HomeMy WebLinkAboutRES 22-281RESOLUTION NO.22-281
BE IT RESOLVED BY THE CITY COUNCIL OF THE
CITY OF BEAUMONT:
WHEREAS, on May 24, 2022, the City Council of the City of Beaumont, Texas
passed Resolution No. 22-137 awarding a contract in the amount of $945,290.02 for the
Citywide Ditching Program Phase I and,
WHEREAS, Change Order No. 1, is required in the amount of $22,840.34, to
adjust three (3) additional driveway culverts that were found to be off in elevation, add
headwall replacement for a driveway, and an additional 3,243 linear feet of ditching to
reflect the work that was completed in Wards 2 and 3. No additional days will be added
to this contract for additional work; and,
WHEREAS, the project has been inspected by the Water Utilities Division and
found to be complete in accordance with the provisions and terms set forth in the
contract; and,
NOW, THEREFORE, BE IT RESOLVED BY THE
CITY COUNCIL OF THE CITY OF BEAUMONT:
THAT the statements and findings set out in the preamble to this resolution are
hereby, in all things, approved and adopted; and,
THAT the City Manager be and he is hereby authorized to execute Change
Order No. 1, in the amount of $22,840.34 for additional work described above thereby
increasing the total contract amount to $968,130.36 for the Citywide Ditching Program
Phase I; and,
BE IT FURTHER RESOLVED THAT the Citywide Ditching Program Phase I; be
and the same is hereby accepted; and,
BE IT ALSO RESOLVED THAT the City Manager is hereby authorized to make
final payment in the amount of $22,840.34 to the Citywide Ditching Program Phase I.
The meeting at which this resolution was approved was in all things conducted in
strict compliance with the Texas Open Meetings Act, Texas Government Code, Chapter
551.
PASSED BY THE CITY COUNCIL of the City of Beaumont this the 25th day of
October, 2022.
.bvx3! .
RW-6 dz�
/
- Mayor Robin Mouton -
Contract # 002.001
1 9-Oct-2022 08:56 AM CST
FY22 City Wide Ditching Program
801 Main Street Beaumont, Texas 77701
Project Number: PW0222-11
002.001: Change Order No. 1
Grand Total: $22,840.34
----- ........
For 002 FY22 Ditching Construction
---- - ------- -- -------
Division 00000
Line Item Unit price
Type
Group 3.0 Construction
Scope of Reset the driveway at 9680 Gross Street and 395 Norvell Street. Replace 24 in RCP pipe at empty lot next to 9755 Shepherd Drive with
Work an 18 in RCP pipe. Addition 1,927 LF of Ditching for Ward 3 on Duke Street, Texas Avenue, Delaware Street, and Pine Street. Addition of
headwall replacement for Driveway 31 (4365 Berkley Avenue). Driveway 52 will not be reset, so material from that will be used on the
driveways added into the project.
.... . ..... .......... .. ... ... ... .
Notes Additional 1,316 LF of ditching quantity to Ward 2 to reflect actual ditching done. Ditching in Ward 2 is finished.
Awarded To Texas Drainage, Inc.
Rosemary Selvidge
28345
Reason Owner Requested
Code
Days 0
Changed
Attachments
- - - - - - - - - - - - - - - - - - - - - -
Change Order Summary
Line Items
Item # Account Code
WBS/ Section
Description
Quantity UoM
Unit Price
Total Amount
3.0 Construction
464-3
01000
RC PIPE (CL 111) (18 IN)
16.00
LF
126.00
2,016.00
464-4
01000
RC PIPE (C.L 111) (24 IN)
21.00
LF
150.00
3,150.00
466
01000
------ -----
Headwall Structure
1.60
EA
3,000.00
3,000.00
496-4
01000
REMOVE STR (PIPE) (RCP) (24 IN)
37.00
LF
25.00
925.00
5000-1
01000
DITCH CLEANING AND RESHAPING (WARD 2)
1,316.00
LF
3.48
4,579.68
. . .......... ..
5000-2
01000
DITCH CLEANING AND RESHAPING (WARD 3)
1,927.00
LF
3.48
6,705.96
500-1
01000
.... ..... ... .
MOBILIZATION
0.06
... ..... ....
LS
. . -
8,000.00
500.00
6000-2
01000
REMOVE &.REPLACE ASPHALT (DWY/SIDEWALK)
26.90.
SY
73.00
1,963.70
Total 22,840.34
Grand Total: 22,840.34
Approval Approved
Name or Role
I Extemal-GC
2 Project Manager
3 City Engineer
4 Director
5 Admin
Status
Approved
Rosemary Selvidge
11-Oct-.2022 01:44, PM CST
........ ...
Approved
Colby Anderson
I I -Oct-2022 02:05 PM CST
Approved
Amalia "Molly" Villarreal
19-Oct-2022 08:50 AM CST
Approved
Bart Bartkowiak
19-Oct-2022 08:52 AM CST
Approved
Crystal Garza
19-Oct-2022 08:56 AM CST
- --------- ---
Due: 26-Oct-2022
-------------
Actions
APPROVED BY:
Kenneth.R.. Williams
City Manager .
Date
ATTESTED BY:
Tina Broussard
City Clerk
Contract # 002.001
19-Oct-2022 08:56 AM CST
002.001: Change Order No. 1
FY22 City Wide Ditching Program
801 Main Street Beaumont, Texas 77701
Project Number: PW0222-11
Grand Total: $22,840.34
For 002 FY22 Ditching Construction
Division 00000
Line Item Unit price
Type
Group 3.0 Construction
Scope of Reset the driveway at 9680 Gross Street and 395 Norvell Street. Replace 24 in RCP pipe at empty lot next to 9755 Shepherd Drive with
Work an 18 in RCP pipe. Addition 1,927 LF of Ditching for Ward 3 on Duke Street, Texas Avenue, Delaware Street, and Pine Street. Addition of
headwall replacement for Driveway 31 (4365 Berkley Avenue). Driveway 52 will not be reset, so material from that will be used on the
driveways added into the project.
Notes Additional 1,316 LF of ditching quantity to Ward 2 to reflect actual ditching done. Ditching in Ward 2 is finished.
Awarded To Texas Drainage, Inc.
Rosemary Selvidge
28345
Reason owner Requested
Code
Days 0
Changed
Attachments
Change Order Summary
Original Contract Sum
Net Cost by Previous Approved Cos
Contract Sum Before This CO
Contract Sum Changed By This Co
New Contract Sum
All Change Orders make up 2.42% of the original Contract
Accounting and Status
Accounting Status
945,290.02 Substantial Completion Date
0.00 Net Time Change By Previous COs
945,290.02 Substantial Completion before This CO
22,840.34 Time Changed By This Co
968,130.36 New Substantial Completion Date
0 days
0 days
Item Id 305
PO Number 423913 FEMA Number
Accounting Project Code STCWDP ;Custom Accounting Field 04
Custom Accounting Field 05 Custom Accounting Field 06
Custom Accounting Field 07 Custom Accounting Field 08
Line items
Item # Account Code
WBS1 Section
Description
Quantity UoM
Unit Price
Total Amount
3.0 Construction
464-3
01000
RC PIPE (CL 111) (18 IN)
16.00
LF
126.00
2,016.00
464-4
01000
RC PIPE (CL III) (24 IN)
21.00
LF
150.00
3,150.00
466
01 000
Headwall Structure
1.00
EA
3,000.00
3,000.00
496-4
01000
REMOVE STR (PIPE) {RCP} (24 IN)
37.00
LF
25.00
925.00
5000-1
01000
DITCH CLEANING AND RESHAPING (WARD 2)
1,316.00
LF
3.48
4,579.68
5000-2
01000
DITCH CLEANING AND RESHAPING (WARD 3)
1,927.00
LF
3.48
6,705.96
500-1
01000
MOBILIZATION
0.06
LS
8,000.00
500.00
6000-2
01000
REMOVE & REPLACE ASPHALT (DWYISIDEWALK)
26.90
SY
73.00
1,963.70
Total
22,840.34
Grand Total: 22,840.34
Approval Approved
Due: 26-Oct-2022
Name or Role
Status
Actions
1 External -GC
Approved
Rosemary Selvidge
1 1-Oct-2022 01 :44 PM CST
2 Project Manager
Approved
Colby Anderson
11-Oct-2022 02:05 PM CST
3 City Engineer
Approved
Amalia "Molly" Villarreal
1 9-Oct-2022 08:50 AM CST
4 Director
Approved
Bart Bartkowiak
1 9-Oct-2022 08:52 AM CST
5 Admin
Approved
Crystal Garza
1 9-Oct-2022 08:56 AM CST
A' PP,ROVED BY:
I'd
Kenneth R. Williams Date
City Manager
ATTESTED BY:
0 c(4 I()
1), ri l�
m
Tina Broussard Date
6ftCity Clerk
—