HomeMy WebLinkAboutRES 22-091RESOLUTION NO. 22-091 WHEREAS, on March 9, 2021 the City Council of the City of Beaumont, Texas passed Resolution No. 21-056 awarding a contract in the amount of $671,493.01 to Placo, Ltd., of Lumberton, Texas, for the Lift Station & WWTP Repairs Tropical Storm Harvey Group 2 Lift Stations Project; and, WHEREAS, on September 22, 2021, the City Council of the City of Beaumont, Texas passed Resolution No. 21-217 authorizing the City Manager to execute Change Order No. 1, in the amount of $29,816.39, to increase the size of the flood barrier at Tyler Street Lift Station and increase the size of the electrical platforms at the Bennettt Lift Station and Stonetown Lift Station to accommodate the larger electrical equipment required for the addition of the proposed Variable Frequency Drive (VFD) units to be added to the pump controls, thereby increasing the total contract amount to $701,309.40; and, WHEREAS, Change Order No. 2, in the amount of $69,180.90, is necessary to remove and replace four (4) sets of pump guide rails and a pump base replacement at the Bennett Lift Station, thereby increasing the total contract amount to $770,490.30; NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF BEAUMONT: THAT the statements and findings set out in the preamble to this resolution are hereby, in all things, approved and adopted; and, THAT the City Manager be and he is hereby authorized to execute Change Order No. 2, in the amount of $69,180.90 for the additional work described above, thereby increasing the total contract amount to $770,490.30 for the Lift Station & WWTP Repairs Tropical Storm Harvey Group 2 Lift Stations Project. The meeting at which this resolution was approved was in all things conducted in strict compliance with the Texas Open Meetings Act, Texas Government Code, Chapter 551. PASSED BY THE CITY COUNCIL of the City of Beaumont this the 22nd day of March, 2022. .n,p`1, "NY C - Mayor Robin Mouton - CHANGE ORDER No. Two FebruaryM PROJECT: City of Beaumont, Texas Lift Station & WWTP Repairs Tropical Storm Harvey Group 7 lift Stations Bid No. W''UO171-11 1 EMA 11135121 3477,13510 Oi NERV City of Beaumont, Texas 801 Main Street Beaumont, Texas 77704 CONTRACTOR: Placo, Ltd 11939 Leatherwood Drive Lumberton, Texas 77657 TO THE OWNER: Approval of the following contract change is requested. Reason for Change: To 'Remove and replace four (4) sets of pump guide rails and pumps base replacement at the 'Bennett Lift Station. This Change Order is not eligible for FEl" A reimbursement. .......... 11111 1 11 m r i ORDERTHIS CHANGE New Item Description Remove and replace four y sets of pump guide rails and pump base replacement at the Bennett lift Station, Including sump clean out, rail and hardware, labor, pickup and small tools, bypass pumping, crane rental, bond and builders risk Increase and 15% markup. ADD $ , .90/L TOTALA ORDER,TOTAL REVISED CONTRACT AMOUNT INCLUDING THIS CHANGE PERCENT ORDER TOTALDTO DATE ContractCONTRACTTIME Original Additional aPrevious Change e Addlitiona I Contra ct Time per this Change Orders Revised Contract Time I 69,180.90 770,490.30 0.3 144.74 180 calendar days calendar74 calendar days calendar CHANGE:CONDITIONOF rights"Contractor a�cknowled'ges and agrees that the: adjustments In, contract price and contract time stipulated in this Charige Order represents, full compensation for all Increases and decreases in the cost of, and the time required to perform the entire work under the Contract arising directly or Indirectly from this Change Order and all previous Change Orders. Acceptance of this waiver constitutes an agreement between Owner and Contractor that the Change Order represents an all Inclusive, mutuailly agreed upon adjustment to the Contract, and that Contractor will waive all on ■ : . pe n l w d ,. "" Approved by. i Schaumburg & P , inc 'Kyle Mayes Engineer W . � Ida w .. City Manager o Date: Date'