HomeMy WebLinkAboutRES 22-091RESOLUTION NO. 22-091
WHEREAS, on March 9, 2021 the City Council of the City of Beaumont, Texas
passed Resolution No. 21-056 awarding a contract in the amount of $671,493.01 to
Placo, Ltd., of Lumberton, Texas, for the Lift Station & WWTP Repairs Tropical Storm
Harvey Group 2 Lift Stations Project; and,
WHEREAS, on September 22, 2021, the City Council of the City of Beaumont,
Texas passed Resolution No. 21-217 authorizing the City Manager to execute Change
Order No. 1, in the amount of $29,816.39, to increase the size of the flood barrier at
Tyler Street Lift Station and increase the size of the electrical platforms at the Bennettt
Lift Station and Stonetown Lift Station to accommodate the larger electrical equipment
required for the addition of the proposed Variable Frequency Drive (VFD) units to be
added to the pump controls, thereby increasing the total contract amount to
$701,309.40; and,
WHEREAS, Change Order No. 2, in the amount of $69,180.90, is necessary to
remove and replace four (4) sets of pump guide rails and a pump base replacement at
the Bennett Lift Station, thereby increasing the total contract amount to $770,490.30;
NOW, THEREFORE, BE IT RESOLVED BY THE
CITY COUNCIL OF THE CITY OF BEAUMONT:
THAT the statements and findings set out in the preamble to this resolution are hereby,
in all things, approved and adopted; and,
THAT the City Manager be and he is hereby authorized to execute Change
Order No. 2, in the amount of $69,180.90 for the additional work described above,
thereby increasing the total contract amount to $770,490.30 for the Lift Station & WWTP
Repairs Tropical Storm Harvey Group 2 Lift Stations Project.
The meeting at which this resolution was approved was in all things conducted in
strict compliance with the Texas Open Meetings Act, Texas Government Code, Chapter
551.
PASSED BY THE CITY COUNCIL of the City of Beaumont this the 22nd day of
March, 2022.
.n,p`1, "NY C
- Mayor Robin Mouton -
CHANGE ORDER No. Two
FebruaryM
PROJECT: City of Beaumont, Texas
Lift Station & WWTP Repairs
Tropical Storm Harvey
Group 7 lift Stations
Bid No. W''UO171-11 1 EMA 11135121 3477,13510
Oi NERV City of Beaumont, Texas
801 Main Street
Beaumont, Texas 77704
CONTRACTOR: Placo, Ltd
11939 Leatherwood Drive
Lumberton, Texas 77657
TO THE OWNER: Approval of the following contract change is requested.
Reason for Change: To 'Remove and replace four (4) sets of pump guide rails and pumps base replacement at the 'Bennett Lift Station. This
Change Order is not eligible for FEl" A reimbursement.
.......... 11111 1 11 m r i
ORDERTHIS CHANGE
New Item Description
Remove and replace four y sets of pump guide rails and pump base replacement at the Bennett lift
Station, Including sump clean out, rail and hardware, labor, pickup and small tools, bypass pumping,
crane rental, bond and builders risk Increase and 15% markup. ADD $ , .90/L
TOTALA
ORDER,TOTAL REVISED CONTRACT AMOUNT INCLUDING THIS CHANGE
PERCENT ORDER
TOTALDTO DATE
ContractCONTRACTTIME
Original
Additional aPrevious Change e
Addlitiona I Contra ct Time per this Change Orders
Revised Contract Time I
69,180.90
770,490.30
0.3
144.74
180 calendar days
calendar74
calendar days
calendar
CHANGE:CONDITIONOF
rights"Contractor a�cknowled'ges and agrees that the: adjustments In, contract price and contract time stipulated in this Charige Order represents, full
compensation for all Increases and decreases in the cost of, and the time required to perform the entire work under the Contract arising directly
or Indirectly from this Change Order and all previous Change Orders. Acceptance of this waiver constitutes an agreement between Owner and
Contractor that the Change Order represents an all Inclusive, mutuailly agreed upon adjustment to the Contract, and that Contractor will waive all
on ■ : .
pe n l w d ,. ""
Approved by.
i
Schaumburg & P , inc
'Kyle Mayes
Engineer W .
�
Ida w ..
City Manager
o
Date:
Date'