HomeMy WebLinkAboutRES 22-036RESOLUTION NO. 22-036
WHEREAS, on December 15, 2020 the City Council of the City of Beaumont,
Texas passed Resolution No. 20-279 awarding a contract in the amount of $721,615.00
to BDS Constructors, LLC d/b/a MK Constructors, of Vidor, Texas, for the Primer Street
Lift Station Repairs Contract Project; and,
WHEREAS, on October 26, 2021, the City Council of the City of Beaumont,
Texas passed Resolution No. 21-279 authorizing the City Manager to execute Change
Order No. 1, in the amount of $18,356.00, to remove and replace the existing
deteriorated ductile iron piping and fittings in the wet well, thereby increasing the total
contract amount to $739,971.00; and,
WHEREAS, on December 7, 2021, the City Council of the City of Beaumont,
Texas passed Resolution No. 21-318 authorizing the City Manager to execute Change
Order No. 2, in the amount of $87,620.00, to install a valve to isolate the force main
from the drywell to remove and replace the existing valves, fittings and piping, thereby
increasing the total contract amount to $827,591.00; and,
WHEREAS, Change Order No. 3, in the amount of $59,225.00, is necessary to
install a new twelve inch (12") bypass port and related appurtenances, thereby
increasing the total contract amount to $886,816.00;
NOW, THEREFORE, BE IT RESOLVED BY THE
CITY COUNCIL OF THE CITY OF BEAUMONT:
THAT the statements and findings set out in the preamble to this resolution are hereby,
in all things, approved and adopted; and,
THAT the City Manager be and he is hereby authorized to execute Change
Order No. 3, in the amount of $59.225.00 for the additional work described above,
thereby increasing the total contract amount to $886,816.00 for the Primer Street Lift
Station Repairs Contract Project.
The meeting at which this resolution was approved was in all things conducted in
strict compliance with the Texas Open Meetings Act, Texas Government Code, Chapter
551.
PASSED BY THE CITY COUNCIL of the City of Beaumont this the 1st day of
February, 2022.
'9,
- Mayor Robin Mouton -
CHANCE ORDER No, Three (5)
DATE: January 20, 2022
PROJECT. City of Beaumont, Texas
Lift Station & W TP Repairs
Tropical Storm Harvey
Primer Street Lift Station
Eld' No. WU1021-01 / FEMA II �8352
OWNER: City of Beaumont, Texas
801 Main street
Beaumont, Texas 77704
CONTRACTOR,. MK Constructers
4E5 North Street
vidor, Texas 77652
TO THE OWNEI1 Approval of the following contract change Is requested',
Reason for Change: To furnish all labor, materlals and equipment to Install one (1) 15""x12" tapping sleeve and valve with additional fittings
for bypass discharge 12" tap Included), temporary relocation of ongoing bypass discharge, additional shoring for the existing manhole, water
line and ditch for the valves Installation, road restoration and traffic control for road closure.
ORIGINAL CONTRACT AMOUNT* � 2116 ..0
REVISED 'I,SED CONTRACTAMOUNT PER PREVIOUS CHANGE ORDERS 827 591.00
THIS CHANGE ORDER
Iter I DDescrl ti.
12 Furnish all labor, materials and equipment to Install one (1) 1€31'x1211 tapping sleeve and valve with 5902255,00
additional fittings for bypass discharge (1 " tap Included), temporary relocation of ongoing bypass
discharge, additional shoring for the existing manhole, water line and ditch for the valves Installation,
road restoration and traffic control for read closure, ADD , 59,2 5.00/LUMP SUM
TOTAL AMOUNT CIF THIS CHANGE ORDER:
59,225,00
TOTAL REVISED CONTRACT AMOUNT INCLUDING THIS CHANGE ORDER:
.886,, 816.00
PERCENT OF THIS CHANCE 0111DER
5.21%
TOTAL PERCENT CHANGE ORDER TO DATE
22,89
CONTRACT "TIME
Original Con,tractT'lme
180 calendar days
Additional Contract Time per Previous Change Orders
112 calendar days
Additional Contract TIme per this Change orders
40 calendar days
Revised Contract Time
332 calendar days
CONDITION OF CHANGE
"Contractor acknowledges and agrees that the adjustments In contract price and contract time stipulated' In this Change order represents full
compensation for all Increases and decreases In the cost of and' the time required to perform the entire work under the Contract arising
directly or Indirectly, from this Change Carder and all previous Change Orders. Acceptance of this waiver constitutes an agreement between
Owner and Contractor that the Change order represents an all Inclusive, mutually agreed udjustrnent to the Contract, and that
Contractor will waive all rights to file a claim on this Change Carder after It Is properly executed,"" pon
Ml( Constructors
Contractor
Reviewed' by
Arnalla Villarreal, P,E,
City Engineer
I ) "), b &
Date..
Director of Public worms
and Technology Services
Date;
Tina Droussard
City Clerk
t.,