HomeMy WebLinkAboutRES 22-283RESOLUTION NO.22-283 BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF BEAUMONT: WHEREAS, on July 19, 2022, the City Council of the City of Beaumont, Texas passed Resolution No. 22-169 awarding a contract in the amount of $89,850.00 to D&M Tanks, LLC, of Kennedale, Texas, for the Elevated and Ground Water Storage Tank Cleaning Project; and, WHEREAS, on September 22, 2022, the City Manager executed Change Order No. 1, in the amount of $2,700.00, to prepare the site and to weld two (2) new lugs for each manway on the prison ground storage tank four (4) in total. Additionally, touchup the coating to repair any damages to the tank coating from welding, thereby increasing the total contract amount to $92,550.00; and, WHEREAS, the project has been inspected by the Water Utilities Division and found to be complete in accordance with the provisions and terms set forth in the contract; and, NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF BEAUMONT: THAT the City Manager be and he is hereby authorized to execute Change Order No. 1, in the amount of $2,700.00 for additional work described above thereby increasing the total contract amount to $92,550.00 for the Elevated and Ground Water Storage Tank Cleaning Project; and, BE IT FURTHER RESOLVED THAT the Elevated and Ground Storage Tank Cleaning Project be and the same is hereby accepted; and, BE IT ALSO RESOLVED THAT the City Manager is hereby authorized to make final payment in the amount of $4,627.50 to D&M Tanks, LLC, of Kennedale, Texas. The meeting at which this resolution was approved was in all things conducted in strict compliance with the Texas Open Meetings Act, Texas Government Code, Chapter 551. PASSED BY THE CITY COUNCIL of the City of Beaumont this the 25th day of October, 2022.MOM��eg01 10, s ks� lop� - Mayor Robin Mouton - CITY OF BEAUMONT Date: Soplembor 22, 2022 Project: Elevated and Ground Storage Tank Claiming Project County: Jefferson District: Beaumont Contract Number: BID NO. WU0422-18 owner. q City of Dooumont Contractor: DSMTANK, LLC C.O. No.: 1 E FOLLOWING CHANGES IN THE PS ANDIOR SPECIFICATIONS ARE HEREBYMADE: Due to corrosion of the existing lugs that hold up the safety chains for the manway covers at the Prison Ground Storage Tank, the lugs will be replaced and any damages to the coaling will be repaired. Additional time Is being added for operational delays in preparing the Prison Site Tanks. Iterim No, It.. Code DESCRIPTION Unit Original Chango In Unit prleo Total uantit Quantity ADD Prepare Site and Weld 2 New Lugs for Each Manway on the. 8 Prison Ground Storage Tank (4 Total). AddllionaliyTouchup . Coaling to Repair any Damages to the Tank Coaling from LS 0 1.00 $ 2,700.00 $ 2,700.00 Welding. SUBTOTAL $ 2,700.00 TOTAL AMOUNT OF THIS CHANGE ORDER $ 2,700.00 - - - .7 CALENDAR DAYS WILL BE ADDED TO THIS CHANGE ORDER" - ORIGINALCONTRACTAMOUNT. S 83.850.00 NET FROM PREVIOUS CHANGE ORDERS: $ TOTAL AMOUNT OF THIS CHANGE ORDER: S - 2,700.00 PERCENT OF THIS CHANGE ORDER: 3.Of Yo TOTAL PERCENT CHANGE ORDER TO DATE: 3.01 % NEW CONTRACTAMOUNT: $ 92,550.00 CONTRACTTIME - ORIGINAL CONTRACT TIME: 40 Calendar Days ADDITIONAL CONTRACT TiME PER PREVIOUS CHANGE ORDERS: 0 ADDITIONAL CONTRACT TIME PER THIS CHANGE ORDER 7.Colandar Days REVISED CONTRACT TIME 47 Calendar Days CONDITION OF CHANGE: 'Contractor acknowledges and agrees that the odjdslments in contract price and contract time stipulated In this Change Order represents full compensation for all Increases and decreases in the cost of, and the Ume required to perform the entire workunderthe contract arising directly orM(eclly from this Change Order and all previous Change Orders. Accepts nce of this waiver consUtulo3 on do raomant between Owner and Contractor that the Ch anlie'Order represents an all Inclusive. mutually agre ad upon adjustment to the Contract, and that Contractor will waive alldphts to filo a claim on this Change Order agar It Is proporly executed." ACCEPTED BY. PREPARE Y: [4 lit 9/22/22 9� 2- 2 DAM TANK, LLG-REP DATE JOHN PIPP SIn, EIT, DATE WATER 9111.171ESgESION MANAGER It REVIEWED BY: REVIE BY -2Z-ZZ A IL RREA P. - DATE B i TKOWIAK DATE CITY ENGINEER DIRECTOR OF PUBLIC WORKS A TECHNOLOGY SERVICES APPROVED BW AATTES BY: a KENNETH R.WILLIAMS DATE TINA BROUSSAR - DATE CITY MANAGER CITY CLERK EXHIBIT "A" D&M TANK LLC 6901 Mansfield Cardinal Rd. Kennedale, TX 76060 Office/Fax (817)841-8593 Office: (214)882-5664 APPLICATION FOR PAYMENT TO: Owner Representative APPLICATION NO: City of Beaumont APPLICATION DATE: October 18, 2022 861 Main, Suite 210 _ Beaumont TX 77701 PROJECT NO: r WU0422 18� DISTRICT: City of Beaumont PROJECT: Elevated and Ground Storage Tank Cleaning Project CONTRACT DATE: August 10, 2022 NOTICE TO PROCEED: August 29, 2022 APPLICATION PERIOD TIME USED THIS APP.: ( " ^12i00 from September 30, 2022 TIME USED TO DATE: ( 44 00 to:October, 12, 2022� _ CONTRACT TIME: 47 PERCENT USED: 94%� CONTRACTOR'S APPLICATION FOR PAYMENT Application is made for payment, as shown below, in connection with the attached Continuation Sheet. 1. ORIGINAL CONTRACT AMOUNT (SECTTION - A) 2. Alternate Bid Item (SECTION - B) 3. Net change by Change Orders 3a. Net Change by Quantity Adjustments 4. CONTRACT SUM TO DATE (Line 1 t 2) 5. TOTAL COMPLETED TO DATE (Column I on Continuation Sheet) 6. RETAINAGE: 5 % of Completed Work C2% of Column I on Continuation Sheet) 7. TOTAL EARNED LESS RETAINAGE (Line 36 Less Line 35 Total) 8. LESS PREVIOUS APPLICATIONS FOR PAYMENT (Line 7 from prior APPLICATION) 9. CURRENT PAYMENT DUE 10. BALANCE TO FINISH, INCLUDING RETAINAGE (Line 4 less Line 5) SUBMITTED: Nz4z.8 g, D&M TANK LLC DATE: 10/18/22 $ 89,850.00 $ 2,700.00 $ 92,550.00 $ 52,550.00 $ - $ 92,550.00 $ 87,922.50 $ 4,627.50 APPROVED: O er Repres ntative DATE: `0 IT A-z