HomeMy WebLinkAboutRES 22-185RESOLUTION NO. 22-185 WHEREAS, on February 25, 2020, the City Council of the City of Beaumont, Texas passed Resolution No. 20-042 awarding a contract in the amount of $1,097,150.00 to Texas Pride Utilities, LLC, of Houston Texas, for the Dowlen West Pipe Bursting Contract -Phase I Project; and, WHEREAS, on December 11, 2020, the City Manager executed Change Order No. 1, in the amount of $0.00, for the purpose of Cured -In -Place Piping (CIPP), in lieu of pipe bursting, for a section of sewer pipe found to be located in close proximity to a swimming pool, thereby having to effect on the total contract amount of $1,097,150.00; and, WHEREAS, on June 15, 2021, the City Council of the City of Beaumont, Texas passed Resolution No. 21-145 authorizing the City Manager to execute Change Order No. 2, in the amount of $32,100.00, for the addition of two (2) 10" point repairs over ten (10) vertical feet and two (2) structural -in -place trench box fabrications due to unforeseen obstructions found during the course of construction obstructing more than half of the 10" sewer main line, thereby increasing the total contract amount to $1,129,250.00; and, WHEREAS, Change Order No. 3, in the amount of ($270,714.00), and the addition of 157 calendar days is necessary to adjust the estimated quantities and contract time to reflect the actual quantities and contract time used in the completion of the project, thereby decreasing the total contract amount to $858,536.00; and, WHEREAS, the project has been inspected by the Water Utilities Department and found to be complete in accordance with the provisions and terms set forth in the contract; NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF BEAUMONT: THAT the statements and findings set out in the preamble to this resolution are hereby, in all things, approved and adopted; and, THAT the Interim City Manager be and he is hereby authorized to execute Change Order No. 3, in the amount of ($270,714.00) and the addition of 157 calendar days to adjust the estimated quantities and contract time to reflect the actual quantities and contract time used in the completion of the project, thereby decreasing the total contract amount to $858,536.00 for the Dowlen West Pipe Bursting Contract -Phase I Project; and, BE IT FURTHER RESOLVED THAT the Dowlen West Pipe Bursting Contract - Phase I Project be and the same is hereby accepted; and; BE IT ALSO RESOLVED THAT the Interim City Manager is authorized to make final payment in the amount of $42,926.80 to Texas Pride Utilities, LLC, of Houston, Texas. The meeting at which this resolution was approved was in all things conducted in strict compliance with the Texas Open Meetings Act, Texas Government Code, Chapter 551. PASSED BY THE CITY COUNCIL of the City of Beaumont this the 2nd day of August, 2022. - Mayor Robin Mouton - Dole: Julyr2Il, ^2Il22 project: DoWlen''I+Veel Pipe Bursllny C'aanlracl - Pa rtea I' County JoIffIrl on tlelriclw flealsmont Canlr+acl Numberr lint NO, WU1020.03 Caner: Cllyr of ttnaumonl conlraclay,r: Taxes Pride UIIIIIIos, L4AO Maui, I1jfjj41j[AM uM .• . Po w W. ry t s Wi„� W..a a i a �..n t.f .�.. Wbra;W, Al N'd 'W M 1 WWW �i� ie' a oW '�W a e � A �l. A.. q.....e W A A. _. a Ara w w ., af.a "bW:, W Mw a A Mw ar aa. a� Ma IMw as FulDop1hiRoplakofConc(stePayamont(IOl),w Mww. as A ��� ����� � W a". Y' ;u c r• ���� A ��� �� 1 M w a 14 rI m n I aw waa as i° � r'M wa r a w � W A Fum4ibondlnsloillgnd-*(.Lln*CloinoutibyExc4v,00onw l M N M M1�1 1 i ► w ObAructlon Removal byExcinvallon,W DaplhzM �w a�a wa wwa tw t oWooden Fences, and e; I A Wa , '''Wx outsum 104 Sowerto 10.764•M as a aM ww a� Milk �� r W '; W a # as a s , n r 'o a a w M M' ► M a 1 MI aF µ ORDER ORIGINAL CONTRACT AMOUNT: jiIIp.2Q NET FROM PREVIOUS CHANGE ORDERS, 3211010-20 TOTAL AMOUNT OF THIS CHANGE ORDER: O PERCEI roF THIS CwoE aR6iRr TOTAL PERC NT GIMP NGE ORDER TO DATE. .2 NEW CONTTRAOT AMOUNT; A +� /�y Cl U M0TI . ORIGINAL C NTRACT TIME, jj§ cakpdardlyl, ADDITIONAL CONTRA►OT TIhIE PER PREVIOUS CHANGE ORDERS; j12,_,,Sgk0j#Ejjg ADDITIONAL CONTRACT TIME PER THIS CHANCE ORDER: RSVISEC CONTRACT TIME: f24 catelLdir don sr *and V%cl*r &cknaaw,1adgRs apraaaaa that the w> Qjil moms In canincl prlaa aaniJ wtriet Ursa atWaled In We Change Order rapretenta MicompensaWn Iaar a l increaaaa' and datreeeean In the coal of, end Lha Ilnst ft4vired to perform Ih'a nrnllna vrlra under the contract aarift dkectl'tr cr InI frorr We, Change !Order tend all praYlaous, Change Oidara, Acoa,p:ancar of this 1YelYer conatlwlea an afire emenl betm,an Owner toad Contractor that the Charxlao C7:der re'preaenta art of Intlasalwa, owNalllr *geed upon a'd,Icalme'nt Iv the contract, and thm Conlin clot wo arralva till III to Olo aI clararrn on lhta Change Orderaanir It Is pro" ed., ACCEPT ED Byl PREPAI' EO BYt �16 2.0Z., Il. IE -AXPl la 3011 P FFI140I11, WAT6n aJ' lLff 0e01e11 ra�J�aarl,aananra REVIEWED tY: ruav 190 t Qk� MIN •a 111 v T 0 C asn calTYrlll0lrlearl�, DIRECTOR OF +rriw!hP°a�It1�t3+1�'�9dl#I�I!�laCo ifi" SERVICES APPROVED BY; ATTa TOD BY: one �A COY IIW IA01 11 �f I�iIIIU�, �IIruNI�I�l�l Uu�u��ul� '°'°�aal