HomeMy WebLinkAboutRES 22-116RESOLUTION NO. 22-116 WHEREAS, on March 9, 2021 the City Council of the City of Beaumont, Texas passed Resolution No. 21-056 awarding a contract in the amount of $671,493.01 to Placo, Ltd., of Lumberton, Texas, for the Lift Station & WWTP Repairs Tropical Storm Harvey Group 2 Lift Stations Project; and, WHEREAS, on September 22, 2021, the City Council of the City of Beaumont, Texas passed Resolution No. 21-217 authorizing the City Manager to execute Change Order No. 1, in the amount of $29,816.39, to increase the size of the flood barrier at Tyler Street Lift Station and increase the size of the electrical platforms at the Bennett Lift Station and Stonetown Lift Station to accommodate the larger electrical equipment required for the addition of the proposed Variable Frequency Drive (VFD) units to be added to the pump controls, thereby increasing the total contract amount to $701,309.40; and, WHEREAS, on March 22, 2022, the City Council of the City of Beaumont, Texas passed Resolution No. 22-091 authorizing the City Manager to execute Change Order No. 2, in the amount of $69,180.90, to remove and replace four (4) sets of pump guide rails and a pump base replacement at the Bennett Lift Station, thereby increasing the total contract amount to $770,490.30; and, WHEREAS, Change Order No. 3, in the amount of $19,481.70, is necessary to accommodate changes caused by larger pump power leads and furnish and install a new weatherhead at the Bennett Lift Station; and, furnish and install larger pump cable conduits and weatherhead at the Stonetown Lift Station, thereby increasing the total contract amount to $789,972.00; NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF BEAUMONT: THAT the statements and findings set out in the preamble to this resolution are hereby, in all things, approved and adopted; and, THAT the City Manager be and he is hereby authorized to execute Change Order No. 3, in the amount of $19,481.70 for the additional work described above, thereby increasing the total contract amount to $789,972.00 for the Lift Station & WWTP Repairs Tropical Storm Harvey Group 2 Lift Stations Project. The meeting at which this resolution was approved was in all things conducted in strict compliance with the Texas Open Meetings Act, Texas Government Code, Chapter 551. PASSED BY THE CITY COUKCIL of the City of Beaumont this the 26th day of April, 2022. -Mayor Pro-fe il'Audwin Samuel - DApriI13,2022 PROJECT-* City of Beaumont, Texas Lift Station $a WWTP Repairs Tropical Storm Harvey Group 7 Lift Stations Bid Noi . WU0121-11 / FCM'A #113512113477,135'1.0 OWNER: City of Beaumont, Teams 01 Main Street Beaumont, Texas 77704 CONTRACTOR Placo,� Ltd 11939 Lea,therw ood 'Drive Lumberton, Texas 77657 TO, THE OWNER: Approval of the following contract change Is requested. Reason for Change: Bennett Lift Station. Furnish, and Install larger pump cable conduits due to Increase In the size of the new pump P power leads,. furnish and Install a new weatherhead support due to having to remove the existing service pole, cure wet well trap slab to Install new pump lead conduits. Stoneto wn Lift. Station. Furnish and Install larger pump cable conduits due to increase In the size of the new Pump power leads and furnish and Install a new aweatherhead support due to having to remove the existing service pole. REVISED CONTRACT AMOUNT PER PREVIOUS CHANGE ORDERS: Sennett Lift Station, furnish and Install larger pump, cable cundults; furnish and Install a new weatherhead 3 support, core wet well top slab to Install new pump lead conduits. ADD 1.1, 1, . /L Stanetowvn lift Station, furnish and install larger pump cable conduits; furnish and Install a new weatherh ad support. ADD 7,869.85/L ' TOTAL AMOUNT OF THIS CHANGE ORDER: TOTAL REVISED CONTRACT AMOUNT INCLUDING THIS CHANGE ORDER: PERCENT OF THIS CHANGE ORDER TOTAL PERCENT CHANGE ORDER TO DATE CONTRACT TI 'lE Original Contract Time; Additional Contract Time per Previous Change Orders THIS CHANGE ORDER Additional Contract Time requested this Change Ender Revised Contract Time 7,869.85 19,481,70 ... .289,972.glo 2,90% 17 64%. 180 calendar days 153 calendar days 10 calendar days 343 calendardays CONDITION CHANGE: "Contractorp r agreesthat thecontract Ordercompensation for all Increases and decreases In the cost of, and the time required to perform! the entire work under the Contract arisini directly or Indirectly from this Change Order and all previous Change Orders. Acceptance of this waiver constitutes an agreement between Owner and Contractor that the Change Order represents an all inclusive, mutually agreed upon adjustment to the Contract, and that Contractor, will' waive all rights to file a! claim on thl's Change op~ i A W qL lac o-Ltdi Amalia Villarreal,, P.E. 1 Con:t actor City Engineer 4 t ill Reco e b Approved by Scha umubu & Polk, Inc. Chris Boone Engine r Interim City Manager Date: Date: Tina Broussard City Clerk Me: 4k