Loading...
HomeMy WebLinkAboutRES 22-086RESOLUTION NO. 22-086 WHEREAS, construction of the street, sewer, and water improvements constructed in Pine Glen Fifth Addition Subdivision Phase 2, Section 2 have been completed as follows: and, Streets • Essie Lane approximately 490 feet extension heading south from existing Essie Lane to extension of Sheila Lane. • Sheila Lane approximately 300 feet extension heading west from existing Sheila Lane to end of pavement. Street Maintenance, Sewer, and Water Improvements • Pine Glen Fifth Addition Subdivision Phase 2, Section 2 right-of-way only; WHEREAS, the developers of said improvements desire to have these improvements accepted and maintained by the City; and, WHEREAS, the director of the Public Works has determined that said improvements meet City standards and qualify for acceptance for permanent maintenance, and the City Council is of the opinion that said improvements should be accepted and maintained by the City of Beaumont; NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF BEAUMONT: THAT the statements and findings set out in the preamble to this resolution are hereby, in all things, approved and adopted; and, THAT the above -referenced street, water and sanitary sewer improvements in Pine Glen Fifth Addition Subdivision Phase 2, Section 2 rights -of -way, with the exception of streetlights, are hereby accepted by the City of Beaumont and shall be continuously maintained by the City contingent upon filing of the final plat, complete with filings of dedication of all rights -of -way and easements required on the preliminary and final plats and installation of the streetlights. The meeting at which this resolution was approved was in all things conducted in strict compliance with the Texas Open Meetings Act, Texas Government Code, Chapter 551. PASSED BY THE CITY COUNCIL of the City of Beaumont this the 22nd day of March, 2022. Y�' $ - Mayor Robin Mouton - VICINITY MAP N.T.S.