HomeMy WebLinkAboutRES 22-307RESOLUTION NO. 22-307
BE IT RESOLVED BY THE CITY COUNCIL OF THE
CITY OF BEAUMONT:
WHEREAS, on February.
15, .2022,
the City
Council of the City of Beaumont,
Texas passed Resolution No.
22=056
awarding
a: contract in, the amount of
$2,397,669.50 to Greenscapes Six, LLQ, of Baytown, Texas, for the Concrete
Pavement Repair City Wide Phase 11 Project; and,
WHEREAS, Change Order Nos. 1 and 2, in the amount. of ($55,655.00), are
attached for your review shown on Exhibit "A,'" attached hereto; .and;
WHEREAS, Change Order No. 3, in the amount of $73,090.00, is needed to
adjust quantities of the driveways and concrete repairs on various streets. No additional
days will be added to the contract for additional work. If approved, Change Order No. 3
will. result in a new contract amount of $2,415,1.04.50; and,
NOW, THEREFORE, BE IT RESOLVED .BY THE
CITY COUNCIL OF THE CITY OF BEAUMONT:
THAT the City Manager be and he is hereby authorized to. execute Change Order No. 3,
in the amount of $73,090.00 for additional work described above thereby increasing the
total contract amount to $2,415,104.50 for the Concrete Pavement Repair City Wide
Phase II Project; and,
BE IT FURTHER RESOLVED THAT the Concrete Pavement Repair City Wide
Phase 11 Project be and the same is hereby accepted; and,
BE IT ALSO RESOLVED THAT the City Manager is hereby authorized to make
final payment in the amount of $73,090.00 to: Greenscapes Six, LLC, of Baytown,
Texas.
The meeting at which this resolution was approved was in all things conducted in
strict compliance with the Texas Open Meetings Act, Texas Government Code, Chapter
551.
PASSED BY THE CITY COUNCIL of the City of Beaumont this the 15th day of
November, 2022.raw
�uM®M'�����
® 9
U
o.oBaA � �9
Mayor Robin Mouton -
,gq y�
Contract # General Contract.001
08-Nov-2022 09:38 AM CST
Concrete Pavement Repair City Wide - Phase II
City Wide Beaumont, Texas 77701
Project Number: PW1222-06
General Contract.001: Change Order Number 3
Grand Total: $73,090.00
For General Contract Concrete Pavement Repair City Wide Phase II - General Construction Contract
Division 01
Line Item Unit price
Type
Group 3.0 Construction
Scope of
Work
Notes
Awarded To
Greenscapes Six, LLC
Jerat Parrino
28238
Reason
Quantity Adjustment
Code
Days
0
Changed
Attachments
CO3 DRAWINGS.pdf
Change Order Summary
Original Contract Sum 2,397,669.50 ! Substantial Completion Date 7-Mar-2023
Net Cost by Previous Approved Cos-55.655.001 Net Time Change By Previous Cos 0 days
Contract Sum Before This CO 2,342,014.50 Substantial Completion before This CO 7-Mar-2023
Contract Sum Changed By This CO 73,090.00! Time Changed By This CO 0 days
New Contract Sum 2,415,104.501 New Substantial Completion Date 7-Mar-2023
All Change Orders make up 0.73% of the Original Contract
f Accounting and Status
Accounting Status
Item Id 314
EXHIBIT "A"
PO Number
423072 FEMA Number
Accounting Project Code
Custom Accounting Field 04
Custom Accounting Field 05
; Custom Accounting Field 06
Custom Accounting Field 07
! Custom Accounting Field 08
Line Items
Account
WBS1
Unit
Total
Item # Code
Section
Description Quantity
UoM
Price
Amount
Contract Items
104-
001
REMOVE CONCRETE (CURB) -75.00
LF
20.00
-1,500.00
6001
104-
001
REMOVE CONCRETE (DRIVEWAY) 45.80
SY
25.00
1,145.00
6002
247-
001
FLEX BASE (8") (TY D) (GR-D) (DC) (COMP. IN PLACE) (BASE 467.20
SY
40.00
18,688.00
6001
COURSE)
361-
001
REPAIR OF CONCRETE PAVEMENT (H.E.S. CONCRETE) (6") 152.90
SY
90.00
13,761.00
6001
361-
001
REPAIR OF CONCRETE PAVEMENT (H.E.S. CONCRETE) (10") 314.32
SY
125.00
39,290.00
6003
529-
001
CONCRETE CURB -75.00
LF
20.00
-1,500.00
6001
531-
001
DRIVEWAY (CONCRETE) (T) 45.80
SY
70.00
3,206.00
6001
i
Total
73,090.00
Grand Total: 73,090.00
Approval Approved
Due: 15-Nov-2022
Name or Role
Status
Actions
1 Extemal-GC
Approved
Zach Tiemann
08-Nov-2022 09:17 AM CST
2 Project Manager
Approved
David Tingle
08-Nov-2022 09:18 AM CST
3 City Engineer
1
Approved
Amalia "Molly" Villarreal
08-Nov-2022 09:19 AM CST
4 Director
Approved
Bart Bartkowiak
08-Nov-2022 09:25 AM CST
Name or Role Status Actions
5 Admin Approved
Crystal Garza
08-Nov-2022 09:38 AM CST
APPROVED BY: ATTESTED BY:
Kenneth R. Williams Date Tina Broussard Date
City Manager City Clerk
Contract #General Contract.001
08-Nov-2022 09:38 AM CST
Concrete Pavement Repair City VVide - Phase 11
City Wide Beaumont, Texas 77701
Project Number: PW1222--06
General Contract.DO : Change Order Number 3
Grand Total: $73,090.00
For General Contract Concrete Pavement Repair City Wde Phase 11 - General Construction Contract
Division 01
Line Item Unit price
Type
Group
3.0 Construction
Scope of
Work
Notes
Awarded To
Greenscapes Six, LLC
Jerat Parrino
28238
Reason Quantity Adjustment
Code
❑ ays 0
Changed
Attachments
CO3 DRAWINGS.pdf
Change Order Summary
Original Contract Sum
2,397,669.50 Substantial Completion Date
7-Mar-2023
Net Cost by Previous Approved COs
--55,655.00 ` Net Time Change By Previous COs
0 days
Contract Sum Before This CO
2,342,014.50 S Substantial Completion before This CO
7-Mar-2023
Contract Sum Changed By This CO
73,090.00 Time Changed By This CO
0 days
New Contract Sum
2,415,104.50' New Substantial Completion Date
7-Mar 2023
All Change Orders make up 0.73% of the Original Contract
Accounting and Status
Accounting Status
Item Id
314
PO Number
423072 ' FEMA Number
Accounting Project Code
;Custom Accounting Field 04
Custom Accounting
Field 05
Custom Accounting Field 06
Custom Accounting
Field 07
Custom Accounting Field 08
Line hems
Account
WBSI
Unit
Total
Item # Code
Section
Description Quantity
UoM
Price
Amount
Contract Items
104--
001
REMOVE CONCRETE (CURB)--75.00
LF
20.00
-1,500.00
6001
104--
001
REMOVE CONCRETE (DRIVEWAY) 45.80
SY
25.00
1,145.00
6002
247--
001
FLEX BASE (811) (TY D) (GR--D) (DC) (COMP. IN PLACE) (BASE 467.20
SY
40.00
18,688.00
6001
COURSE)
361-
001
REPAIR OF CONCRETE PAVEMENT (H.E.S. CONCRETE) (611) 152.90
SY
90.00
13,761.00
6001
361--
001
REPAIR OF CONCRETE PAVEMENT (H.E.S. CONCRETE) (1011) 314.32
SY
125.00
39,290.00
6003
529-
001
CONCRETE CURB--75.00
LF
20.00
-1,500.00
6001
531-
001
DRIVEWAY (CONCRETE) (611) 45.80
SY
70.00
3,206.00
6001
Total
73,090.00
Approval Approved
Name or Role
Status
1 External -GC
Approved
Zach Tiemann
08-Nov-2022 09:17 AM CST
2 Project Manager
Approved
David Tingle
08-Nov-2022 09:18 AM CST
3 City Engineer
Approved
Amalia "Molly" Villarreal
08-Nov-2022 09:19 AM CST
4 Director
Approved
Bart Bartkowiak
08-Nov-2022 09:25 AM CST
Grand Total: 73,090.00
Due: 15-Nov-2022
Actions
Name or Role
5 Adm,in
APPROVED BY:
Kenneth R. Williams Date
City Manager
Status
Approved
Crystal Garza
0:8,-Nov-2022 09:38 AM CST
Actions
Tina Broussard Date
City Clerk