HomeMy WebLinkAboutRES 22-216RESOLUTION NO. 22-215
BE IT RESOLVED BY THE CITY COUNCIL
OF THE CITY OF BEAUMONT:
THAT the 2023 Capital Program is hereby adopted. The Capital Program is substantially
in the form attached hereto as Exhibit "A.° The Capital Program was originally submitted
to Council on May 10, 2022 and August 9, 2022. A public hearing was held on August 30,
2022.
The meeting at which this resolution was approved was in all things conducted in
strict compliance with the Texas Open Meetings Act, Texas Government Code, Chapter
551.
PASSED BY THE CITY COUNCIL of the City of Beaumont this the 13th day of
September, 2022,
110111FINW, In
f
- Mayor Robin Mouton -
TEXAS
August 9, 2022
City Council:
The proposed Capital Program for Fiscal Years 2023-2027 is hereby submitted. The Capital
Program is a plan prepared annually to provide for physical development within the City of
Beaumont. The City Charter requires the submission of the Capital Program to Council
three months prior to the final date for submission of the budget, which is August 15th of
each year. The Capital Program is adopted with the annual operating budget.
The Capital Program includes a listing of all Public Works, General Improvements and
Water and Sewer improvement projects along with project descriptions and cost estimates.
Public Works includes street and drainage projects; General Improvements include general
municipal buildings, facility and park improvements; Water and Sewer includes all projects
related to water and sewer infrastructure.
Projects are classified in two phases: design or construction, or projects for
consideration. A project classified in the design or construction phase is currently under
design or construction or is projected to be within the recommended time schedule.
Projects classified as for consideration includes projects that will be considered in the
future as funding becomes available. Some projects in this category have been designed
or have some costs incurred such as the acquisition of rights -of -way or real property.
All available funding sources are considered including Certificates of Obligation, grant
funding from various agencies, Water and Sewer Revenue Bonds, other financing methods
and available cash.
The City normally issues Certificates of Obligation (CO's) on an as needed basis, to provide
sufficient cash flow for active Public Works and General Improvement projects.
The City routinely issues Water Revenue Bonds for Water and Sewer projects on an as
needed basis. This type of bond is serviced utilizing revenues from water and sewer
customers.
City of RMIMOnt EXH I BIT "A" FY23 Budget
Through projects in the Capital Program, the City of Beaumont strives to enhance the quality
)' of life for its residents. This plan represents our best effort to identify projects that provide
the greatest benefit to the citizens of Beaumont.
Respectfully Submitted,
Chris Boone
Interim City Manager
City of Beaumont 220 FY23 Budget
PUBLIC WORKS PROJECTS
Design or Construction Phase.
City Wide Ditching Program
Fourth Street - US 69 to Ashley
Storm Water Pipe Inspections and Point Repairs
Street Rehabilitation Program
Threadneedle Outfall Rehabilitation
Projects for Consideration
Avenue A - Washington to College
Broadway - ML icing Jr. Parkway to 11th
Calder Avenue Bridge Widening
Carroll Street and Sycamore Street
Doucette Avenue - Sycamore Street to Van Buren Avenue
Dowlen - College to IH-10
East Lucas - Magnolia to Pine
Gladys Street - IH-10 to Dowlen
Highland Avenue - US 69 to Euclid
Jim Gilligan - ML Icing Jr. Parkway to Jimmy Simmons
Laura Addition Drainage Improvements
Neches Street ML King Jr. Parkway to College Street
Park Street - ML King Jr. Parkway to College Street
Pecos Street - Jaguar to 3rd
Phelps Road and Downs Road Drainage Improvements
Pointe Parkway North
Estimated
Cost
2,000,000
6,000,000
1,000,000
8,000,000
6,000,000
1,900,000
1,400,000
1,800,000
1,700,000
1,400,000
29,900,000
600,000
3,500,000
3,800,000
1,500,000
1,000,000
2,400,000
2, 500,000
1,600,000
1,000,000
4,800,000
Recommended
Time Schedule
EY 2023
PY 2023 -2027
Note - Unless otherwise noted, all projects would be financed through Certificates of Obligation
tatty of Beaumont 221 FY23 Budget
GENERAL. IMPROVEMENT PROJECTS
Estimated
Design or Construction Phase
Cost
Fleet Facility Parking Lot Improvements
$ 2,600,000
Parks & Recreation Enhancement Prooram
1,460.000
Property Located at 555 Main Street
5,000,000
Riverfront Park Improvements
28,150,000 (11
Projects for Consideration
Lake District Restroom Facility
488,000
Large Airport Hangar
2,329,000
New "T" Hangar
2,800,000
Proporty Located at 4650 Lafin Road
1,600,000
[i ] Funded 90°% by FEMA, 7.6 % by TDEM and 2.6% by the City with remaining bond proceeds.
3?
_1 Note - Unless otherwise noted, all projects would be financed through Cerliflcates of Obligation or available cash.
Recommended
Time Schedule
FY 2023
FY 2023 - 2027
City of Beauniont 222 FY23 Budget
WATER AND SEWER PROJECTS
Design or Construction Phase Estimated
^� Cost
Water Protects
Bunn's Canal Rehabilitation Engineering
Dead End Flushing
Lawson's Canal Maintenance Engineering and Permitting
Loeb Motor Starter And Electrical Improvements
New Raw Water Delivery Line
New Raw Water Pump Station
Orange Avenue Water Main Rehabilitation
Pine Street Water Production Plant Chemical Improvements
Pine Street Water Production Plant Chlorins Dioxide
Injection
Pine Street Water Production Plant South Basin Sludge Drain
Rehabilitation
Southwest Elevated Storage Tank Rehabilitation
Water Line and Fire Hydrant Installation/Replacement
Water Production System - Repairs
Water Transmission tine Rehabilitation
i3
400,000
150,000
1,050,000 [1]
3,360,000 [2]
18,300,000 [3)
29,050,000 (1 )
400,000
1,600,000 [4]
1,300,000
600,000 [4]
1,500,000
2,000,000
1,400.000
100,000
[11 Funded W04 by FEMA, 7,51/o TDEM and 2.6% by the City with available cash or Water and Sewer Revenue Bonds.
[2) Possibly funded two-thirds by t EMA and one-third by Iho City with available cash or Water Sewer Revenue Bonds.
13) Federal funding Eras been awarded In tha amount of $9.8 million.
14) Funded by American Rescua Funds
Note - Unlass otherwise noted, all projecls would be financed through Water and sewer Revenue Bonds
Recommended
Time Schedule
FY 2023
City of Beaumont 223 FY23 Budget
WATER AND SEWER PROJECTS
Design or Construction Phase (ConVd) Estimated
Cost
Sewer Projects
Assessment of Sewer Collection System Phase III - City Wide
650,000
Harriet Litt Station Rehabilitation
2,000,000
[1]
Lift Station Electrical Improvements
660,000
Lift Station Repairs and Maintenance
400,000
Sewer Main Rehabilitation
7,400,000
[1]
Sewer Main Rehabilitation
6,000,000
[2]
?]I and Avenue C Lift Station Rehabilitation
2,200,000
[1]
Wastewater Treatment Plant Road Repairs
750,000
Wastewater Treatment Plant Sludge Dewatering Phase 11
875,000
(Drying Bed Rehabilitation Phase 1)
Wetlands Cell 6 Restoration
3,600,000
Water and Sewer for Street Projects
TxDOT IH-101Hwy 69 Cardinal Interchange 5,000,000 t31
TxDOT IH-101Hwy 69 Hastex Interchange 14,400,000 131
(i) Funded loO% by Aniarican Reseua l:unds
[2] Funded by American Rescuo Funds in the, amount or $2.5 Million vrith the rest funded by Water and Sewer Bond;
[3j Funded 100% by TxDOT
Note -Unless othenvise noted, all projects vrould be financed Ihroucdh Water and Sewer Revenue Bonds
Recommended
Time Schedule
FY 2023
City of noautnont 224 FY23 Hudget
WATER AND SEWER PROJECTS
Projects for Consideration Estimated
Cost
Water Projects
Bunn's Canal Rehabilitation
Dishman Tank Chlorine Rooster System
Lawson's Canal Maintenance Project
Lawson's Pump Station Pump Redundancy
Loeb Groundwater Treatment Plant Sulfur Treatment
Northwest Elevated Storage Tank Rehabilitation
Pine Street Water Production Plant Desludging Project
Pine Street Treated Water Resiliency Line - Construction
Pine Street Water Line 1 Replacement
Pine Street Water Line 2 Replacement
Pine Street Water Line 3 Replacement
Pine Street Water Line 4 Replacement
Pine Street Water Line Resiliency Inspections
Prison Ground Storage Tank Rehabilitation
South Elevated Storage Tank Rehabilitation
Wastewater Treatment Plant - Pond No. 2 Rehabilitation
West Side Water Treatment Plant
tii rEMA HMGP Funds are being applied forwllh a lu% match requirement
Note - Unless olhorydse noted, all projects would be financed through water and Sewer Revenue ponds
4,100, 000
400,000
9,400,000
200,000
760,000
1,450,000
2,500,000
7,600,000
6,000,000
2,100, 000
3,600,000
4,700,000
400,000
900,000
1,300,000
3,600,000
100,000,000 111
Recommended
Time Schedule
FY 2023 - 2027
City of Beattmunt 225 FY23 Budget
Recommended
Proiects for Consideration{Cont'd Estimated Time Schedule
Cost FY 2023 .. 2027
Sewer Prolects
Florida Avenue Interceptor Phase 11 1,400,000
Sewer Trunk Line Rehabilitation 3,000,000
Wastewater Treatment Plant Automatic Transfer Switches 1,100,000
Wastewater Treatment Plant Chlorine Contact Chamber Wall 400,000
Rehabilitation
Wastewater Treatment Plant Drying Bed Rehabilitation Phase Il
1,000,000
Wastewater Treatment Plant Headworks Degritter
1,500,000
Wastewater Treatment Plant High Flow Detention Pond
6,250,000
Wastewater Treatment Plant High Flow Station Flow Monitoring
300,000
Wastewater Treatment Plant - Pond No. 3 Rehabilitation
1,850,000
Wetlands Secondary Barscreen
600,000
ter/Sewer for Street Praiocts.
.1
Dowlen - College to IH-10
4,000,000
Pointe Parkway North
650,000
Note - Unless othervriso noted, all projoots would be financed through Water and Sevier Revenue Bonds
City of Beaumont 226 FY23 Bridget
PUBLIC WORKS PROJECTS
AVENUE A -- WASHINGTON TO COLLEGE
The section of Avenue A, from Washington to College, is a two-lane; two-way collector roadway
that has reached the end of its useful life and has many pavement failures. This section of roadway
will receive an asphalt overlay. The estimated cost for the project is $1,900,000,
BROADWAY -- Mt_ KING JR. PARKWAY TO 117H
This section of Broadway Street reached the end of its useful life and has many pavement failures.
The roadway will receive an asphalt overlay. The estimated cost for the project is $1,400,000,
CALDER AVENUE BRIDGE WIDENING
Constructed in 1948, the bridge located on Calder Avenue over the Hillebrandt Bayou Is a concrete
flat deck bridge that is 23 feet and 4 inches wide, back-to-back of curb, allowing about 22 feet of
clear width for travel. This projectwould be for the removal of the existing structure and replacement
with a clear span 40-feet wide structure. The upgraded bridge would allow for wider traffic lanes
across the bridge with an additional shoulder and it would also provide for a protected pedestrian
sidewalk route along one side of the bridge, The estimated cost for the project is $1,800,000.
CARROLL STREET AND SYCAMORE STREET
The section of Sycamore and Carroll, from Buford to Fulton, is a four -lane; two-way Collector
roadway that has reached the end of its useful life and has, many pavement failures. This section
of roadway will receive concrete repairs and an asphalt overlay. The estimated cost for the project
is $1,700,000.
DITCHINGCITY WIDE PROGRAM
The City of Beaumont owns, operates, and maintains 316 miles of drainage ditches. The Ditching
Program will be an annual project to clean and reshape drainage ditches and to clean out culverts.
The estimated cost for the project is $2,000,000 per year and will allow for yearly maintenance on
approximately 20% of drainage ditches owned by the City.
DOUCETTE AVENUE — SYCAMORE STREET TO VAN BUREN AVENUE
The section of Doucette Avenue, from Sycamore Street to Van Buren Avenue, is a two-lane, one-
way residential roadway. This section has reached the end of Its useful life and Is beginning to
experience pavement failures, This section of roadway will receive curb and gutter repairs, base
repairs and an asphalt overlay. The estimated cost for the project is $1,400,000.
DOWLEN - COLLEGE TO IH-10
The extension of Dowlen Road, to south of College, is needed to provide an additional north/south
corridor in the developing southwest area of the City. Specifically, it will extend from College to IH-
10. This project will consist of the construction of a concrete curb and gutter roadway and
installation of storm sewer lines, inlets, manholes, city utilities, and sidewalks. The estimated cost
(AY of Beeuatorit 227 FY23 Budget
for the project is $2%900,000. The cost for water infrastructure is shown under Water and Sewer
Projects,
EAST LUCAS — MAGNOLIA TO PINE
The section of East Lucas, from Magnolia to Pine, is a two-lane, two-way collector roadway that
currently has a pavement width of twenty-one (21) feet with two ten and a half (10.5) foot travel
lanes. This section of roadway will receive a pavement widening to allow for two eleven and a half
(11.5) foot travel lanes as well as an asphalt overlay. The estimated cost for the project is $600,000,
FOURTH STREET -- US 69 TO ASHLEY
The section of Fourth Street, from US 69 to Calder, is a four -lane Major Arterial, and from Calder
to Ashley, is a two-lane roadway. The roadway has reached the end of its useful life and has many
pavement failures. Fourth Street will receive an asphalt overlay. The estimated cost for the project
is $6,000,000,
GL6DYS STREET - IH-10 TO DOWLEN_
The section of Gladys Street, from IH-10 to Edson, is a four -lane concrete curb and gutter roadway.
The section from Edson to Dowlen, is a two-lane asphalt roadway with curb and gutters. This
section has reached the end of its useful life and is beginning to experience pavement failures. This
section of Gladys will receive an asphalt overlay. The estimated cost for the project is $3,600,000,
HIGHLAND AVENUE -- US 69 TO EUCLID
The section of Highland Avenue, from US 69 to Euclid, is a four -lane Arterial roadway. This section
has reached the end of its useful life and has many pavement failures. Highland Avenue will receive
an asphalt overlay, The estimated cost for the project is $3,800,000,
JIM GILLIGtiAN — MIL KING JR. PARKWAY TO ,JIMMY SIMMONS
The section of Jim Gilligan, from Ml_ King Jr. Parkway to Jimmy Simmons, is a four -lane Arterial
roadway. This section has reached the end of its useful life and Is beginning to experience
pavement failures. This section of roadway will receive an asphalt overlay. The estimated cost for
the project is $1,500,000.
LAURA ADDITION DRAINAGE IMPROVEMENTS
The streets that make up the Laura Addition in Beaumont are Chambless [give, Theresa Street,
Bun Street, and Ammie Street. This area is in need of improvements to the drainage infrastructure.
The estimated cost for the project is $1,000,000,
NECHES STREET— ML KING JR. PARKWAY TO COLLEGE STREET
The section of Neches Street, from ML king Jr. Parkway to College, is a two-lane; two-way Collector
roadway that has reached the end of its useful life and has many pavement failures. This section
% of roadway will receive curb and gutter repairs, base repairs and an asphalt overlay. The estimated
cost for the project is $2,400,000.
CRY of Beaumont 220 rY23 Budget
PARK STREET — ML KING JR. PARKWAY TO COLLEGE STREET
The section of Park Street, from MI_ King Jr. Parkway to College, is a three -lane; one-way Arterial
roadway that has reached the end of its useful life and has many pavement failures. This section
of roadway will receive curb and gutter repairs, base repairs and an asphalt overlay. The estimated
cost for the project is $2,500,000.
PECOS STREET — JAGUAR TO 3s°
The section of Pecos, from .Jaguar to 7th, is a one -lane; two-way residential roadway with a center
median. The section of Pecos Street, from 7th to 3rd, is a one -lane; two-way Residential roadway
that has reached the end of Its useful life and has many pavement failures, Both sections of
roadway wiil receive new curb and gutter, base repairs and an asphalt overlay. The estimated cost
for the project is $1,500,000,
PHELPS ROAD AND DOWNS ROAD DRAINAGE IMPROVEMENTS
This section of Phelps Road and Downs Road, from F'annett to Tyrrell Park Is in need of
Improvements to the drainage infrastructure. The estimated cost for the project is $1,000,000,
POINTE PARKWAY NORTH
Pointe Parkway North will directly tie into Northwest Parkway and provide a direct interconnection
with Highway 105. The project will include the construction of a curb and gutter roadway, storm
sewer infrastructure, water and sewer infrastructure and sidewalks. The estimated cost for the
project is $4,800,000. The cost for water and sewer infrastructure is shown under Water and Sewer
Projects.
STORM WATER PIPE INSPECTIONS AND POINT REPAIRS.
The City of Beaumont owns, operates, and maintains 421 mites of storm water lines. The Storm
Water Pipe Inspections and Point Repair Program will be an annual project to inspect, clean and
perform point repairs on large trunk line storm sewers maintained by the City of Beaumont to
promote drainage. The estimated cost for the project is $1,000,000 per year.
STREET REHABILITATION PROGRAM
Improvements will be identified on an annual basis, Improvements may include concrete curb and
gutter repairs, concrete pavement repairs, and asphalt overlay projects. The City will spend an
estimated $8,000,000 per year.
THREAONEEDLE OUTPALL REHABILITATION.
Installed in 1927, the Threadneedle Outfall, located in the southeastern portion of the city,
originates at the west and of Euclid Street, runs south along Avenue A to Threadneedle Street
where It turns east, ultimately terminating at the Neches River marsh on the east side of
ExxonMobil. Over the years, due to settlement of the ground, a point repair and lining of the 72"
line, within the Boundaries of the ExxonMobii property, are needed to restore integrity and promote
design. The estimated cost for the project is $5,000,000.
My or Beaumont 229 FY23 Budgel
GENERAL IMPROVEMENT PROJECTS
FLEET FACILITY PARKING LOT IMPROVEMENTS
The concrete paving and driveways have reached the end of their useful life and have been
experiencing numerous pavement failures. This project consists of a reconstruction of parking lot
areas, drive access, and the addition of a storm water collection system, The estimated cost for
the project Is $2,600.000; however, the project will be conducted in phases. Different phases of this
project would be paid for with available cash or financed through Certificates of Obligation.
LAKE DISTRICT RESTROOM FACILITY
Construct a new men's and women's restrootn facility on the north side of the Centennial
Playground located in the fake District area. The proposed project would consist of a single use
men's and women's restroom, concrete sidewalk, new sewer manhole, fence modifications,
plumbing, and electrical. This facility will be designed to fit within the current design criteria of the
Event Centre and the Lake Side Center. The estimated cost for the proposed restroom facility is
$488,000, This project would be funded out of the Capital Reserve fund.
LARGE AIRPORT HANGAR
Construct one 11,995 square foot clear -span pre-engineered large box hangar to accommodate
private aircraft. The proposed improvements would include the metal building, large hangar door,
concrete foundation, concrete access apron, electrical, fire detection, minimal landscaping, and
engineering fees. The estimated total cost for the large hangar is $2,329,000. This project would
be paid for with cash or financed through Certificates of Obligation.
NEW "T" HANGAR
Construct one ten -unit "T" hangar to accommodate the storage of ten small private aircraft. The
proposed improvements would include a pre-engineered metal building, bi-fold hangar doors,
concrete foundation, fire detection, electrical, concrete taxi lanes, one fire wall, and landscaping,
The estimated cost for the ten -unit "T" hangar is $2,800,000. This project would be financed
through Certificates of Obligation.
PARKS & RECREATION ENHANCEMENT PROGRAM
Add or replace park and recreation facilities and equipment throughout the City. This could
Include dog parks, replacement of larger playground equipment as well as other park and
recreational enhancements throughout the City. Locations and specific amenities would be
reviewed and approved by City Council. The estimated total cost for the program is $1,450,000.
The project would be paid for with Community Block Grant Program funds, grant funding and/or
available cash or financed through Certificates of Obligation.
City of Beaumont 230 FY23 Budget
PROPERTY LOCATED AT 4650 LAFIN ROAD
Purchase an existing facility located at 4650 Latin Road to utilize for the storage of surplus property
and Christmas decorations. The proposed facility could accommodate the distribution of disaster
supplies post storm and can be utilized for fleet auction items. The estimated cost for this facility,
including necessary upgrades, Is $1,600,000. This project would be paid for with cash.
PROPERTY LOCATED AT 555 MAIN STREET
The land is approximately 3.68 acres and will allow for the City to develop the site which may
include expanding Riverfront Park, providing public Spaces, and may facilitate the development of
restaurants and retail. The existing building will be demolished, the parking lot will be removed,
and the site will be Improved to allow for green spaces and various public amenities, The City
Council will decide the priorities and next steps regarding what amenities and improvements are
constructed. All costs and improvements are planned to be paid for with cash and is estimated to
be $5,000,000.
RIVERFRONT PARK IMPROVEMENTS
The City is working with FENIA and the US. Army Corps of Engineers on stabilizing the shoreline
along Riverfront Park, which was substantially damaged as a result of Hurricane Harvey. The
estimated cost for the stabilization is $28,150,000. This project will be primarily paid for with funding
from FEMA and the difference is projected to be paid from Certificates of Obligation that were
issued in 2013. The City Is also planning to construct pedestrian/bike paths, landscaping and
lighting improvements.
City of Beaumont 231 FY23 Budcgot
WATER AND SEWER PROJECTS FOR DESIGN OR CONSTRUCTION
ASSESSMENT OF SEWER COLLECTION SYSTEM PHASE Ill— CITY WIDE
Develop and implement a multiyear program for achieving and sustaining compliance with TCEQ
and U.S. EPA requirements for control of sewer overflows from the collection system. Phase Ili
includes flow monitoring and completion of a hydraulic model. The estimated cost for the project is
$660, 000.
BUNN'S CANAL REHABILITATION ENGINEERING
This project will provide for the design of levee and canal repairs to Bunn's Canal, Bunn's Canal is
the intake canal for Lawson's Pump Station that provides raw water to the Pine Street Surface
Water Treatment Plant, The estimated cost for this project is $400,000,
DEAD END FLUSHING
Federal and State regulations require the City of Beaumont to maintain chlorine residual in the
water distribution system. The dead-end lines in the system are required to be flushed on a monthly
basis to aid in maintaining the required disinfectant residual and protecting public health and safety.
The estimated cost for the project is $160,000 per year.
i HARRIOT LIFT STATION REHABILITATION
This project will provide for improvements at the Harriot Lift Station. Improvements will include
electrical, controls, and pumps. The estimated cost for the project is $2,000,000.
LAWSON'S CANAL, MAINTENANCE ENGINEERING AND PERMITTING
The City of Beaumont owns and maintains Lawson's Canal, which contains the raw water pipe from
Lawson's Pump Station to the pine St. Surface Water Treatment Plant. This project includes re-
setting, securing, cleaning, and installing air release valves on the existing raw water line. It will
also reconstruct and reinforce over 2 miles of the western levee. The estimated cost for the
engineering and permitting of this project is $1,050,000.
LIFT STATION ELECTRICAL IMPROVEMENTS
The City of Beaumont owns, operates, and maintains 77 sewer lift stations throughout the City.
This project will update outdated electrical control systems on Piney Point, Wall, and Mulberry. The
estimated cost for the project is $660,000.
LIFT „STATION REPAIRS AND MAINTENANCE
The City of Beaumont owns, operates, and maintains 77 sewer lift stations throughout the City.
This project will rehabilitate and clean deteriorated stations that require constant maintenance. The
estimated cost for the project Is $400,000 per year.
y,
City of Beaumont 232 FY23 Wedge!
LOEB MOTOR STARTER AND ELECTRICAL IMPROVEMENTS
This project will improve the existing electrical infrastructure at the Loeb Groundwater Treatment
Plant, replace motor starters, and elevate the generator and motor starters above previous flood
levels. The estimated cost for the project is $3,350,000. The City is trying to secure funding and
approval from FEMA (Federal Emergency Management Agency) to pay for 66% of the project.
Water Revenue Bonds will make up any difference between FEMA funds that may be provided and
the total project cost.
NEW RAW WATER DELIVERY LINE
If the New Raw Water Pump Station is built, a new raw water line will need to be constructed from
the pump station to the Water Production Plant located on Pine Street near Interstate 10. The
estimated cost of this project (construction and engineering) is $18,300,000, The City has applied
for federal funding in the amount of $9.8 million to be used towards the cost of this project. Water
Revenue Bonds will pay for the project if federal funds are not approved and will make up any
difference between federal funds that may be provided and the total project cost.
NEW RAW WATER PUMP STATION
A new 45 MGD (million gallons per day) Pump Station would be constructed near Pine Street and
Collier's Ferry Park. A new pump station is necessary in order to have a more resilient raw water
source from the Neches River. The Lawson Pump Station, as well as the Loeb Pump Station, failed
during Hurricane Harvey due to flooding. This new pump station would be constructed on higher
ground and serve as the City's main pump station for raw water, The estimated cost of this project
(construction, engineering and special services) is $29,060,000. The City is trying to secure funding
and approval from FEMA (Federal Emergency Management Agency) to pay for most of the project.
Water Revenue Bonds will pay for the project if FEMA funds are not approved and will make up
any difference between FEMA funds that may be provided and the total project cost.
ORANGE AVENUE WATER MAIN REHABILITATION
This project will renew a section of 20-inch cast iron water line crossing railroad tracks near Orange
Avenue. A leak was repaired in 2019 and the pipe is thought to be thinning from galvanic corrosion.
The estimated cost for the project is $400,000.
PINE STREET WATER PRODUCTION PLANT CHEMICAL IMPROVEMENTS
This project will Improve chemical treatment at the Pine Street Surface Water Treatment Plant. This
project will include additional caustic storage capacity to meet TCEQ requirements and will replace
the polymer dosage system. The estimated cost for the project is $1,600,000.
PINE STREET WATER PRODUCTION PLANT CHLORINE DIOXIDE INJECTION
This project will include piping and connections for chlorine dioxide pretreatment to remove metals
such as manganese and iron from the raw water and will aid in reducing discolored water In the
distribution system. The estimated cost for the project is $1,300,000.
City of Beaumont 233 FY23 Budget
PINE STREET WATER PRODUCTION PLANT SOUTH BASIN SLUDGE DRAIN REHABILITATION
This project will rehabilitate the clarifier basin sludge drain piping and valves at the Pine Street
Surface Water Treatment Plant, The estimated cost for the project is $600,000.
SEWER MAIN REHABILITATION
The City of Beaumont owns, operates, and maintains 743 miles of sewer lines that range in size
from 6 to 72 inches. Some of these lines were built in the early 1950's and have exceeded their life
expectancy. The estimated cost for the project for fiscal years 2023 through 2024 is $13,400,000
of which $9,900,00 is funded by the American Rescue Plan.
SOUTHWEST ELEVATED STORAGE TANK REHABILITATION
This project will rehabilitate the interior and exterior of the Southwest Elevated Storage Tank
located near Washington Boulevard and Municipal Drive. The estimated cost for the project is
$1,500,000,
WALL AND AVENUE C LIFT STATION REHABILITATION
This project will provide for the construction of a new control building at the Wall and Avenue C lift
station, and installation of all new electrical equipment, new submersible sewage pumps, and
modification to the existing wet well structure. The existing control equipment, located Inside the
existing dry pit, will be removed and salvaged. The estimated cost for the project is $2,200,000,
u
WASTEWATER TREATMENT PLANT ROAD REPAIRS
The roads inside the Wastewater Treatment Plant were constructed In the early 1950's. The roads
have reached the end of their useful life and are beginning to experience pavement failures due to
major construction projects inside the plant. The roads will receive an asphalt overlay, The
estimated cost for the project is $750,000,
WASTEWATER TREATMENT PLANT SLUDGE DEWATERING PHASE, 11 (DRYING BED
REHABILITATION PHASE 11
Drying Bed Rehabilitation Phase I will reconstruct four of the existing sludge drying beds, Including
new concrete walls, media, and underdrain piping. The estimated cost for the project is $875,000.
WATER LINT; AND FIRE HYDRANT INSTALLATION I REPLACEMENT
The City of Beaumont owns and operates 865 miles of water lines. Sixty percent of the water lines
have shown signs of deterioration. This project will replace approximately 20,000 linear feet of
water line per year. The estimated cost for the project is $2,000,000 per year.
City of Beaumont 234 FY23 Budget
WATER PRODUCTION SYSTEM — REPAIRS
The City owns, operates, and maintains a water system that consists of canals, deep wells, booster
pump stations, water treatment equipment and a complex control system which requires constant
maintenance, repairs, and replacements. The estimated cost for the project is $1,400,000.
WATER TRANSMISSION _UNE REHABILITATION
This project will sand blast and repair various water pipes crossing canals and ditches throughout
the City. The estimated cost for the project is $100,000 per year.
WETLANDS CELL 6 RESTORATION
This project will regrade portions of the largest wetland cell by filling in the channels that form
naturally with the water flow. The project will replant beneficial plants such as bulrush and
arrowheads to aid in ammonia -nitrogen removal. Cell 6 is approximately 79 acres and is 1 of 7 cells
that act as the last step in the wastewater treatment process. The estimated cost for this project is
$3,600, 000,
WATER AND SEWER FOR STREET PROJECTS
TxDOT M-101HWY 69 CARDINAL. INTERCHANGE
The Texas Department of Transportation (TxDOT) will rebuild the main lanes and feeder reads of
Interstate 10 (IH-10) from Walden Road to the Hollywood Ave overpass, and Highway 69 (Hwy
69) from 1H-10 to F'annett Road, The Notice of Required Accommodation (NORA) from TxDOT
dated December 15, 2020, confirms that the City must adjust any conflicting water and sewer
facilities, and the City Is eligible for reirnbursement for these costs. The estimated cost for this
project is $5,000,000.
TxDOT IH-101HWY 69 EASTEX INTERCHANGE
The Texas Department of Transportation (TxDOT) will rebuild the main lanes and Feeder roads
of Interstate 10 (IH-10) from the Hollywood Ave overpass to 7th Street, and Highway 69 (Hwy 69)
from IH-10 to Delaware Street. The City has not received a Notice of Required Accommodation
(NORA) for this project yet, but one is anticipated soon. The estimated cost for this project is
$14,400, 000.
Clty of Beaumont 236 PY23 Budget
WATER AND SEWER PROJECTS FOR CONSIDERATION
r
BUNN'S CANAL REHABILITATION
This project will provide for levee and canal repairs to return Hunn's Canal to the original
dimensions. Bunn's Canal is the intake canal for Lawson's Pump Station that provides raw water
to the Pine Street Surface Water Treatment Plant. The estimated cost for this project is $4,100,000,
DISHMAN TANK CHLORINE BOOSTER SYSTEM
This project would add chlorine treatment to the Dishman Elevated Storage Tank. This project Is
dependent on the results of the chemical improvements at the Loeb Groundwater Treatment Plant.
The estimated cost for the project is $400,000,
FLORIDA AVENUE INTERCEPTOR PHASE 1[
The Florida Avenue Interceptor was constructed in 1947. Phase I[ is approximately 2,400 linear
feet consisting of 21, 24 and 27-Inch concrete pipe. The Interceptor extends from the Florida
Avenue Lift Station to University Drive. This project was initiated due to failing joints, and a large
number of cavities in the existing concrete pipe causing infiltration of storm water, interrupting
service, increasing the number of overflows and impacting the Florida Avenue Lift Station's
efficiency. The estimated cost for the project Is $1,400,000.
LAWSON'S CANAL MAINTENANCE PROJECT
The City of Beaumont owns and maintains Lawson's Canal, which contains the raw water pipe from
Lawson's Pump Station to the Pine St. Surface Water Treatment Plant. This project includes re-
setting, securing, cleaning, and installing air release valves on the existing raw water line. It will
also reconstruct and reinforce over 2 miles of the western levee. The estimated cost for construction
of this project is $9,400,000.
LAWSON'S PUMP STATION PUMP REDUNDANCY
This project will increase redundancy at Lawson's Pump Station by adding an additional pump. The
estimated cost for the project is $200,000,
LOEB GROUNDWATER TREATMENT PLANT SULFUR TREATMENT
This project would add a sulfur removal treatment system to the Loeb Groundwater Treatment
Plant. The estimated cost for the project is $760,000.
NORTHWEST ELEVATED STORAGE TANK REHABILITATION
This projectwill rehabilitate the interior and exterior of the Northwest Elevated Storage Tank located
near East Lucas and Harding Street. The estimated cost for the project is $1,450,000,
City of Beaumont 230 FY23 Budget
PINT; STREET WATER PRODUCTION PLANT DESLUDGING PROJECT
This project will install a desludging unit at the Pine Street Surface Water Treatment Plant, The
clarifier basin sludge currently discharges to the collection system. This project will improve the
collection system downstream and prevent blockages from sludge build-up. The estimated cost for
the project is $2,600,000.
PINE STRggl TREATED WATER RESILIENCY LINE _ CONSTRUCTION
This project is required before the resiliency inspection. This project will construct an additional
transmission line from the Pine Street Surface Water Treatment Plant and add four isolation valves
on other lines near the plant. The line is approximately 3,500 linear feet and 42" in diameter. The
estimated cost for construction of the project is $7,600,000.
PINE STREET WATERLINE 1 REPLACEMENT
This project is dependent on the resiliency inspections. Line 1 is tied directly to the Pine Street
Surface Water Treatment Plant. The line is approximately 4,800 linear feet and 42" in diameter.
The estimated cost for the project is $6,000,000,
PINE STREET WATER LINE 2 REPLACEMENT
This project is dependent on the resiliency inspections. Line 2 is tied directly to the Pine Street
Surface Water Treatment Plant. The line is approximately 2,100 linear feet and 30" in diameter.
The estimated cost for the project is $2,100,000.
PINE STREET WATER LINE 3 REPLACEMENT
This project is dependent on the resiliency inspections. Line 3 is located between Isla Avenue and
McFaddin Avenue, The line is approximately 3,600 linear feet and 30" in diameter, The estimated
cost for the project is $3,600,000,
PINE STREET WATER LINE 4 REPLACEMENT
This project is dependent on the resiliency inspections. Line 4 is located between Pine Street and
N ML King Jr. Parkway. The line Is approximately 5,200 linear feet and 24" in diameter. The
estimated cost for the project is $4,700,000.
PINE STREET WATER LINE RESILIENCY INSPECTIONS
This project will Inspect the four main water transmission lines near the Pine Street Surface Water
Treatment Plant. The estimated cost for the project is $400,000.
City of Beaumont 237 FY23 Budget
PRISON GROUND STORAGE TANK REHABILITATION
This project will rehabilitate the interior and exterior of the Prison Ground Storage Tank located
north of TDCJ. The estimated cost for the project Is $900,000.
SOUTH ELEVATED STORAGE TANK REHABILITATION
This project will rehabilitate the interior and exterior of the South Elevated Storage Tank located
near Sabine Pass and Harriot Street, The estimated cost for the project is $1,300,000.
SEWER TRUNK LINE REHA131LITATION
The City of Beaumont owns, operates, and maintains 743 miles of sewer lines that range In size
from 6 to 72 inches. This project will aid in rehabilitating a portion of a major trunk line. The
estimated cost for the project is $3,000,000.
WASTEWATER TREATMENT PLANT AUTOMATIC TRANSFER SWITCHES
This project will replace the existing manual transfer system for both generators at the plant with a
medium voltage and a low voltage automatic transfer switch, including the installation of a
prefabricated building to house the new equipment. The estimated cost for the project is
$1,100,000.
i WASTEWATER TREATMENT PLANT CHLORINE CONTACT CLAMBER WALL REHABILITATION
This project will consist of a full re -coating of the chlorine contact chamber walls at the Wastewater
Treatment Plant. The estimated cost for the project is $400,000.
WASTEWATER TREATMENT PLANT DRYING BED REHABILITATION PHASE II
This project will reconstruct six of the existing sludge drying beds, including new concrete walls,
media, and underdra€n piping. The estimated cost for the project is $1,000,000,
WASTEWATER TREATMENT" PLANT HEADWORKS DEGRITTER
This project will add a degritter system to the front of the Wastewater 'f reatmont Plant to increase
the life expectancy of equipment at the plant. The estimated cost for the project is $1,600,000,
WASTEWATER TREATMENT PLANT HIGH FLOW DETENTION PONE)
This project will add a detention pond upstream of the Wastewater Treatment Plant for additional
capacity during heavy rain events, The estimated cost for the project is $6,250,000.
WASTEWATER TREATMENT PLANT HIGH FLOW STATION FLOW MONITORING
This projectwili add flow monitoring equipment to the high flow station at the Wastewater Treatment
' Plant. It will aid in analysis during rain events. The estimated cost for the project is $300,000.
City of Beaumont 238 FY23 Budget
WASTEWATER TREATMENT PLANT - PONt� NO.2 R1=HABILITATION
This project will remove accumulated solids, re -grade pond bottom, and install new aeration
equipment. The estimated cost for the project is $3,600,000,
WASTI=WATER TREATMENT PLANT - POND NO, 3 REHABILITATION
This project will remove accumulated solids, ro-grade pond bottom, and install new aeration
equipment. The estimated cost for the project is $1,850,000.
WEST Slnt= WATER TREATMENT PLANT
A new water treatment plant to be located on the west side of Beaumont and outside of flood prone
areas would treat surface water provided by the LNVA. The plant would be designed to provide 15
million gallons per day with the ability for the plant to be scaled up in tile future, If needed. Once
online, this plant would replace the Loeb ground water treatment plant. The estimated cost for this
project is $100,000,000. The City plans to submit a grant application to the Texas Department of
Emergency Management for a FEMA Hazard Mitigation Grant Program related to FEMA-DR-4485
(COVID-19 Pandemic), There is a 1Q% City match if this grant is approved.
WETLANDS SECONDARY BARSCREEN
This project will install an additional mechanical
additional flow capacity during heavy rain events.
barscreen at the wetlands effluent channel for
The estimated cost for the project Is $600,000,
WATERfSEWER for STREET PROJECTS
DOWLI N GOLLEGE TO IH-10
This project will replace approximately 650 linear feet of water lines with all related appurtenances.
In addition, this project will extend 16,500 linear feet of water and 16,500 linear feet of sanitary
sewer lines to serve proposed future developments. The estimated cost for the project is
$4,000,000.
POINTS PARKWAY NORTH
The project will install approximately 3,050 linear feet of 10, % 24-Inch sanitary sewer lines and
3,350 linear fleet of 6 and 8-inch water lines with all related appurtenances. The estimated cost far
the project is $650,000.
FY23 Budget
239
()'sty of Beaumont
Outstanding Debt
t
Relative to the assessed value of property within the Beaumont city limits, the outstanding general
obligation debt has ranged between a high of 3.39% at 10/01/2013 and a low of 2.06% at 10/0112021,
Outstanding
Assessed
Debt
Debt
Value
Ratio
10/01/12
194,680,600
6,785,451,898
2.86%
10101/13
231,093,060
6,824,647,428
3.39%
10/01/14
225,874,160
6,891,134,490
3.28%
10/01/15
217,504,350
6,936,933,700
3.14%
10101/16
209,874,250
7,209,192,016
2.91%
10101/17
203,806,150
7,426,450,861
2.74%
10/01/18
206,201,550
7,479,895,163
2.76%
10/01/19
198,471,550
7,669,216,149
2.59%
10101/20
188,981,550
7,883,980,459
2,39%
10/01/21
179,908,350
8,711,283,281
2.06%
As a percentage of total general government expenditures (General Fund and Debt Service), anneal tax
supported debt service payments have ranged from 11.82% to 13.76% during the period FY 2014 through
FY 2022.
Debt Service as
a Percent of
General
General
Fiscal
Government
Debt Service
Government
Year
Expenditures
__ Payments
Expenditures
2014
$ 114,418,462
$ 15,742,308
13.76%
2015
113, 908,102
15,654, 777
13.74%
2016
116,482,347
15,270, 220
13.11 %
2017
118,023,177
15,492,617
13.13%
2018
121, 607, 820
16,114,225
13.25%
2019
128,616,969
17,148,620
13.33%
2020
130,119,204
17,149, 922
13.18%
2021
141, 083,671
16,684,761
11.82 %
2022 (est,)
139,402,900
17,451,438
12.51%
City of Beauniont 240 FY23 Budgef
AUMAONT