HomeMy WebLinkAboutPZ2022-485DATE: January 9,, 2023
TO:
Historic Landmark Commission
FROM:
DerniEngrnan,Senior Planner
SUBJECT:
Arequest for aCertificate ofAppropriateness toreplace aroof,
FILE:
PZ2022-485
STAFF REPORT
Brandon Smith requests permission to replace the roof of a house located at 2575 Pecos Street.
Currently, the roof appears to be brown in color and the material appears to be made of
composition shingles. Hewishes to replace the roof with r-panel galvanized metal. Please see
example of the proposed roof located in your packets.
Section 28.03.018 Historic -Cultural Landmark Preservation Overlay District (g)(M)(i) states
"'RoofmcIterials and colors must complementthe style and overall color scheme of the building
o/ structure —composition shingle, cedar shingle, and metal roofing materials may be
perrn|tied." Mr. Smith intends to replace the metal roof to both the main structure and to the
rear garage apartment.
Staff recommends approval ofthe request.
The house isnot listed lnthe SPARE survey.
Exhibits are attached.
BEAVM4NT
Planning & Community Development
Case TypePlanning and Zoning
Case Sub Type: Certificate of Appropriateness
Case #: PZ2022-485
Location: 2575 PECOS ST, BEAU MONT, 77702
Individuals listed on the record.&
Applicant
Brandon Smith
310 Enfield Ln.
Beaumont, TX 77707
Property Owner
Brandon Smith
310 Enfield Ln.
Missing Address, City, State, or Zip Code in People
Reason for Request of a Certificate of
Appropriateness
Paint
New Construction
Demo
Fencing
Miscellaneous
Has request been made before?
If yes, date:
Nof ;
Case Status: REVIEW
Tag Name: Exterior: Windows, Siding and Roof
Initiated On: 11/29/2022 2:19:45PM
Home Phone:
Work Phone:
Cell Phone: 4093500078
E-Mail: Paramountactx@gmail.com
Home Phone -
Work Phone:
Cell Phone: 4093500078
E-Mail- Paraniountactx@gmail.coni
Replacing Windows with like design but with double panel insulated
windows. Replacing Metal Siding with Hardie Panel Siding.
Replacing Standard Shingle Roof with R-Panel Galvanized Metal
Roofing.
Y
N
N
N
N
Y
This is not a building permit, additional permits may be required
red
for the proposed scope of work.
Case Type: Planning and Zoning Page I of 1
Case #: PZ2022-485 Printed On: 12/16/2022
0
L IL=
Fm-
IM.,
m
z
Q
" I
0
(D
W
fG
rt
:T
iv d
f
0