTP REPAIRS TROPICAL STORM HARVEY GROUP 4 LIFT STATIONS WU0121-010 PROGRESS PAYMENT No. 12-Retalna e ;:0RFST rl FN 1 S 1` r A 0-1-AMI-A PROGRESS DATE- I November 30. 2022 BID ITEM DESCRIPTION CONTRACT QUANTITY THIS, -ESTIMATE•-"-- COSTTHIS ESTIMATE QUANTTTYTO DATE TOTALCOSTTC DATE REPAIRWORK HMP QUANTITY UNIT UNIT PRICE 7 'o o Coordinate with Power company and provided I sewice 1 LS S6 000. - S 1 S 6,000.00 S 6 000.00 b Discontrimt removeI 1 LS S11000,00 -^: S 1 S 1.000.OD S 1.000.00 c Fumnisha new l6' diameter HOPE driveway pipe 1 LS sas250 < S - 1 S 852.60 S 552.60 d Furnish a new galvanized steel Platform, Including electrical rack, ladder, aluminum handrail 1 LS 561062,50�: S - 1 S 6,062.50 S 6,06250 e Fumish and Install new electrical equipment, including pump control pond. transfer switch, sami nd-by receptacle, miscellaneous field boxes and seals, service melerand disconnect, grounding, and conduits and conductors 1 LS 529,803.1D "' ^ " $ - 1 S 29,803.10 S 2g.W3.10 e-1 Materials on Hand 1 LS 57.494.64 - 5 1 - S 7.494.64- S 7.494.64 fRemoye and 1 I n wetwell 1 LS Sa000.00 - S 1 S 8.000.00 S 8.000.00 Reinstall and reumnneet existing Fleet Zmm ui moot 1 EA $2.000.00 - S 1 S 2.00O40- • -S 2,11=0 h Remove and replace pump motor rleads 1 EA S14.DDO.00 S 1 s 14.000.00 S 14.OW.00 i Rinn". and ro laee.0oatsw6ehes and leads 1 LS 51.800.00 ,. 5 1 S 11800.00 S 1.000.00 Furnish new Metal Beam Guard Fence 1 LS s1 105.26 - 5 1 S 1.10526 S 1A0526 k synat= Plumping1 I LS S3D0:00 '.. S 1 S 300.00 S 300.00 I Surface Restoration 400 SF 50.25 S 400 S 100.0D S 100.00 m Testi an bra-u 1 LS 5700.00 S 1 S 700.00 S 700.00 COS R-i-d Electdcal Panels 1 LS $4 a1735 S 1 S 4.817.35 S 4.917.35 CO6 Install l i corn Rats Service Panel 1 LS 34. 93.00 S 1 S 4,593.00 S 4^593.O11, SUBTOTAL] ; - LESS6-6_'RETAINAGE �.' HILLCREST DRIVE LS IFEIMMA Pra'ect#H134931 PURCHASE ORDER No. 421250 S SUBTOTAL LESS 5%RETAINAGE S 88,62835 S 62.808.09 S 25.820.26 S S 4,431.42 S 3,140.40 S 1291.01 S S 84.196.93 S 59,667.69 S 24.52925 BID ITEM DESCRIPTION CONTRACT 'QUANTITYTHIS�. --1 ESTIMATE- "» COST THIS ESTIMATE QUANTITYTO DATE TOTALCOSTTO DATE REPAIR WORK HMP QUANTITY I UNIT UNIT PRICE a Hlllcrest Llft Station a Coordinate with power company and provide electrical service 1 LS 56000.00 S 1 S 6.000.00 S 6.000.00 b Disconnect remove and selvage all existing electrical equipment for Owner 1 LS S1 000.00 S 1 S 1.000.00 S 1.000.00 c Furnish and Install a new 1W diameter HOPE driveway pipe, Including backfill andgrading 1 LS 52;900.00 S - 1 S 2,900.00 S 2,900.00 d Construct anew gaMnized steel platform, complete in place including electrical rack, ladder, aluminum handrail, four (4)16- die. X lift RC footings, RC ladder pad 1 LS 577,000 00 -c ,,, S - 1 S 17,000.00 S 17,000.00 e Furnish and Install new electrical equipmen4 Including air compressor, 6ontrD1 panel, tansferswilch,stand-bygeneatorrexptacle, miscellaneous field oozes and seals, service meter and disconnect,.. grounding, conduits and conductors. and new ate line 1 LS 538,000.00 :� S - 1 S 36,000.00 S 38,000.00 f Reinstall and reconnect existing Fleet Zoom equipment 1 LS $2 000.00 S i S 2.000.00. S 2.000.00 Remove and replace float switches and leads 1 IS 51 800.00 S 1 S 1.800.00 S 1.8OD.00 h Bypass pumping 1 LS 5400.00 $ 1 S 500.00 S 500.00 i Sunoco Ro"Oration 400 SF 50.25 - S 400 S 100.00 S 10100 " Tesli "and.Starl-u 1 LS 5700.00 - S 1 5 700.00 S 700.00 k CO# 3 Relocate Generator Rex tacle 1 L5 53,419.00 - - .. 5 1 S 3,419.00 S 3419.00 +: SUBTOTAL: -• ES§ 5!L L,RETAINAGE S S SUBTOTAL LESS S/. RECAINAGE S 73:419.00 5 S 23.7000 S 3,670.95 486.49.719.00 5 2.95 S 1.185.0.00 S 69.748.05 5 47233.05 S 22.515.00 - Pape3 af0 CRY OF BEAUMONT LIFT STATION 3 WW TP REPAIRS TROPICAL STORM HARVEY GROUP 4 LIFT STATIONS WU0121-010 PROGRESS PAYMENT No. 12 - Retalna e un In-r crccue o..a..•aw�.er PROGRESS DATE I November30, 2022 BID ITEM DESCRIPTION CONTRACT :'.QIIANTRY THIS; •' ESTIMATE i COSTTHIS ESTIMATE QUANTITYTO DATE TOTALCOSTTO DATE REPAIR WORK HMP QUANTITY I UNIT UNIT PRICE 9 a Coordinate with er carnoamf and provide electrical service ILS S8000.00 7 7 S 1 S 6.000.00 S 6000.00 b Disconnect remove 2r4 gkmoe an existing electrical ment for Owner 1 LS St 000.00 5 1 S 11000.00 S 1,000.00 e Fumish and Install a new 24" diamoter HDPE driveway pipe, Including baekfill and grading 1 LS 53 500.00 '- S - 1 S 31500.00 S 3,500.00 d COrsuud; a new 92WnkW steel platform, complete in placeincluding electrical rrdr, Ladder, aluminum handrail, four (4) 16' dla. X BR RC footings, RC ladder pad 1 LS 517,000.00 ..;. S - 1 S 17,000,00 S 17.000.00 0 Furnish and Install new electrical equipment including pump control panel. trdnsferswilch, stand•bygonemtorreceptacle, miscellancous liold boxes and seats, service meter and disconnect, grounding, and conduits and conductors 7 LS 530,400.00 S - 1 S 30,400.00 S 30,400.00 ( Reinstall and roconnect existing Fleet Zom, eq ui m nt 1 LS S2.000.00 S 1 S 2.000.00 5 7-000.00 Remove mid replace pump motoroower leads 2 EA S8.500A0 - S 2 S 1T.000.00 5 WX00.00 h Removeand replace float switches and leads 1 LS S1,000:00 k.. S 1 S 1.800.00 S 14800.00 i Furnish and install new Metal. Beam Guard Fence 25 LF S120.00 S 25 S 3.00D.00 S 31000.00 a sI umpi-1 LS S500.00 '- S 1 S 500.00 S 500.00 k Sudace.Resto non 400 SF S025 - S 400 S 100.00 S 100.00 I T tin a Start 1 LS 5700.00 - S 1 S 700.00 S 700;00 in COk 3 Relocate Generator Receptacle 1 IS 1 S 3.419:00 S 3.419.00.. ::'.SUBTOTAL ':' .- - LESS S% RETAINAGE . , . - � • S SUBTOTAL LESS 5% RETAINAGE S 86.419.00 S 42.119.00 S 44,300.00 S .S S 4.320.95 S 2,105.95 S 2215.00 S 82,098.05 S 40.013.05 1 S 44085000 BID Maw DESCRIPTION CONTRACT ,QUANTITY THIS- : '-E5T161ATE+?� COSTTHIS ESTIMATE QUANTITY TO DATE TOTAL COST TO, DATE - REPAIR WORK HMP QUANTITY UNIT UNIT PRICE 1D Motor Dr Lift Ststen - - - .a Cowdinale with power company and ovlde'elecuieal service s LS S6.000.00 - S 1 S 6,000.00' 5 6,000.00 b Disconnect remove and salvage all e)dsUng electrical eauloment for Owner 1 LS S1,000.D0 S 1 S 1,000.00 5 1.000.00 e Caatmct a new gaNanlZed steel PI211101m, complete In place Including electrical rack, 12dde , aluminum handrail, four(4) 161 dla. X 8R RC fbotIngs, RC ladder pad 1 LS S20,000.00 -. ,' S - 1 S 20.000.00 S 20,000.00 d Furnish and Install new electrical equipment. including pump control panel, transfer switch, stard-by generator receptacle, miscellaneous field boxes and seals, service meter and disconnect, grounding, and conduits and conductors 1 LS 530,000,0D - - S - 1 S 30,000.00 S 30,000.00 e I Reinstall and reconnect neistin :Fleet Zoom equipment 1 LS S2000,00 r, S 1 S 2.000.00 S 2.000.00 f kemoveand replace pump motor power leads 2 EA 56350:00 S 2 S 12,700.00 S 12.700.00 a replace Remove and lace float Switches and leads 1 LS 52:000.D0 S 1 S 21000.00 S 2.000,00 h Ewass urrin . 1 LS 5500.00 5 1 S 500.00 5 500.00 i SurfaceR storoto. 400 SF 50.25 S 400 S 100.00 S 100.00 Teslin and SiWr_t.P 1 LS I S700.00 S 1 S 700.00 S 700.00 k I CO' 3 Reloote Generator Recetad. 1 LS .419.90 5 7 S 3.419.00 5 3.419.00 ,.-SUBTOTAL' LESS S/.,RETAINAG,E S SUBTOTAL LESS 51. REfAINAGE 5 78,419.00 S 41,719.00 S 36,700.00 S S 3,92095 S 2.085.95 S 1.835.00 S 74,498.05 S 39.633.05 S 34,865.00 CITY OF BEAUMONT LIFT STATION & W WTP REPAIRS TROPICAL STORM HARVEY '• GROUP 4 LIFT STATIONS M0121-01D PROGRESS PAYMENT No, 12-Beta "' err PROGRESS DATE Novemaer30. 2022 -MARTIN LQ 19"A P-TL e1442,147% 0IIor."AC1cARr1FR M. A141e BID ITEM DESCRIPTION CONTRACT QUANTITYTHIS ESTIMATE COSTTHIS ESTIMATE QUANTTTYTO DATE TCTALCOSTTO DATE REPAIR WORK HMP QUANTITY I UNIT UNIT PRICE 11Month Lift Station Ccordinaloaulth powercompiany,and provide electrical servke a - 1 LS 36000.D0 S 1 S 6i000.00 S 8,000.00 b Disconnect, remove and y2tvane as Oftum elecIlical equipment for Owner 1 LS S1000.00 S I S 1000.00 5 1.000.OD a Construct p new galvan'¢adsteel platform, complete In place Including electrical rack, ladder, aluminum handrall, four (4)1 G dia. X Oft RC footings, RC ladder pad 1 LS S19,700.00 S - 1 S 19.700.00 S 19.700.00 d Remove and replace submersible pump, motor. & pump motor power lead (74 Hp) 2 EA S14.0DD.00 S - 2 $ 28,000.00 S 28,00D.00 a Furnish and Install new electrical equipment including pump control pane, Ironsferswitch,stand-by generalorreceptaclo, m'iscolianoaus field boron and seals, service meter and disconnect, grounding, and conduits and conductors 1 LS S29,000:00 S - I S 29400.00 S 29.000.00 f Relftstall and reconnect extsting Real Zoom e ui m nt 1 LS 32W0.00 S 1 S 2400.00 S 2,00D.00 Remove and ro loenfloot switches and leads 1 LS S2.000.00 $ 1 S 2,000.00 S 2.000.00 hayp- ou-phy 1 LS 5600.00 5 1 S 500.00 S 500.00 Surfaee Rest.milort 400 S 5025 S 400 100.00 100.00 andStaft4m 1 LS 1 3700.00 S 1 Is 700.00 S 700.00 k Wing 3 Relocate Generator Re=plZdr 1 LS I W.413.00 S 1 S 3.419.00 S 3.419.00 . SlBTOTAL LESS 595 RETAINAGE S SUBTOTAL LESS W. RETA(NAGE S 92,419.00 S 68,719.00' S 23,70D:00 S S 4,62095 S 3,435.95 S 1.18S,00 S S 87,79&O5 I S 66,283.05 S 22,516.00 OAK RIDGE LS FEMA Pro end H135001 PURCHASE ORDER No. 421255 BID ITEM DESCRIPTION CONTRACT OUANTITYTHIS -ESTIMATE- COSTTHIS ESTIMATE QUANTITY TO DATE TOTALCOST'TC DATE REPAIR WORK HMP QUANTITY UNIT UNIT PRICE 12 Oak Rid o Istation a Coordinate vdth 'power a and mvide electrical service + 56000.00 S 1 6.000.OD S 6.000.00 b Disconnect. remove and salvage ad e)&ft electrical ecruipment for 1 LS S1.000.00 S 1 S 11000.00 S 1,000.(10 a Fumtsh and install a new IZ diameter RCP driveway pipe, Including baddIl and gmding I LS 53mmao S 1 S 3,500.00 S 3.500.00 d Construct a new galvanbted steel platform, complete In place including electrical rack, ladder, aluminum handrall, four (4) IV dia. X Oft.RC footings. RC ladder pad 1 LS S20200:00 S - 1 S 20200.00 S 20,200.00 e Furnish and install new electrical equipment Including pump control panel, transferswltch, stand-by.generelor receptacle, miscellaneous field boxes ao and seals, service motor and dlsnnW. grounding, and conduits and conductors 1 LS �M0.00 - S • ' - -' 1 S 32,000.00 ;r S 32,000,00 f Reinstall and reconnect existing Fleet Zoom equipnont 1 LS S2 DDO.00 S 1 S 2,000.00 5 2.000.00 Remove and replace pump motor power leads 2 EA S4,500.00 S 2 S 9.000.00 S. 9.000.00 h Remove and re lax float switehcs and leads I L6 000.00 S 1 S T000,00 S 2.600.00 I B ass In 9 LS 5600.00 S I S 500.OD S 500.00 SuRaeo Restoration 400 SF SO25 S 400 S 100.00 S 100.00 k Testing end Start u I S 1 SS T00.00 5 700.00 CC# 3 Relocate Generator tads 55410 9 419.00I SUBTOTAL LESS 5Y. RETAINAGE S S S SUBTOTAL LESu S/. RITAINAGE S 80.41&00 S 43.119.W 5 36,700.00 S 4.020.95 S 2.185.95 S 1.835.00 S 76.398.05 1 S 41.53.1.05 I S ' 34.e65AD Page 5 of8 CI Y OF BEAUMONT LIFT STATION & W WTP REPAIRS TROPICAL STORM HARVEY GROUP 4 LIFT STATIONS WU0121.010 PROGRESS PAYMENT No, PROGRESS DATE I November30. 2022 BID REM DESCRIPTION CONTRACT `QUANTIiYTHIS• . f".ESTIMATE" COSTTHIS FSTIMATE QUANTITYTO DATE TOTALCOSTTO DATE RE-PAIRWORK HMP DummyUNIT UNIT PRICE 13 Pine Hawn Lift Station a Coordnate with power companyand provide electrical service 1 LS $8000.00 S 1 S 6.000.00 S 6.000.00 b Disconnect remove and WIV29a all existing elecufmi equipmentfor Owner 1 LS S7CD0.00 S d--•- S 1.000.00 17 1.000.00 c Fumnish a new 18' diameter HDPE driveway pipe 1 LS S852S0 ` S - 1 S 85250 • S 852.5o d Fumish a new galvanized steel platform, including electricalr2ek, ladder, aluminum handrail 1 LS $6,06250 S - 1 S 6,06250 . ` S 6,062.50 ... e Furnish and install now electrical equipment, including pump control panel, transfer switch. stand-by generator receptacle, miscellaneous field boxes and seals, service meter and disconnect, grounding, and conduits and oordw:lors 1 IS $30.815.38 S - 1 S 30,815.38 S 30.816.38 e-1 MRIeWS on Hand 1 LS $7.385.23 - S 1 S 7.35523 S 7.385.23 f Reinstall andreconnectexisting Fleet Zoom equipment 1 LS S Z000.00 S 1 S 2.000.00 S 2000.00 o Remove and'replace,.pump motor power leads 1 EA S15000.00 '• S 1 S 16.000.00 S 15.000.00 h Remove and replace AoatswltChes and leads 1 LS SZ000,00 °-. S 1 S 2.000.00 S 21D00900 ' f Furnish new Metal Beam Guard Fence 1 LS S989.39 - - S 1 S 989.39 S 989.39 S um ' 1 LS 5500.00 - S 1 S 500.00 S 500.00 k SURa RRest tlon 400 w- 50.25 S 400 S 100.00 S 100.00 I I Testing -and Stort-up 1 l5 S700.00 S 1 S 700.00 S 700.00 COS Revised Dectdml Panels 1 LS S4817.35 S i S 4.817.35 S 4.817.35 C06 Install 100A Disconnect & Raise Service Panel 1 LS I S4.593.00 - S 1 S 4.593.00 S 4.593.00 SUBTOTAL:, LESS 5-A.REfAINAGE - - - SAN ANSELMO LS (FENAPmlect"3509) PURCHASE ORDER No. 421257 S S SUBTOTAL LESS 5%RETAINAGE S 82815.35 S 55.910.96 S 26.904.39 S 4.140.77 S 2.795.55 S 1.34522 S S 78,674.58 $ 53.115.41 S 25.S59.17 BID ITEM DESCRIPTION CONTRACT 'QUANTRYTHIS,. _ESTIMATE -"' COSTTHIS ESTIMATE QUANTITY TO DATE TOTAL COST TO DATE REPAIR WORK HMP QUANTITY UNIT UNIT PRICE 14 San Anselmo Lift Station - a Coordinate with pow" company and provide electrical service 1 LS S6.D00.D0 5 1 S 6.000.00 5 6.000.00 b Disconnect.rcmove and saNa can existing electrical ment for Owner 1 LS S1000.00 S 1 S 1.000.00 S 1.000.00 c Modl exls0n eleddeal rack 1 LS S3000.00 S 1 S 3.000.DD S 3.000.00 d Remove and replace submersible pump, motor. & pump motor power lead (2 HP) 2 FA $10.W0.00 S - 2 S 20,000.00 $ 20.000.00 e Furnish and Install new electrcal equipment, including. pump control panel, transfer switch,stand-bygenerator receptacle, macdianeous field boxes and seals, service melerard disconnect, grounding, and conduits and conductors 1 LS 526.664.27 $ - 1 S 26,66427 S 26,664.27 e-1 Materials on Hand .1 LS S8.035.73 S 1 S 8.035.73 S 8.035.73 f Reinstall and n:eonncct existingFloor Zoom o f moot 1 LS S 000.00 s S 1 S 2.000.00 S 2.000.00 Remove and replace Ooat switches and leads 1 LS S2 000.00 S 1 S 2.000:00 S 2,000.00 h Bvp= pumping1 LS S500.00 S 1 S 600.00 S 5D0.00 I Surface Restoration 400 SF 5o25 - -400 400 S 100.00 S 100.00 I Testing and Start-up 1 Lr S700.00 . S 1 S 700.00 S 700.00 :','SUBTOTAL:', LESS SY.`,RETA0WIGE S - S SUBTOTAL LESS 59. RETAINAGE $ 70.000.00. S 63,000.00 S 7.000.00 S 3.500.00 S 3.150.00 S 350.00 S - S 66.500100 S 599850.00 S 6.650.00 Page 9 of a CITY OF BEAUMONT LIFT STATION S W WTP REPAIRS 'TROPICAL STORM HARVEY GROUP 4 LIFT STATIONS WU0121.010 PROGRESS PAYMENT No. PROGRESS DATE November30.2022 TRAM ROAD LS IFEMA Proect#N1351t BID ITEM PURCHASE ORDER No. DESCRIPTION 42125a CONTRACT EST'IM0.T6 COSTTHIS ESTIMATE QUANTfrYTO DATE TOTAL COST TO DATE REPPIR WORK HMP QUANTITY UNIT UNIT PRICE IS lTrCm a Road Lilt Station Ceortlln,ta with cower company en rovide electrical service1 Coordincc! remove and sat eallexistin electdal ui menttor owner / LS LSSIX00.00 SB 000.00 - S S ! 2 S 6.000.00 5 1.000.00 5 Smog 5 1,600.00 e Construct new galvanised steel PIaHOnn, complete In place including electrical rack, ladder, aluminum handrail, four(4) W dia. X Sft RC ! LS $16,700.00 S - t S 16,700.00 S 16,7I70,OD footings, RD ladder pad - • -'- - - Furnish and insiag now eleIX loat equipment inducting pump eontrot panel, d transfer switch, standby generator receptacle, miscellaneous field boxes 1 LS S25,000.00 ..� and sea% scrAce, meter and disconnect, grounding, and conduits and $ - -t _ .. ._ S 26,000,00. S 28,000.00 Inductors e ReI.W and mconnc A axl9tin Fleet Zoom equipment S LS 52 OOD.W f Remove and r replace um motor oowarleads 2 EA 3%000.00 Remove end replace float itch fad 1 LS SZ 090.00 - - h B t ! LS 5S(x1.0 - i SurfaG Raston8on 400 SF SE05 Tess and Star!-u ! LS 57D0.00 _ k t LS S3,419.00 -- - '::. ' ' CO#3 Relocate GeneraWr Relatle .,rv:SUBTOTAC,, LES5;SY. RETAINAGE 5 - 1 S 2 S 1 5 - I 5 40D S t S 1 S SUBTOTAL S - LESSSY.RIarAiNAGE 5 s.000,00i' S 18,000.00 S 2.000.00 S 500.49 S 10D.00 5 700.DO S 3,419.OD S 78.419,00 $ 3.920.95 S 500.00 S 100.00 S 700.00 S 2.000.00 S 12.000.00 S 2.000.00 5 3.419.0D - S 3S_ .00 S 38,700.00 S 1.985.95 IS l,935,00 5 74,498.05 1 S 3T.733.05 I 5 36.755.90 TOTAL COST TO DATE REPAIRWORK HAP VOTH ROAD LS FEMA Proeet:H135t PURCHASE ORDER No. 421259 '.' "` CONTRACT QUANTITY THIS . BID ITEM DESCRIPTION QUANTITY UNIT I UNIT PRICE --`::ESTIMATE". COST THIS ESTIMATE OVANTtTYTODATE 16 a 0 Voth Road Lift Station CagNtnatevrlth cram an arrd ravide ekIXdal service Disconnect. remove endsa a all exis8n-deetrical e ' ment for Dwner 1 I CS LS SS OD0.9D S1.000 00 _ - - - - = 5 - S 1 S S 6.000AO S 6 000.00 S 1.WO.00 S 1.000.OD c Cm-netrata new gatvantted steel Platform, amplat4ln Plaea including electrical rack,ladder, aluminum handrail, four(4) IV dia. X Oft RC t LS $16,700.00 S - 1 S 16,786.06 S 16,700.00 footings, RC ladder pad Furnish and install new electrical equipment. including pump control panel, d transfer switch, standby generator receptacle, miscellaneous Hold boxes 1 LS S26,000.00 and seals, sorMa meter and disconnect, grounding, and conduits and S - t S 28,000.00 S 28,000.00 conductors t Reinstall and reconnect exlsmo Fleet Zoom equipment 1 LS 1 S2 000.0D1 f Remaveandrc lade um motor' power 2 EA 5a 500.00 q Remove and replace t�'at switches and Leads 1 LS 52 000.00 - h ass pumping 1 LS S500.00 - i Surface Res unction 400 OF SO.25 = Testing an Start-up 1 LS S700.00 - - it CO# 3 Relocate Generator Receptacle 1 LS S3.419,00 �° -' ' ': I ;SUBTOTAL',-. �.: LESS5% RETAVIAGE S - 5 - S 5 - S - 5 S S - 1 2 ! 1 400 1 1 SUBTOTAL LESS 5%RETAINAGE S 2.000.00 S 17.0D100 S 2,O00A0 S SDD.DD S SO0.00 S 700.00 $ 3,419.00 S 77AISM S 3.870.95 S 500.00 S 2000.00 S 17.00 0.00 S 2.DOD.DD S 100.00 5 76Q00 8 3.41g.00 S 39.759.00 S 3..00 S S S 1,9 5 S 1,86585.00 S 73,S4a.05 5 37.733.0 25 5 35A75R0 Pagel of a CITY OFBEAUMONT LIFTSTATION & W WTP REPAIRS TROPICAL STORM HARVEY GROUP 4 LIFT STATIONS WUD121-010 PROGRESS PAYMENT No. 12- etaina coat ttco onan r c rccnsa en...t,..a.aw�r�e, PROGRESS DATE I November30 2022 BID'REM - DESCRIPTION CONTRACT QUANTrTYTHIS ESTDAATE COST THIS ESTIMATE OUANTRYTO DATE TOTAL COST TO DATE REPAIRWORK HMP QUANTITY I UNR I UNIT PRICE 1T Walker Road Llft.St Lion a Oeordlnate WID+ COMRR2nd PIM06 electrical sa S6 D00.OD S S S 6.000.00 S 6.000.00 b OMcormt,04 remove and sates a el eA-Xnq electrical eq uloment forOwne 1 LS FROM S 1 5 1.00D:OD S 1,000.00 c Construct a new galvanized steel platform, complete In Place including electrical rack, ladder, aluminum handral, four (4)16- dia. Xan RC footlngs, RCladderpad 1 LS S12.000.00 S - ! S 17.000.00 S 12,000.00 d Furnish and instal now electrical equipment, intudtng POnp contral pant, transfer switch, stand-by generator receptacle, rhlseelonecus.0eld boxes and seats, service meter d(seortneel, grounding, and conduits and conductors 1 LS S24,650.48 S - 1 S 24,SSOA6 S . 24,550.48 d-0 Materials on Hand 1 I LS I M149M 1 5 1 S 9,149.62 S 8.14952 e ReIncallandrecannectex ngneotZoornequIpment 1 1 LS I s2000.00 f S 1 S 2000.00 S 20D0,00 t Remove and r ace gw_M2 motorPower leads 2 S10000.00 S 2 S 20.000.00 S 20,000.00 Remove and re laee0oa swilehes andleads 1 LS SZ000.00 S ! S 2c000.00 S 2,000A0 h 8 ass 1 LS S500.0D S 1 S 500.00 5 500.00 Surfaea Rtstonuan 48D SF S025 S S 1oD.00 5 100.00 Teton and Start 1 LS STO0.00 I S 1 S 700.00 S 700.00 • SUBTOTAL LESS s% RETAINAGE • CONTINGENCY PAYMENT No. PURCHASE ORDER No. 421262 S 5 SUBTOTAL LESS $%RETAINAGE S 77,000.00 S 41.000.00 $ 36,000.00 S 3.e50.470 S 2:050.00 S 1.800.Da S S 73550.00 S 3&950A0 S 34200.00 BID REM DESCRIPTION CONTRACT QUANTITYTHIS ESTIMATE COSTTHIS ESTIMATE QUANTITYTO DATE TOTAL COST TO DATE REPAIR WORK HMP QUANTITY I UNIT I UNrTPRICE i8 Contt n-Unfameenwc*as-dkeeted the Ownernattoexceed- I i I NIOW I S 0.D0 I S 0 S SUBTOTAL LESS 5% RETAINAGE S S SUBTOTAL LESS S/. RETAINAGE 5 S 5 S S S S 7- TOTAL AMOUNT THIS ESTIMATE LESS RETAINAGE TOTAL AMOUNT OF WORK PERFORMED TO DATES l,323,970.70 rS 789,147.45 S 53q.82325 LESS S% RETAIHAGE S 66,198.54 S 39.45T.3T S 26,741,16 TOTALAMOUNT OF WORK PERFORMED LESS RErAIHAGE 5 1.257,772.1T..S 7A9.690.08 S 50&082,09 ., .OAS Page aor 6 APPROVAL OF CONTRACT CHANGE PROJECT: City of Beaumont, Texas Lift Station & W WTP Repairs Tropical Storm Harvey Group 4 lift Stations Bid No. WU0121-10 OWNER: City of Beaumont, Texas 801 Main Street Beaumont, Texas 77704 CONTRACTOR: Brystar Contracting, Inc. 8385 Chemical Road Beaumont, Texas 77705 TOTHE OWNER: Approval of the following contract change is requested. Reason for Change: To adjust final quantities ORIGINAL CONTRACTAMOUNT: I ' REVISED CONTRACT AMOUNT PER CHANGE ORDER No. 6 THIS CHANGE ORDER 18 Contingency. DELETE the unsused Contingency, $50,000.00/LS TOTAL AMOUNT OF THIS CHANGE ORDER: 1 TOTAL REVISED CONTRACT AMOUNT INCLUDING THIS CHANGE ORDER: PERCENT OF THIS CHANGE ORDER TOTAL PERCENT CHANGE ORDER TO DATE CONTRACT TIME Original Contract Time: Revised Contract time per previous Change Orders Additional Time required this Change Order: Revised Contract Time per this Change Order CHANGE ORDER No. Seven (7) & Final DATE: December28,2022 h S 1,320,000.00 $ 1,373,970.70 $ (50,000.00) $ (50,000.00) $ 1,323,970.70 -3.79% 0.30% 210 calendar days 507 calendar days 0 calendar days 507 calendar days CONDITION OF CHANGE: " "Contractor acknowledges and agrees that the adjustments In contract price and contract time stipulated in this Change Order represents full compensation for all increases and decreases in the cost of, and the time required to perform the entire work under the Contract arising directly or indirectly from this Change Order and all previous Change Orders. Acceptance of this waiver constitutes an agreement between Owner and Contractor that the Change Order represents an all inclusive, mutually agreed upon adjustm the Contract, an that Contractor will waive all rights to file a claim on this Change Order after it is properly executed." —� pted by: Reviewed by: Revie by: Brystar Con ting, I c Amalia Villarreal, P.E. ffartBartkowlak Contractor City Engineer r�f�Ji�-�11 �1� Director of Public Works Date:12/28122 ^ Date: ) 1% ~ �Y `� Date: �— / J_ `— 'Schaumburg olk, Inc. Engineer Date: 1212 Approved by: Kenneth R. Williams l City Manager Date: Attested by: Tina Broussard City Clerk Date: APPROVAL OF CONTRACT CHANGE CHANGE ORDER No. Seven (7) & Final DATE: Decomber2B,2022 PROJECT: City of Beaumont, Texas Lift Station & WWTP Repairs Tropical Storm Harvey Group 4 lift Stations Did No. WU0121-10 OWNER: City of Beaumont, Texas 001 Main Street Beaumont, Texas 77704 CONTRACTOR: Brystar`Contracting, Inc. 0335 Chemical Road Beaumont, Texas 77705 TO THE OWNER: Approval of the following contract change Is requested, Reason for Change: To adjust final quantities ORIGINAL CONTRACT AMOUNT: i $ 1 1,320,000,00 REVISED CONTRACT AMOUNT PER CHANGE ORDER No. 6 ,� 1,373,970.70 THIS CHANGE ORDER 10 Contingency. DELETE the unsused Contingency, $50,000.00/1S $ (50,000A0) TOTAL AMOUNT OF THIS CHANGE ORDER: $ (50,000,00) TOTAL REVISED CONTRACT AMOUNT INCLUDING THIS CHANGE ORDER: $ 1,323,970.70 PERCENT OF THIS CHANGE ORDER -3.79% TOTAL PERCENT CHANGE ORDER TO DATE 0.30% CONTRACT TIME Original Contract Time: 210 calendar days Revised Contract time per previous Change Orders 507 calendar days Additional Time required this Change Order: 0 calendar days Revised Contract Time per this Change Order 507 calendar days CONDITION OF CHANGE: "Contractor acknowledges and agrees that the adjustments In contract price and contract time stipulated In this Change Order represents full compensation for all Increases and decreases in the cost of, and the time required to perform the entire work under the Contract arising directly or Indirectly from this Change Order and all previous Change Orders. Acceptance of this waiver constitutes an agreement between Owner and Contractor that the Change Order represents an all Inclusive, mutually agreed upon adjust the Contract, an that contractor will waive all rights to file a claim on this Change Order after it Is properly executed." ,»'°' .-Mc pled by: Reviewed by: Ravia by: Drystar contracting I c Amalla Villarreal, P.E. art Dartkowlak Contractor City Engineer Director of Public Works Date: 12128122 Dalc: � Date: Recon end y' ApPToved by: All s by: chaumburg olk, Inc. Kenneth R. Williams Tina Broussard Engineer Clty M nage%r 4 �1 f Clty Clerk Date:1212 2 Date; �" /�'" �` Date: 6 t - �"°^� t';",":,, ,.,-, 3